• Title/Summary/Keyword: Apartment Construction Project

Search Result 269, Processing Time 0.024 seconds

A Study on the CM Application to the Apartment Reconstruction Project - Focused on the CM Work Scope in the Reconstruction Project - (공동주택 재건축사업의 건설사업관리 적용방안에 관한 연구)

  • Kim Kwan-Whae;Yoo Moung Nam;Seo Jae-Woong;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.251-256
    • /
    • 2001
  • After the late 70's, the apartment housing have been constructed numerously, but the apartment housing has been deteriorated and the maintenance cost has been increasingly upward as time goes by. Because of that, the reconstruction of the apartment housing is widespread in the late 90's. But as the owner, the congregation, is not an expert, there are many problems in the reconstruction projects. Thus, the necessity of the CM in the reconstruction project is getting higher, but the appropriate method for the application of the CM is not established yet. In this study, the CM work scope that is applicable in the reconstruction project is developed through the inquiry and interview to the experts. Especially, The work scope developed in this study is established to be adapted easily in the practical use for each project phase.

  • PDF

A Study on the Changes of the Apartment price in Accordance with Project process of Super high-rise mixed use buildings (초고층 주상복합 건물의 개발사업 단계에 따른 주변지역 아파트가격의 변화에 관한 연구)

  • Kim, Sang Hwan;Choy, Won Cheol;Kim, Ju Hyung;Kim, Jae Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.159-164
    • /
    • 2010
  • High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Analysing Construction Cost Index Fluctuation on Apartment Housing (공동주택 건설공사비지수의 변동추세 분석)

  • Park, Won-Young;Park, Tae-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.226-227
    • /
    • 2019
  • The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.

  • PDF

A COMPOSITE FRAME CONCEPT FOR THE LONG LIFE OF APARTMENT BUILDINGS

  • Sungho Lee;Sunkuk Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.111-116
    • /
    • 2011
  • Consumers demand an increasing variety of requirements for the residential space as the quality of life improves. However, many apartment buildings with the bearing wall structure cannot meet such demands in Korea. A lot of construction resources are squandered and wastes are created as this type of residential buildings is reconstructed. The life of apartment buildings needs to be extended on the basis of easy remodeling of internal space in order to overcome the limits of the bearing wall structure. This research project aims to propose the Rahmen composite frame concept for the long life of apartment buildings. The Rahmen composite frame is expected to have better structural performance, constructability and economic feasibility than the bearing wall structure.

  • PDF

A Planning Model for Apartment Development Project Reflecting Client Requirements (고객 요구사항을 반영한 아파트 개발 사업 기획 모델)

  • Kim Yoo-Shin;Oh Ye-Keun;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.88-96
    • /
    • 2004
  • Recently, client requirements concept is an important issue related to many effects of firms. Especially, if we think that apartment is given a great deal of national construction industry, it is requested that we should try to improve apartment quality with various methods of client requirements survey and reflecting those on apartment project. The technique searching and applying client requirements to apartment project is requested for that and ROQ(Return On Quality) process connected to QFD(Quality Function Deployment) is a technique which is used in manufacturing industry and help to make money by rising client satisfaction with searching clients requirements, and applying this to quality improvement program. In this study apartment quality management development is suggested through using ROQ process. For this customer interview research and FGI(Focus Group Interview) was carried out and clients requirement was analyzed with this. Then quality improvement program applicable to developing a new apartment product was established with specialist monitoring. A new apartment quality management development plan is prosed with this process.

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

Proposal and Evaluation of the Safety Inspection Cost Estimation Model for Multi-building Construction Project (군집시설물 건설공사의 안전점검 대가 산정모델 제안 및 평가)

  • Kim, Jin-Won;Bang, Jong-Dae;Sohn, Jeong-Rak
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.33 no.12
    • /
    • pp.11-18
    • /
    • 2017
  • The safety inspection cost of the construction work was based on commercial facilities classified as a single building. Therefore, it is not possible to fully reflect the characteristics of the multi-building construction project such as apartment houses. Therefore, this study suggests a reasonable estimation model that can fully reflect the characteristics of the multi-building construction project. The safety inspection cost estimation model proposed two models such as construction cost ratio method and cost plus fixed fee method. And these models were simulated by the apartment construction work and compared with the current standard. As a result, the current construction cost ratio method has shown that the safety inspection cost tends to be overestimated as the construction size increases. Therefore, the proposed model has reflected characteristics of the multi-building construction project, so that it can reasonably estimate the safety inspection cost more than the current standard.

An Analysis of the On-site Improvement Area of Residential Environment Improvement Project in Daegu (대구시 주거환경개선사업 현지개량지구의 실태에 관한 연구)

  • Km, Han-Su;Kim, Cheol-Su
    • Journal of the Korean housing association
    • /
    • v.22 no.2
    • /
    • pp.43-51
    • /
    • 2011
  • This study aims to analyze the on-site improvement area of residential environment improvement project based on research results derived from the on-site and questionnaire survey in case of Daegu. The main findings are as follows. First, residents complain about delay of project completion because a long time has been passed after on-site improvement area was designated. Experts and government officials agree that a new method of development is required. Second, future development should discriminate on-site improvement area according to its level of project completion. The area should be classified into project completion areas and on-going area, and new methods, such as redevelopment, apartment-housing construction method, should be allowed. Third, for better management of on-site improvement area, laws and regulations must be ready and government's will for improvement is crucial.

Neural Network Model for Construction Cost Prediction of Apartment Projects in Vietnam

  • Luu, Van Truong;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.139-147
    • /
    • 2009
  • Accurate construction cost estimation in the initial stage of building project plays a key role for project success and for mitigation of disputes. Total construction cost(TCC) estimation of apartment projects in Vietnam has become more important because those projects increasingly rise in quantity with the urbanization and population growth. This paper presents the application of artificial neural networks(ANNs) in estimating TCC of apartment projects. Ninety-one questionnaires were collected to identify input variables. Fourteen data sets of completed apartment projects were obtained and processed for training and generalizing the neural network(NN). MATLAB software was used to train the NN. A program was constructed using Visual C++ in order to apply the neural network to realistic projects. The results suggest that this model is reasonable in predicting TCCs for apartment projects and reinforce the reliability of using neural networks to cost models. Although the proposed model is not validated in a rigorous way, the ANN-based model may be useful for both practitioners and researchers. It facilitates systematic predictions in early phases of construction projects. Practitioners are more proactive in estimating construction costs and making consistent decisions in initial phases of apartment projects. Researchers should benefit from exploring insights into its implementation in the real world. The findings are useful not only to researchers and practitioners in the Vietnam Construction Industry(VCI) but also to participants in other developing countries in South East Asia. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be also useful to participants in Korea.