• Title/Summary/Keyword: Assembly Constraints

Search Result 108, Processing Time 0.024 seconds

Ontology-based Semantic Assembly Modeling for Collaborative Product Design (협업적 제픔 설계를 위한 온톨로지 기반 시맨틱 조립체 모델링)

  • Yang Hyung-Jeong;Kim Kyung-Yun;Kim Soo-Hyung
    • The KIPS Transactions:PartB
    • /
    • v.13B no.2 s.105
    • /
    • pp.139-148
    • /
    • 2006
  • In the collaborative product design environment, the communication between designers is important to capture design intents and to share a common view among the different but semantically similar terms. The Semantic Web supports integrated and uniform access to information sources and services as well as intelligent applications by the explicit representation of the semantics buried in ontology. Ontologies provide a source of shared and precisely defined terms that can be used to describe web resources and improve their accessibility to automated processes. Therefore, employing ontologies on assembly modeling makes assembly knowledge accurate and machine interpretable. In this paper, we propose a framework of semantic assembly modeling using ontologies to share design information. An assembly modeling ontology plays as a formal, explicit specification of a shared conceptualization of assembly design modeling. In this paper, implicit assembly constraints are explicitly represented using OWL (Web Ontology Language) and SWRL (Semantic Web Rule Language). The assembly ontology also captures design rationale including joint intent and spatial relationships.

Stringer Shape Optimization of Aircraft Panel Assembly Structure (항공기 패널 조립체 구조물의 스트링거 형상 최적화)

  • Kim Hyoung-Rae;Park Chan-Woo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.23 no.6 s.183
    • /
    • pp.136-142
    • /
    • 2006
  • Optimization of the aircraft panel assembly constructed by skin and stringers is investigated. For the design of panel assembly of the aircraft structure, it is necessary to determine the best shape of the stringer which accomplishes lowest weight under the condition of no instability. A panel assembly can fail in a variety of instability modes under compression. Overall modes of flexure or torsion can occur and these can interact in a combined flexural/torsion mode. Flexure and torsion can occur symmetrically or anti-symmetrically. Local instabilities can also occur. The local instabilities considered in this paper are buckling of the free and attached flanges, the stiffener web and the inter-rivet buckling. A program is developed to find out critical load for each instability mode at the specific stringer shape. Based on the developed program, optimization is performed to find optimum stringer shape. The developed instability analysis program is not adequate for sensitivity analysis, therefore RSM (Response Surface Method) is utilized instead to model weight and instability constraints. Since the problem has many local minimum, Genetic algorithm is utilized to find global optimum.

The Integrated Process Planning and Scheduling in Flexible Assembly Systems using an Endosymbiotic Evolutionary Algorithm (내공생 진화알고리듬을 이용한 유연조립시스템의 공정계획과 일정계획의 통합)

  • Song, Won-Seop;Shin, Kyoung-Seok;Kim, Yeo-Keun
    • IE interfaces
    • /
    • v.17 no.spc
    • /
    • pp.20-27
    • /
    • 2004
  • A flexible assembly system (FAS) is a production system that assembles various parts with many constraints and manufacturing flexibilities. This paper presents a new method for efficiently solving the integrated process planning and scheduling in FAS. The two problems of FAS process planning and scheduling are tightly related with each other. However, in almost all the existing researches on FAS, the two problems have been considered separately. In this research, an endosymbiotic evolutionary algorithm is adopted as methodology in order to solve the two problems simultaneously. This paper shows how to apply an endosymbiotic evolutionary algorithm to solving the integrated problem. Some evolutionary schemes are used in the algorithm to promote population diversity and search efficiency. The experimental results are reported.

Representation of Spatial Relationships for Sheet Metal Weld Assemblies Modeling (박판 용접구조물의 모델링을 위한 공간관계 표현)

  • 김동원;김경윤
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.04a
    • /
    • pp.400-404
    • /
    • 1997
  • This paper presents spatial relationshaps and engineering features for the feature based modeling of Sheet Metal Weld Assemblies (SMWA) that are made of sheet metal components through are welding processes. Spatial relationships in ProMod-S, a sheet metal product modeler,are further extended for the SMWA modeling. Some spatial relationships for special weld joint types are newly introduced. The geometrical and topological relations between spatial reationship, mating features, and assembly features are defined. Finally, assembly data stucturess for the product modeling of SMWA are proposed. They are an engineering relation to represent the constraints between component features, and a mating bond to integrate component design information.

  • PDF

Optimized Motion Planning Considering the Lifetime for Bimanual Robotic Assembly (양팔 로봇을 이용한 조립 작업에서 수명을 고려한 최적 운동 계획법)

  • Hwang, Myun Joong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.21 no.10
    • /
    • pp.972-976
    • /
    • 2015
  • The objective of this research is to verify the quantitative efficiency of a bimanual robotic task. Bimanual robots can realize dexterous and complicated motions using two cooperating arms. However, its motion planning and control method are not simple for implementing flexible tasks such as assembly. In this paper, the proposed motion planning method is used to find an optimal solution satisfying a designed cost function and constraints with regard to the kinematics and redundancy of the bimanual robot. The simulation results show that the lifetime of the manipulator can be changed by the proposed cost function consisting of angular velocity and angular acceleration of each joint in the same assembly task.

Tolerance Analysis of Spline Shaft Assembly (스플라인 샤프트 공차해석)

  • Lee, Jang-Yong
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.27 no.12
    • /
    • pp.75-83
    • /
    • 2010
  • Every mechanical part for mass production has dimensions with tolerances in engineering drawing. Tolerance is given to guarantee assemble parts together satisfying functional requirements and dimensional constraints. Tolerance is essential factor for standardization of parts or assembly and has huge influence on manufacturing cost. It will be desirable to have tolerances as broad as possible for minimizing manufacturing cost. This paper describes tolerance analysis of u-joint assembly that is a part of automobile steering system. Within the range of tolerances of parts, accumulated effect is estimated by arithmetic calculation, probability theory and Monte carlo simulation. Each result is compared to investigate the method for increasing productivity.

Methodology of Tolerance Analysis of Deformable Assembly (변형을 고려한 공차분석 방법론)

  • Lee, Kwang-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.6
    • /
    • pp.20-26
    • /
    • 2007
  • The new integrated CAD-CAM systems induce an increasing demand for simulation tools, which are able to simulate industrial part assembly processes by welding, gluing, riveting or bolting(more generally by fastening). Concerning fastened flexible parts, there exist no efficient computational aid on tolerance and methodology available on the field. The first part briefly presents the approach method based on the finite element method for TADA(Tolerance Analysis of Deformable Assemblies). The second part compares the results obtained by simulation using the commercial FEM code with the measurements. The principal elements of dispersion have been identified and studied on an experimental basis in order to test the robustness of the TADA model. This has enabled us to verify the model's possibilities as regards industrial constraints such as the use of incompatible meshes or the use of triangular elements and so on.

A Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints

  • Jeon Hyong-Bae;Kim Jun-Gyu;Kim Hwa-Joong;Lee Dong-Ho
    • Management Science and Financial Engineering
    • /
    • v.12 no.1
    • /
    • pp.95-112
    • /
    • 2006
  • Disassembly scheduling is the problem of determining the quantity and timing of disassembling used or end-of-life products while satisfying the demand of their parts and/or components over a planning horizon. The case of assembly product structure is considered while the resource capacity constraints are explicitly considered. A cost-based objective is considered that minimizes the sum of disassembly operation and inventory holding costs. The problem is formulated as an integer programming model, and a two-stage heuristic with construction and improvement algorithms is suggested in this paper. To test the performance of the heuristic, computational experiments are done on randomly generated problems, and the results show that the heuristic gives near optimal solutions within a very short amount of computation time.

A Study on the Body Welding Operation Scheduling Considering the Assembly Line's Input Sequence in Construction Equipment Manufacturing (건설기계 조립 라인 투입 순서를 고려한 제관 공정 생산 스케줄링에 관한 연구)

  • Kim, Ki-Dong;Choi, Ho-Sik
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.69-76
    • /
    • 2007
  • The body of an excavator, one sort of the construction equipment, consists of mainframe part, track frame part, boom part and arm part. The all parts are manufactured in the body welding operation. The scheduling in the body welding operation of a construction equipment manufacturing is to take all the various constraints into consideration. The offset time, due date, daily capacity of operations, daily jig's capacity, precedence relation, outsourcing, alternative resource and all of the shop floor environment should be considered. An APS(Advanced Planning & Scheduling) system is a proper and efficient system in such circumstance. In this paper, we present an APS system, the optimal scheduling system for the construction equipment manufacturing specifically for the body welding operation, using ILOG Solver/Scheduler. ILOG Solver/Scheduler is a general purposed commercial software which supports to find a feasible or optimal solution using object oriented technique and constraints satisfaction programming, given constraints and objectives.

  • PDF

A Study on Robot Hand Gripper Design and Robust Control for Assembly and Disassembly Task of Machine Parts (기계 부품의 조립분해 작업을 위한 로봇핸드 그리퍼 설계 및 견실제어에 관한 연구)

  • Jeong, Gyu-Hyun;Shin, Gi-Su;Noh, Yeon-Guk;Moon, Byeong-Gap;Yoon, Byeong-Seok;Bae, Ho-Young;Kim, Min-Seong;Han, Sung-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.20 no.4
    • /
    • pp.299-305
    • /
    • 2017
  • This study proposes a new technique to design and control of robot hand gripper for assembling and disassembling of a machine parts. The motion equation describing dynamics of the manipulators and object together with geometric constraint is formulated by Lagrange-Euler's equation. And the problems of controlling both the grasping force and the rotation angle of the grasped object under the constraints are analyzed. The effect of geometric constraints and a method of computer simulation for overall system is verified. Finally, it is illustrated that even in case of there exists a sensory feedback from sensing data of the rotational angle of the object to command inputs control of joint and this feedback connection from sensing data to control grasping of machinery parts.