• Title/Summary/Keyword: Apartment remodeling

Search Result 274, Processing Time 0.022 seconds

Stock composition and Renovation Possibility of urban Style Row-rise Houses for rent

  • Park, Byung-Soon;Matsumura, Shuichi
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2002.11a
    • /
    • pp.307-313
    • /
    • 2002
  • Urban style row-rise houses for rent have been supplied to the center of city from the 1950's first half The amount of stock is about 450,000 houses and occupies about 40% in the private rented house. As for the structure, the 60% of them is wooden-structure and the rest is non-wooden. Stocks of 57.5% of the wooden-structure and 86% of the non-wooden were built after 1981 years. It was 1981 years that the new earthquake-resistant standard was carried out, the improvement of stocks built before 1981 is necessary because those don't satisfy the present standard. To investigate the renovation possibility of urban style row-rise houses for rent, actual situation of two-story apartment at 2,4, and 5 Chome Taito-Ku in Tokyo was surveyed from July to November 2001. The number of building analyzed is 227 ridges among 234 ridges of the surveyed two-story building. 90% of building analyzed is wooden structure. 1) The site of 88% building surveyed is close to a road less than 4m width. It becomes the existing non-conformed building in the building construction act. It is impossible to make a renovation such as rebuilding, extension and remodeling because it requires the set back when renovating this type of non-conformed building, 2) The building built before 1981 is almost wooden-structure, and occupies 37% of the building surveyed, and doesn't satisfy the present earthquake-resistant standard. An improvement of them is needed because the decrepitude of building proceeds. 3) 50% of openings and 40% of windows of the building surveyed doesn't use noncombustible materials. Though it becomes the existing non-conformed building, it can satisfy the present standard by replacing openings with noncombustible materials.

  • PDF

Proposed a Checklist for the Classification of Construction Business Model by Utilizing the Price Influence Factors and the Construction Regulation - As Focus on Aged Public Rental Apartment - (가격영향요인과 건설제도를 활용한 건설사업 유형분류 체크리스트 제안 - 노후공공임대주택 중심으로 -)

  • Park, Seongsik;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.132-141
    • /
    • 2019
  • 1990s, Construction market continued to grow in South Korea exceeding 20% of GDP. In 2015, more than 30 years of old multi-family dwellings amounted to 4.93 million and it continues to increase until 2019. In Particular, the share of Public rental Housing accounts for 90.6% of South Korea's Total aging housing. Before checking the feasibility of Construction Project Management such as Renovation and Reconstruction, Checklists were presented through price impact factor analysis and analysis of housing construction system(Regulation). Based on 32 Price Influencing factors and 20 Indicators based on the housing construction system The Construction project management seems appropriate. As a result, the 22 complexes were found to be suitable for remodeling. This study is meaningful enough to be used for Domestic rental Housing construction and Construction project management and to suggest specificity. Future Research is needed to Quantify the checklist.

Automatic Algorithms of Rebar Quantity Take-Off of Green Frame by Composite Precast Concrete Members (합성 PC부재에 의한 그린 프레임의 철근물량 산출 자동화 알고리즘)

  • Lee, Sung-Ho;Kim, Seon-Hyung;Lee, Goon-Jae;Kim, Sun-Kuk;Joo, Jin-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.118-128
    • /
    • 2012
  • As the bearing wall structure, which has been widely applied to domestic apartment buildings since the 1980s, cause many problems during remodeling of buildings, the government encourages constructors to adopt flat plate or rahmen structure through legal incentives. In line with such a trend, the green frame, an eco-friendly rahmen structure that has removed the shortcomings of previous structures, was developed to enhance structural safety, constructability, and eco-friendliness. The construction of green frame can reduce the labor cost and facilitate the composition of iron bars to reduce rebar loss through calculating the quality and establishing the bar bending schedule automatically on the precast concrete member data collected over the design phase. Therefore, the purpose of this study is to develop the algorithm to automate the calculation of iron bar volume for the green frame designed on composite precast concrete members. Automated algorithm to calculate concrete structural design information and design information. Practices through the application site should prove efficacy. The database established by the developed algorithm will automate the establishment of iron bar processing map and bar cutting list and the calculation of optimal composition and order volume to minimize the rebar loss. This will also reduce the expenses on management staff and overall construction cost through the minimization of rebar loss.

Study on the Effectiveness of Preloading Method on Reinforcement of the Pile Foundation by 3D FEM Analysis (3차원 수치해석을 이용한 공동주택 수직증축용 기초 보강 선재하공법 효과 분석)

  • Wang, Cheng-Can;Han, Jin-Tae;Jang, Young-Eun;Ha, Ik-Soo;Kim, Seok-Jung
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.1
    • /
    • pp.47-57
    • /
    • 2018
  • In recent years, vertical extension remodeling of apartment building is considered as one of the efficient ways to broaden and enhance the utilization of existing buildings due to the rapid development of population and decrement of land resources. The reinforcement of foundation is of great importance to bearing the additional load caused by the added floors. However, because of the additional load, the carried load by the existing piles would be in excess of its allowable bearing capacity. In this study, a conceptual construction method called preloading method was presented. The preloading method applies force onto the reinforcing pile before vertical extension construction. The purpose of preloading is to transfer partial load applied on the existing piles to reinforcing piles in order to keep each pile not exceeding the allowable capacity and to mobilize resistance of reinforcing pile by developing relative settlement. The feasibility and effect of preloading method was investigated by using finite numerical method. Two simulation models, foundation reinforcement with preloading and without preloading, were developed through PLAXIS 3D program. Numerical results showed that the presented preloading method is capable of sharing partial carried load of existing pile and develops the mobilization of reinforcing pile's frictional resistance.