• 제목/요약/키워드: Assembly Sequence

검색결과 280건 처리시간 0.027초

Optimum Disassembly Sequence Generation of Parts for Recycling (리사리클링을 위한 부품의 최적 해체경로 생성에 대한 연구)

  • Lee K.S.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 한국정밀공학회 2005년도 추계학술대회 논문집
    • /
    • pp.824-827
    • /
    • 2005
  • This paper represents a study on disassembly sequence generation for automobile parts. This is particularly useful because adequate end-of-life disassembly becomes crucial as take-back obligations are imposed for environmental reasons. Therefore in this paper a method is suggested to automatically derive all the feasible subassemblies and feasible actions between them from the assembly modeling files. As a result, in consideration of the all pars and subassemblies the optimum disassembly sequence is generated. And the optimum disassembly sequence for a certain part or subassembly can be also generated.

  • PDF

Scheduling Methodology for MCP(Multi-chip Package) with Layer Sequence Constraint in Semiconductor Package (반도체 Package 공정에서 MCP(Multi-chip Package)의 Layer Sequence 제약을 고려한 스케쥴링 방법론)

  • Jeong, Young-Hyun;Cho, Kang-Hoon;Choung, You-In;Park, Sang-Chul
    • Journal of the Korea Society for Simulation
    • /
    • 제26권1호
    • /
    • pp.69-75
    • /
    • 2017
  • An MCP(Multi-chip Package) is a package consisting of several chips. Since several chips are stacked on the same substrate, multiple assembly steps are required to make an MCP. The characteristics of the chips in the MCP are dependent on the layer sequence. In the MCP manufacturing process, it is very essential to carefully consider the layer sequence in scheduling to achieve the intended throughput as well as the WIP balance. In this paper, we propose a scheduling methodology considering the layer sequence constraint.

Design of Reactor Head Structure Assembly Using Axiomatic Design (설계공리를 이용한 원자로상부구조물의 설계)

  • Choi, Woo-Seok;Lee, Gyu-Mahn;Kim, Tae-Wan;Kim, Jong-In
    • Proceedings of the KSME Conference
    • /
    • 대한기계학회 2007년도 춘계학술대회A
    • /
    • pp.300-304
    • /
    • 2007
  • The reactor head structure assembly(RHSA) is the structure located on the reactor assembly. The purpose of the assembly is providing interface location for cables, preventing pipe whips, prohibiting instruments from becoming missiles, and restraining CEDMs' horizontal motion. On the RHSA, reactor disconnect panels(RDP) are installed. The installation location of RDP is to be decided to minimize the geometric interface with other components. Since the neighborhood of RHSA is crowded due to many connectors and cables, it is necessary to find the good design of RHSA to make an intricate situation attenuated and the required function maintained. The geometric shape and overall configuration of RHSA are determined by axiomatic design approach. The FRs of RHSA are specified and the corresponding DPs are found to satisfy FRs in sequence. The finite element analysis is carried out based on the result of the axiomatic design to evaluate the structural integrity.

  • PDF

Perspectives on Functional Genomics

  • Song, Kyuyoung
    • Biotechnology and Bioprocess Engineering:BBE
    • /
    • 제5권5호
    • /
    • pp.307-312
    • /
    • 2000
  • As the first assembly of the human genome was announced on June 26, 2000, we have entered post genome era. The genome sequence represents a new starting point for science and medicine with possible impact on research across the life sciences. In this review I tried to offer brief summaries of history and progress of the Human Genome Project and two major challenges ahead, functional genomics and DNA sequence variation research.

  • PDF

Robotic welding system for sub-assembly line in ship manufacturing (로봇을 이용한 조선 소조립 용접 자동화 시스템)

  • 김진오;신정식;김성권
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 한국자동제어학술회의논문집(국내학술편); 포항공과대학교, 포항; 24-26 Oct. 1996
    • /
    • pp.516-519
    • /
    • 1996
  • Sub-assembly in ship manufacturing is a sequence of filet joint welding of stiffeners on metal panels and the process is different depending on companies. In this paper, we introduce a new intelligent robotic system of the sub-assembly process in Samsung Heavy Industry, where one shift of 22m * 9m workspace includes one to ten panels and each panel includes up to 10 stiffeners. The inherent problems such as several hundreds of different panels, unstructured task environment and the large scale do not allow a fixed automation, but needs highly intelligent versatile automation. The robotic system is composed of four 14DOF macro-mini robots and a task recognition system. Application of this system has verified the task specification such as low temperature environment(-10.deg. C) and productivity is satisfied successfully.

  • PDF

Sequencing for a mixed model assembly line in just-in-time production system (JIT 상황하에서 다품종 조립라인 작업물 투입 순서 결정 방안)

  • Hwang, Hark;Jeong, In-Jae;Lim, Joon-Mook
    • Korean Management Science Review
    • /
    • 제11권1호
    • /
    • pp.91-106
    • /
    • 1994
  • In mixed model assembly lines, products are assembled seqeuntially that have different combination of options specified by customers. In just in time (JIT) environment, production smoothing becomes an important issue for sub-lines which supply the necessary parts to each workstation of the assembly line. Another important issue is to avoid line stopping caused by work overload in workstations. To find a sequence which minimizes the costs associated with line stoppage and the option parts inventory level, a nonlinear mixed integer programming is formulated. Recognizing the limit of the Branch and Bound technique in large sized problems, a heuristic solution procedure is proposed. The performance of the heuristic is compared with the Branch and Bound technique through randomly generated test problems. The computational results indicate that on the average the heuristic solutions deviate approximately 3.6% from the optimal solutions.

  • PDF

Tabu Search for Sequencing to Minimize the Utility Work (가외작업을 최소로 하는 투입순서 결정을 위한 Tabu Search)

  • Hyun, Chul-Ju
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 한국품질경영학회 2009년도 추계학술대회
    • /
    • pp.131-135
    • /
    • 2009
  • This paper considers the sequencing of products in car assembly lines. The sequence which minimizes overall utility work in car assembly lines reduce the cycle time and the risk of conveyor stopping. The sequencing problem is solved using Tabu Search. Tabu Search is a heuristic method which can provide a near optimal solution in real time. The performance of proposed technique is compared with existing heuristic methods in terms of solution quality and computation time. Various examples are presented and experimental results are reported to demonstrate the efficiency of the technique.

  • PDF

A study on the method of efficient PCB assembly by separation of crowed area and double allocation of slot (밀집구역분리와 슬롯이중배정에 의한 효율적 PCB 조립 방법의 연구)

  • Moon, Gee-Ju;Chang, Jae-Hyuk
    • Journal of the Korea Society for Simulation
    • /
    • 제14권2호
    • /
    • pp.25-34
    • /
    • 2005
  • Determination of component mounting sequence on printed circuit board assembly process is a typical NP-hard problem. It is a kind of traveling salesman problems, but it has one more hard to meet constraint of matching component type per mounting position as well as searching the shortest path. An efficient method is developed by separation of crowed area and allowing up to two slots per component type. A simulation model is constructed using Visual C++ for evaluation of the suggested heuristic.

  • PDF

Sequencing to Minimize the Total Utility Work in Car Assembly Lines (자동차 조립라인에서 총 가외작업을 최소로 하는 투입순서 결정)

  • 현철주
    • Journal of the Korea Safety Management & Science
    • /
    • 제5권1호
    • /
    • pp.69-82
    • /
    • 2003
  • The sequence which minimizes overall utility work in car assembly lines reduces the cycle time, the number of utility workers, and the risk of conveyor stopping. This study suggests mathematical formulation of the sequencing problem to minimize overall utility work, and present a genetic algorithm which can provide a near optimal solution in real time. To apply a genetic algorithm to the sequencing problem in car assembly lines, the representation, selection methods, and genetic parameters are studied. Experiments are carried out to compare selection methods such as roullette wheel selection, tournament selection and ranking selection. Experimental results show that ranking selection method outperforms the others in solution quality, whereas tournament selection provides the best performance in computation time.

Optimization of Robot Welding Process of Subassembly Using Genetic Algorithm in the Shipbuilding (유전자 알고리즘을 이용한 조선 소조립 로봇용접공정의 최적화)

  • Park, Ju-Yong;Seo, Jeong-Jin;Kang, Hyun-Jin
    • Journal of Welding and Joining
    • /
    • 제27권2호
    • /
    • pp.57-62
    • /
    • 2009
  • This research was carried out to improve the productivity in the subassembly process of shipbuilding through optimal work planning for the shortest work time. The work time consist of welding time, moving time of gantry, teaching time of robot and robot motion time. The shortest work time is accomplished by even distribution of work and the shortest welding sequence. Even distribution of work was done by appling the simple algorithm. The shortest work sequence was determined by using GA. The optimal work planning decreased the total work time of the subassembly process by 4.1%. The result showed the effectiveness of the suggested simple algorithm for even distribution of work and GA for the shortest welding sequence.