• Title/Summary/Keyword: Apartment Construction Sales Systems

Search Result 3, Processing Time 0.015 seconds

A Comparative Analysis of Supplier's Profitability According to the Different Sales Timing in Apartment Housing (공동주택의 분양시기 변화에 따른 공급자의 수익성 비교 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.25-34
    • /
    • 2012
  • It has been five years since the Post-Construction Sale System of Housing was introduced. The purpose of this study is to identify objectives and effects of the Post-Construction Sale System of Housing and analyze change of profitability at different sales time from a supplier's point of view. Apartment buildings construction projects performed in Seoul are used for the case study. The present value of sales revenues, sensitivity and the present value of expected sales prices are analyzed. According to the findings, first, profits made from a Pre-construction sales system was 5.1%~6.2% higher than those from a Post-construction sales system. Among four plans of a Pre-construction sales system (A, B, C and D plan), sales revenue from the A plan, which takes a deposit at the time of starting construction, was the greatest. Second, increase of the rate of discount and decrease of sales revenues are in direct proportion. The bigger rate of discount leads actual reduction of sales revenues. Third, for the present value of sales revenues reflecting change in basic model construction cost, a Pre-construction sales system showed a little higher than that of a Post-construction sales system by approximately 2%. It should be known that this study suggests profitability of Pre-and Post-construction sales system by clearly measuring them in the supplier's point of view and calculates sales revenues, considering change of a sale price following change of sales time.

Demand Forecasts Analysis of Electric Vehicles for Apartment in 2020 (2020년 아파트의 전기자동차 수요예측 분석 연구)

  • Byun, Wan-Hee;Lee, Ki-Hong;Lee, Sang-Hyuk;Kee, Ho-Young
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.11 no.3
    • /
    • pp.81-91
    • /
    • 2012
  • The world has been replacing fast fossil fuels vehicles with electric vehicles(EVs) to cope with climate change. The government set a goal which EVs will be substitute at least 10% of the domestic small vehicles with EVs until 2020, and will try to build electric charging infrastructures in apartments with the revision the law of 'the housing construction standards'. In apartments the EVs charging infrastructure and parking space is, essential to accomplish the goal. But the studies on EVs demand are few. In this study, we predicted that the demand for EVs using time-series analysis of statistical data, survey results for apartments residents in the metropolitan area. As a result, the ratio of the EVs appeared to be 6~21% for the total vehicles in a rental apartments for the years 2020, 21~39% in apartments for sales. For the EVs, the maximum power required for 1,000 households in rental apartment is predicted to be about 4200 kwh on a daily basis, while the maximum power in the apartment for sales is predicted to be 7800kwh.

Development of a Feasibility Evaluation Model for Apartment Remodeling with the Number of Households Increasing at the Preliminary Stage (노후공동주택 세대수증가형 리모델링 사업의 기획단계 사업성평가 모델 개발)

  • Koh, Won-kyung;Yoon, Jong-sik;Yu, Il-han;Shin, Dong-woo;Jung, Dae-woon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.22-33
    • /
    • 2019
  • The government has steadily revised and developed laws and systems for activating remodeling of apartments in response to the problems of aged apartments. However, despite such efforts, remodeling has yet to be activated. For many reasons, this study noted that there were no tools for reasonable profitability judgements and decision making in the preliminary stages of the remodeling project. Thus, the feasibility evaluation model was developed. Generally, the profitability judgements are made after the conceptual design. However, decisions to drive remodeling projects are made at the preliminary stage. So a feasibility evaluation model is required at the preliminary stage. Accordingly, In this study, a feasibility evaluation model was developed for determining preliminary stage profitability. Construction costs, business expenses, financial expenses, and generally sales revenue were calculated using the initial available information and remodeling variables derived through the existing cases. Through this process, we developed an algorithm that can give an overview of the return on investment. In addition, the preliminary stage feasibility evaluation model developed was applied to three cases to verify the applicability of the model. Although applied in three cases, the difference between the model's forecast and actual case values is less than 5%, which is considered highly applicable. If cases are expanded in the future, it will be a useful tool that can be used in actual work. The feasibility evaluation model developed in this study will support decision making by union members, and if the model is applied in different regions, it will be expected to help local governments to understand the size of possible remodeling projects.