• Title/Summary/Keyword: Approval Process

Search Result 252, Processing Time 0.031 seconds

A Study on Improvement of Presidential Job Approval in the Poll Survey (대통령 국정수행 지지도 조사의 개선에 대한 연구)

  • Bae, Jong-Chan
    • Survey Research
    • /
    • v.13 no.1
    • /
    • pp.113-134
    • /
    • 2012
  • It is very vital for the presidential preference not only to be a political achievement of the president himself, but also to be an influential base of people-related policy and its implementation. The purpose of this study is to provide the newly developing ideas to compose an appropriate question and to point out the present problems in the utilization of survey results. At first, it turned out to be inappropriate to make a question for evaluation of presidential job approval in the perspective of questionnaire planning. As the respondents were not informed of what the president did, so they were more likely not to know whether the president did well or not. Secondly, the correlation analysis has been made between the evaluation question of the presidential job approval and policy-related questions including the direct one for the presidential preference in the aspect of statistical analysis. Through this process, evaluation of the presidential job approval is not accountable and the direct question for the presidential preference is at best explainable. In conclusion, it seems more persuasive to compare the statistical outcome of the presidential preference which has been derived of to the high rating what the respondents think comprehensively not depending on a subjective decision by mass media.

  • PDF

Analysis on the submittal process for a small local environmental construction company: a case study (지역 소규모 환경건설회사의 제출/승인 절차 분석에 관한 사례 연구)

  • Lee, Do Gyun
    • Journal of Urban Science
    • /
    • v.6 no.2
    • /
    • pp.73-80
    • /
    • 2017
  • A submittal, as a part of three main project management processes: production control, submittals and change orders, is the transmission of information from the subcontractor to the general contractor to the owner, architect, and structural engineer, for review and approval. The purpose of the submittal process is for submittals to be approved in order to start construction. This benefits the contractor by ensuring that the finished project will meet the expectations of the owner. This paper analyzed a case study regarding the submittal process for the local-based environmental construction company, which typically works as a subcontractor and may hire other subcontractors for additional work when applicable. The aim of this study was to roughly evaluate a project management process and understand the submittal process through the study of a case involving the local company.

  • PDF

A Study on Derivation of Railway Software Safety Management Procedure (철도소프트웨어 안전성 관리체계 계시방안 연구)

  • Joung, Eui-Jin;Shin, Kyung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.10d
    • /
    • pp.244-246
    • /
    • 2006
  • Softwares in railway system are being used in the area of railway control system, directly associated to safety. Because the instinct characteristic of Software is uncertainty, Software development without safety insurance is very hazardous situation. In order to derive safety certification process in the railway system, certification and approval processes in the nuclear, aviation, and military area are studied. Software quality should be improved by two aspects : one is product aspect, another is process aspect. GS(Good Software) and ES(Excellent Software) certification can be exemplified in a product aspect approach. In those process certification, CMMI (Capability Maturity Model Integration) or SPICE (Software Process Improvement and Capability dEtermination : ISO/IEC15504) is being used as models for assessing process maturity of organization. Following the studies, safety management procedure in the railway system is suggested.

  • PDF

A Study on Sensitive Information Filtering Requirements for Supporting Original Information Disclosure (원문정보공개 지원을 위한 민감정보 필터링 요건에 관한 연구)

  • Oh, Jin-Kwan;Oh, Seh-La;Choi, Kwang-Hoon;Yim, Jin-Hee
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.17 no.1
    • /
    • pp.51-71
    • /
    • 2017
  • Approximately 10 million electronic approval documents have been released online since the commencement of the original information disclosure service. However, it is practically impossible to carry out an original information disclosure service by confirming a large amount of electronic approval documents to all persons in charge of information disclosure. Recently, some public organizations have been using private information filtering tools to filter personal information at the stage of document production, but the management of different sensitive information has not been managed using solutions. In this study, we set up the advanced direction of the filtering tool by analyzing the filtering tool in use to support the original information disclosure, and redesigned the text of the approval document and the original information disclosure process with the use of the filtering tool.

Issues of IPR Database Construction through Interdisciplinary Research (학제간 연구를 통한 IPR 데이터베이스 구축의 쟁점)

  • Kim, Dong Yong;Park, Young Chul
    • Journal of the Korea Convergence Society
    • /
    • v.8 no.8
    • /
    • pp.59-69
    • /
    • 2017
  • Humanities and social sciences researchers and database experts have teamed up to build a database of IPR materials prepared by the Institute of Pacific Relations (IPR). This paper presents the issues and solutions inherent in the database construction for ensuring the quality of IPR materials. For the accessibility of the database, we maintain the database on the Web so that researchers can access it via web browsers; for the convenience of the database construction, we provide an integrated interface that allows researchers to perform all tasks in it; for the completeness of IPR materials constructed, we support the responsible input and the responsible approval that identify responsibilities of each IPR material entered; and for the immediacy of the approval, we support an interactive approval process facilitating the input of researchers. We also use database design, query processing, transaction management, and search and sorting techniques to ensure the correctness of IPR materials entered. In particular, through concurrency control using existence dependency relationships between records, we ensure the correctness between the operating system files and their paths. Our future studies include content search, database download and upload, and copyright related work on IPR materials.

Perceptions held by Investigators, IRB Members and IRB Administrators on the Bioethical Oversight System of National R&D Projects (국가연구개발과제 생명의학윤리 감독체계에 대한 인식조사 및 제언)

  • Kang, Young Hee;Lee, Sang Mi;Kwon, Kwang Il;Kim, Eun Young;Huh, Woo Sung
    • Korean Journal of Clinical Pharmacy
    • /
    • v.24 no.2
    • /
    • pp.135-143
    • /
    • 2014
  • Purpose: Aim of this study was to gather and evaluate perceptions of investigators, IRB members, and IRB administrators on the appropriateness of IRB review process and bioethical oversight system of national R&D (NR&D) projects. Method: Investigators, IRB members, and IRB administrators at 17 different institutions were surveyed using convenience sampling and survey questionnaires were partially group-specialized to consider any differences between the groups. Results: Participants included 29 investigators, 37 IRB members, and 17 administrators with response rate of 100% (83 of 83). According to the responses obtained, insufficient preparation time for constructing protocol and gaining IRB approval was one of the main problems in the IRB review process (investigator 79.3%, IRB administrator 88.2%). Also, discrepancy between NR&D and IRB's protocol formats was another major issue (IRB members 96.4%, IRB administrator 100%) and most investigators (89.7%) had to modify the original NR&D protocol to obtain IRB approval. Moreover, it was reported that 13.8% of investigators and 31.3% of IRB administrators did not submit midyear reports to IRB and for bioethical issues of NR&D projects, 17.2% of investigators did not include information on project status and safety issues in the annual reports. Conclusion: In conclusion, for successful and ethical completion of R&D projects, revision of both IRB review process and NR&D project protocol formats as well as implementation of appropriate bioethical oversights are necessary.

CSfC Network Security Architecture Analysis for the Assurance of Commercial Security Solutions in Defense Area (국방 상용보안제품 도입을 위한 CSfC(Commercial Solutions for Classified Program) 네트워크 보안 아키텍처 분석)

  • Lee, Yong-joon;Park, Se-joon;Park, Yeon-chool
    • Journal of Internet Computing and Services
    • /
    • v.22 no.6
    • /
    • pp.91-97
    • /
    • 2021
  • The United States is responding to evolving cyberattacks through the Commercial Solutions for Classified Program (CSfC). Authorized safety evaluation and certification are being carried out so that US government agencies can quickly introduce civilian commercial security products into the national pavilion. Commercial security products registered in the CSfC process can be used by defense agencies through a rapid approval process. Defense agencies approve commercial security products without duplicate evaluation. Approved security products can reduce the time, cost, and cost of the approval process required to implement the defense information system. In this study, security control for 4 types of network security architecture MSC (Multi-Site Connectivity), MA (Mobile Access), Campus WLAN, and DAR (Data at Rest) proposed by the US National Security Agency (NSA) for introduction to national defense A detailed analysis was performed on the items.

DESIGN SCOPE AND LEVEL FOR STANDARD DESIGN CERTIFICATION UNDER A TWO STEP LICENSING PROCESS

  • Suh, Nam-Duk;Huh, Chang-Wook
    • Nuclear Engineering and Technology
    • /
    • v.44 no.6
    • /
    • pp.689-696
    • /
    • 2012
  • A small integral reactor SMART (System Integrated Modular Advanced ReacTor), being developed in Korea since late 1990s and targeted to obtaining a standard design approval by the end of 2011, is introduced. The design scope and level for design certification (DC) is well described in the U.S. NRC SECY documents published the early 1990s. However, the documents are valid for a one-step licensing process called a combined operating license (COL) by the U.S. NRC, while Korea still uses a two-step licensing process. Thus, referencing the concept of the SECY documents, we have established the design scope and level for the SMART DC using the contexts of the standard review plan (SRP). Some examples of the results and issues raised during our review are briefly presented in this paper. The same methodology will be applied to other types of reactor under development in Korea, such as future VHTR reactors.

Drift Test Method of Meteorological Instrument for Type Approval (형식승인을 위한 측기의 드리프트 검사 방법)

  • Seo, Dae-Il;Lee, Kyung-Hun;Kwon, Byung-Hyuk
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.17 no.5
    • /
    • pp.927-932
    • /
    • 2022
  • Instrument drift is caused by the passage of time, environmental changes, normal wear and tear, debris buildup, sudden shock, vibrations, electromagnetic fields, and improper use. Since it is inappropriate to directly determine the change of the output value as drift during the limited test period, a new algorithm that reflects both zero drift and span drift by giving changes over time to the calibration method of the instrument was proposed. The temperature drift was calculated to be 0.49% for about 60 minutes at 1-minute intervals in the nine-step constant temperature environment through the warming and cooling process.

A Study on the Construction Plan of Machinery Public Platform through the Survey of the Construction Machinery Rental Market

  • Chang Wook Kim;Myeong Jin Jeong;Hyo Bae Lee;Jong Kwan Ho;Myeong Gu Lee
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.4
    • /
    • pp.311-325
    • /
    • 2023
  • In the construction machinery rental market, there are frequent cases of sublease through large-scale rental companies or rental through mediation organizations without legal grounds. In addition, institutional improvement of the construction machine safety management system has been required due to concerns over the internalization of legal inspections due to the lack of type approval data and construction machine history management during the construction machine inspection process. The government is responsible for securing safety of construction machinery and promoting mechanization of construction machinery by efficiently managing the construction machinery market by setting safety management such as type approval, registration, and inspection of construction machinery. In order to efficiently implement this, it is required to establish a platform for renting construction machinery and collecting safety management information. We presented a plan to build a public platform for construction machinery to secure the soundness of the construction machinery rental market and to improve safety management.