• Title/Summary/Keyword: Artificial ground

Search Result 776, Processing Time 0.028 seconds

Stabilization System for Mobile Antenna Gimbal based on Dynamic Characteristics Analysis (동특성 해석에 기반한 이동용 안테나 김발 안정화 시스템)

  • Lee, Ki-Nam;Lee, Byoung-Ho;Lee, Jeung;Kim, Jie-Eok;Song, Jae-Bok
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.7
    • /
    • pp.851-856
    • /
    • 2013
  • Recently, as the tactical environment has changedto one of network-centric warfare, where all components are connected through a network, much emphasis has been placed on the use of an artificial satellite for achieving high communication speeds. To provide a high-quality artificial satellite link, stabilization is very important in a platform. Previous stabilization control techniques used PI control, which is commonly used for vessels. However, for ground terminals that require a higher communication speed, the antenna should move faster to track an artificial satellite within a short period of time. Moreover, the terminals must be equipped with proper sensors and algorithms so that they can detect and compensate for external disturbances while tracking the artificial satellite. In this study, through the analysis of the dynamic model of an antenna system, a stabilization algorithm for ground terminals was proposed;this algorithm shows high isolation performance in the low-frequency range and includes $PI^2$ control.

Estimation of Spatial Distribution of Soil Moisture at Yongdam Dam Watershed Using Artificial Neural Networks (인공신경망을 이용한 용담댐 유역 공간 토양수분 분포도 산정)

  • Park, Jung-A;Kim, Gwang-Seob
    • Journal of the Korean Geographical Society
    • /
    • v.46 no.3
    • /
    • pp.319-330
    • /
    • 2011
  • In this study, a soil moisture estimation model was proposed using the ground observation data of soil moisture, precipitation, surface temperature, MODIS NDVI and artificial neural networks. The model was calibrated and verified on the Yongdam dam watershed which has reliable ground soil moisture networks. The test statistics of calibration sites, Jucheon, Bugui, Sangjeon, showed that the correlation coefficients between observations and estimations are about 0.9353 and RMSE is about 1.4957%. Also that of the verification site, Cheoncheon2, showed that the correlation coefficient is about 0.8215 and RMSE is about 4.2077%. The soil moisture estimation model was applied to estimate the spatial distribution of soil moisture in the Yongdam dam watershed and results showed improved spatial soil moisture distribution since the model used satellite information of NDVI and artificial neural networks which can represent the nonlinear relationships between data well. The model should be useful to estimate wide range soil moisture information.

The Development of Tunnel Behavior Prediction System Using Artificial Neural Network (인공신경망을 이용한 터널 거동 예측 시스템 개발)

  • 이종구;문홍득;백영식
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.2
    • /
    • pp.267-278
    • /
    • 2003
  • Artificial neural networks are efficient computing techniques that are widely used to solve complex problems in many fields. In this study, in order to predict tunnel-induced ground movements, Tunnel Behavior Prediction System (TBPS) was developed by using these artificial neural networks model, based on a Held instrumentation database (i.e. crown settlement, convergence, axial force of rock bolt, compressive and shear stress of shotcrete, stress of concrete lining etc.) obtained from 193 location data of 31 different tunnel sites where works are completed. The study and test of the network were performed by Back Propagation Algorithm which is known as a systematic technique for studying the multi-layer artificial neural network. The tunnel behaviors predicted by TBPS were compared with monitored data in the tunnel sites and numerical analysis results. This study showed that the values obtained from TBPS were within allowable limits. It is concluded that this system can effectively estimate the tunnel ground movements and can also be used f3r tunneling feasibility study, and basic and detailed design and construction of tunnel.

Studies of application of artificial ground freezing for a subsea tunnel under high water pressure - focused on case histories - (고수압 해저터널 건설을 위한 동결공법 적용성에 관한 연구 - 사례를 중심으로 -)

  • Son, Young-Jin;Lee, Kyu-Won;Ko, Tae Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.5
    • /
    • pp.431-443
    • /
    • 2014
  • In this paper case studies of artificial ground freezing, which have not been applied in Korea, have been investigated for the water cut-off in a subsea tunnel under high water pressure and the most commonly used cooling mediums of brine and liquid nitrogen are examined. Since sea water with pressure has the lower freezing point than pure water, the lower temperature cooling medium is required in the application of subsea tunnel. Also, the cooling medium must have refrigeration safety and is able to reduce executing time. Brine freezing system can reuse cooling medium and is safer than liquid nitrogen freezing. But it takes more time to freeze ground and needs complex circulation plants. On the other hand, liquid nitrogen freezing system can't recycle cooling medium and may cause breathing problems or asphyxiation through oxygen deficiency. But, freezing with liquid nitrogen is fast and requires simple refrigeration equipment. Principal elements of design for ground freezing in subsea tunnel have been extracted and these elements are needed further research.

Change of Green Space Arrangement and Planting Structure of Apartment Complexes in Seoul (서울시 아파트단지의 녹지배치 및 식재구조 변화 연구)

  • Lee, Dong-Wook;Lee, Kyong-Jae;Han, Bong-Ho;Jang, Jae-Hoon;Kim, Jong-Yup
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.4
    • /
    • pp.1-17
    • /
    • 2012
  • This study was carried out to propose the improved method by analyzing the change of green space arrangement and planting structure of apartment complexes in Seoul. 12 survey sites, which have obvious differences, were selected by reflecting the change of floor area ratio, underground parking place, and green space ratio. We divided the survey sites into four types that high green ratio(over 40%) apartment on natural ground, low green ratio(under 40%) apartment on natural ground, low green ratio(under 40%) apartment on artificial ground, and high green ratio(over 40%) apartment on artificial ground each period based on green space ratio and ground structure, plant crown volume, planting density, and planting pattern. The main factors of change of green space arrangement were green space ratio and ground structure. The Green space ratio was changed by the floor area ratio with constructing underground parking place and floor area ratio was adjusted by government policy and economic status. Average width of front green area has been changed from 10.0m in high green ratio apartment on natural ground for 3.5m, 2.7m, and 4.5m each period. The average width of the buffer green area has been changed from 15.0m in high green ratio apartment on natural ground of 7.7m, and 2.7m by extending parking place in the low green ratio apartment of artificial ground, so buffer green areas have been reduced and disconnected. So buffer green area in apartment complexes has been extended that the average width of the buffer green area was 3.8m caused by growing recognition of green since 2001. The ratio of native plant in canopy layer was increased from 45.1 % in the case of the high green ratio apartment of natural ground in 1980~1983 to 55.6%. Average plant crown volume increased from $1.27m^3/m^2$ in high green ratio apartment on natural ground for $3.47m^3/m^2$ in a low green ratio apartment on natural ground. But average plant crown volume is $0.27m^3/m^2$ in the high green ratio apartment of the artificial ground plant density of canopy layer was changed from 5 individuals per $100m^2$ to 14.5 individuals per $100m^2$. We should construct the buffer green area with natural ground and get the function of ecological and beautiful environment regarding to garden concept in case of front green area, width 4.5m. We should get the function of increasing green volume by multi-layer planting with shade woody species and flower woody species in case of back-side green area, width over 5.0m. We should get the function of covering the wall and increasing green landscape by planting with high woody species in case of side green area. We should apply the ecological planting technique to buffer green area and connect buffer green area to inner green area in apartment complexes.

Development of Apparatus for Measuring Hydraulic Resistance of Sea Ground Considering Tidal Current Flow (조류 흐름을 고려한 해양지반 수리저항성능 실험기 개발)

  • Kang, Kyoung-O;Jeong, Hyun-Chel;Kim, Young-Sang
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1366-1369
    • /
    • 2010
  • Along with the increasing need of sea development, the hydraulic stability of seabed structure on a soft seafloor ground is becoming an issue in the course of seaside development recently. However, the movement and hydraulic resistance or hydraulic stability of seafloor ground are mutually coupled with various phenomena, and there has been no clear proof for the issue, which makes it difficult to forecast. Furthermore, most researches are focused on hydraulic variables and the conditions of marine external force, while there have been few researches into the assessment in consideration of the type of a seafloor ground and the geotechnical characteristics. In addition, according to the periodic change of the flow direction, possible changes in hydraulic resistance performance of the seafloor deserves all the recognition. But there is no way to measure the hydraulic unstability of the sea ground due to tidal flow quantitatively. In this study, conventional hydraulic resistance measurement apparatus was improved to consider direction change of the current flow. Various artificial clayey soil specimens were made from Kaolinite and Jumunjin standard sand and hydraulic resistance tests were performed by changing the flow direction to validate the effect of the direction change on the scour of the seafloor.

  • PDF

Performance Simulation of Ground-Coupled Heat Pump(GCHP) System for a Detached House (단독주택 적용 지열 히트펌프 시스템의 성능 분석)

  • Sohn, Byong-Hu;Choi, Jong-Min;Choi, Hang-Seok
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.23 no.6
    • /
    • pp.392-399
    • /
    • 2011
  • Ground-coupled heat pump(GCHP) systems have been shown to be an environmentally-friendly, efficient alternative to traditional cooling and heating systems in both residential and commercial applications. Although some work related to performance evaluation of GCHP systems for commercial buildings has been done, relatively little has been reported on the residential applications. The aim of this study is to evaluate the cooling and heating performances of a vertical GCHP system applied to an artificial detached house($117\;m^2$) in Seoul. For this purpose, a typical design procedure was involved with a combination of design parameters such as building loads, heat pump capacity, borehole diameter, and ground thermal properties, etc. The cooling and heating performance simulation of the system was conducted with different prediction times of 8760 hours and 240 months. The performance characteristics including seasonal system COP, average annual power consumption, and temperature variations related to ground heat exchanger were calculated and compared.

Efficient Management of Tunnel Construction Informations using ITIS(Intelligent Tunnelling Information System) (ITIS를 활용한 효율적인 터널 정보화 시공 관리)

  • Kim, Chang-Yong;Hong, Sung-Wan;Bae, Gyu-Jin;Kim, Kwang-Teom;Son, Moo-Rak;Han, Byeong-Hyeon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.946-951
    • /
    • 2004
  • ITIS is applied to the several tunnel construction sites in Korea. Tunnel construction properties which are acquired from these sites are transferred to information management server(SQL 2000 server)by client application program in real time. Access permission to DB server depends on the user's roles. Some functions which cannot be embodied in SQL Server are serviced through XML and GMS server is used for spatial data based on GIS part. This system is supposed to give engineers the advantages which are not only easy handling of the program and computerized documentation on every information during construction but also analyzing the acquired data in order to predict the structure of ground and rock mass to be excavated later and show the guideline of construction. Neung-Dong tunnel and Mu-Gua express way tunnel are now under construction and with this system they have 3D visualized map of the geology and tunnel geometry and accumulate database of construction information such as tunnel face mapping results, special notes and pictures of construction and 3D monitoring data, all matters on the stability of rock bolts and shotcrete, and so on. Ground settlement prediction program included in ITIS, based on the artificial neural network(ANN) and supported by GIS technology is applying to the subway tunnel. This prediction tool can make it possible to visualize the ground settlement according to the excavation procedures by contouring the calculated result on 3D GIS map and to assess the damage of buildings in the vicinity of construction site caused by ground settlement.

  • PDF

Dynamic Characteristics of the Box Structure in Multi-layered Ground Under Earthquake Load (지진하중을 받는 다층지반내 박스구조물의 동적 특성)

  • Kim, In Dae;Shin, Eun Chul;Park, Jeong Jun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.1
    • /
    • pp.55-63
    • /
    • 2020
  • In this study, a scaled model test of the shaking table and a seismic analysis considering effective stresses were performed to reveal the dynamic behavior characteristics of box structures deep located in multi-layered soils upon seismic loading. The input seismic wave was operated below the ground using five seismic waves, including long period wave (Hachinohe), short period wave (Ofunato), artificial wave and real earthquakes that occurred in Gyeong-ju and Po-hang. As a result of model test and numerical analysis, the vertical displacement of box structures upon seismic loading was greater than that of horizontal direction, and it was confirmed that an increase of excess pore water pressure below the foundation ground caused a displacement. In addition, behavior of the ground and structures during artificial seismic wave appeared to be larger than real earthquake wave.

A Geophysical Study on Site Characteristics of the Western Pagoda of the Mireuksa Site, Iksan, Korea (익산미륵사지 지반특성에 대한 지구물리학적 연구)

  • Je-Ra-
    • Journal of the Korean Geophysical Society
    • /
    • v.4 no.1
    • /
    • pp.1-10
    • /
    • 2001
  • A number of tangible cultural properties have been left to suffering damage without any scientific conservation or maintenance. We conducted nondestructive geophysical explorations around the Western pagoda of the Iksan Mireuksa Temple for the purpose of preparing the counterplan of its conservation and maintenance and of utilizing the geophysical information for the design of repair. Geophysical image of the shallow subsurface around the construct resulting from electric resistivity, seismic refraction, and GPR methods carried out along 6 lines in the site was used to investigate the relationship between the foundation characteristics and the structural safety. Tilting of the pagoda southwest towards seems to result from the low resistivity zones found in the southwestern part. The GPR and seismic surveys revealed a boundary at depth of 3.3~3.5m dividing into two layers, compacted overlaid soil and the original ground. The boundary appears to dip southwest. The artificial layer as a foundation does not covers as much as the bottom area of the pagoda. This top soil dipping southwest seems to result in tilting of foundation southwestward towards. Our geophysical result suggests ground reinforcement in the western part of the survey area for the conservation of the construct.

  • PDF