• Title/Summary/Keyword: Apartment Construction Project

Search Result 269, Processing Time 0.026 seconds

A Study of POE on Apartment with QFD Application (QFD를 적용한 아파트 거주후평가에 관한 연구)

  • 서경화;박영원;심우갑
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.4
    • /
    • pp.161-169
    • /
    • 2001
  • Recently, the quality of residential space is emphasized much more than ever. This is caused by various changes of social environment. Those users, i.e. the occupants, seemed very sensitive to any changes of their environment. Therefore many producers (construction companies) need to be concentrated on the occupant's needs, and try to apply those needs to their design of products(apartments). This study aims to design the POE(Post Occupancy Evaluation) categorization methodology with QFD application. Therefore QFD performed to produce much tailored occupant's needs as a transformation of technically processed value. For this purpose, categories were experimented for a pilot project of POE. As a result, it showed a possibility and need of accuracy and maturity for the design of POE in its categorization.

  • PDF

A Case Study on BIM-enabled Evaluation of Design Alternatives for an Actual Remodeling Project in Korea - Focusing on the Spatial Program Review in Early Phase of Design -

  • Kim, Hyunjung;Lee, Jin-Kook
    • Korean Institute of Interior Design Journal
    • /
    • v.24 no.5
    • /
    • pp.117-127
    • /
    • 2015
  • This paper depicts a case study of the BIM (Building Information Modeling)-enabled evaluation of design alternatives for an actual remodeling project in Yeongwol, Korea. The increase of urban population and income followed by the growth of economy has derived massive supply of grand scale housing project in Korea since 1970s. Consequently, building remodeling became one of the feasible resolutions for renovating such old housings in these days. This paper aims to introduce a technical approach to such remodeling projects based on BIM-enabled applications focusing on quantitative analysis of design alternatives. Among the technical issues of such building remodeling projects, this paper focuses on the BIM-enabled area analysis and comparison between design alternatives to support decision-making even in early phase of remodeling design process. BIM and its variety of applications have broadly influenced the domain of AEC-FM (Architecture, Engineering, Construction, and Facility Management) within the lifecycle of buildings. As one of the applications facilitated by BIM, the automated area calculation and scenario-based comparison between alternatives can play an important role in the early phase of remodeling project. We modeled three design alternatives (buildings) and three housing modules (units) based on the actual case in Yeongwol city, Korea using a BIM design authoring tool. Nine combinatorial BIM models were demonstrated for the BIM-enabled review process described in this paper. To determine the most optimal design scenario among nine alternatives, this paper demonstrates a result of the conducted spatial program review. The main subject includes specific spatial program issues on; 1) the number of unit spaces; and 2) area of individual/grouped and private/shared spaces.

Development of an Automated Gangform Climbing System for Apartment Housing Construction - Structural Stability and Tower Crane Lifting Load Analysis - (공동주택 전용 갱폼 인양 자동화 기술의 개발 - 구조적 안정성 및 타워크레인 양중부하 분석 -)

  • Lee, Jeong-Ho;Yang, Sang-Hoon;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.48-59
    • /
    • 2012
  • Gangform, compared to the traditional forms, is a systemized form which can reduce construction duration and cost by the advantage of using it repeatedly. However, transportation and climbing process of the Gangform is highly dependant on the performance of tower crane. Gangform climbing process takes one day out of six to seven days of a structural work cycle. Tower cranes can not be used in other lifting works when they lift the Gangform during the structural work cycle, causing the delay in the construction project. Numerous efforts and researches have been done in domestic and international industry to solve such limitations of Gangform climbing process. Especially, "A Study on the Development of Automatic Gangform Climbing System for Apartment Housing Construction"has suggested a conceptual model which can climb the Gangform system without a tower crane. In this paper, the technical and economical feasibilities of previously proposed Automatic Gangform climbing system are examined by evaluating its structural stability and lifting load reduction effect.

Analysis the Appropriate Schedule for the Installment Payment Amount and Establishment of the Post sale System and Policy in the Apartment Construction (공동주택 건설사업에서 후분양의 제도 및 정책 수립을 위한 분담금 납부 적정시기 분석)

  • Yoon, Inhwan;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.59-65
    • /
    • 2021
  • Since the 2016 "Housing Act Partial Amendment" and the "2018 Housing Comprehensive Amendment Plan", interest in the pre sale system and post sale system of apartment houses has been on the rise. In order to compare the advantages and disadvantages of the pre sale system and the post sale system of apartment houses, and to establish the basis for the institutional policy of the post sale system, a questionnaire survey method was used for tenants of the apartment house from the public side, and issues of time and cost. The time series analysis method is intended to suggest an appropriate time for payment of contributions. Accordingly, through a review of existing theories and literature, the post sale system of public and private institutions was organized, and through a questionnaire survey, the path to securing pre sale money, product information of the model house, and the degree of awareness of the effect of the post sale system were investigated. For the post sale fund support and payment method, it is necessary to increase the commercial line for existing financiers from the user's point of view, and it is necessary to operate in consideration of the economic power of the pre sale market by region. Both 60% post sale and 80% post sale have a price range of up to KRW 10 million, and the total interest rate is 5.0%, and the annual interest rate is about 2.8% for 60% post sale, and about 2.1% for 80% post sale, which is lower than the current 3.1%. I need an interest rate. The research is a perception survey targeting a total of 5,213 households in a sample of after sale apartments in public institutions. As the actual values are analyzed using a time series on the effects of market supply and demand and market prices, there is a limit to applying them to prospective residents of private apartments. In addition, to respond to first time tenants, a questionnaire survey was conducted on five complexes that have moved in within the last five years.

The Application of CBR for Improving Forecasting Performance of Periodic Expenditures - Focused on Analysis of Expenditure Progress Curves -

  • Yi, June Seong
    • Architectural research
    • /
    • v.8 no.1
    • /
    • pp.77-84
    • /
    • 2006
  • In spite of enormous increase in data generation, its practical usage in the construction sector has not been prevalent enough compared to those of other industries. The author would explore the obstacles against efficient data application in the arena of expenditure forecasting, and suggest a forecasting method by applying Case-based Reasoning (CBR). The newly suggested method in the research, enables project managers to forecast monthly expenditures with less time and effort by retrieving and referring only projects of a similar nature, while filtering out irrelevant cases included in database. Among 99 projects collected, the cost data from 88 projects were processed to establish a new forecasting model. The remaining 10 projects were utilized for the validation of the model. From the comprehensive study, the choice of the numbers of referring projects was investigated in detail. It is concluded that selecting similar projects at 12~19 % out of the whole database will produce a more precise forecasting. The new forecasting model, which suggests the predicted values based on previous projects, is more than just a forecasting methodology; it provides a bridge that enables current data collection techniques to be used within the context of the accumulated information. This will eventually help all the participants in the construction industry to build up the knowledge derived from invaluable experience.

A Sensitivity Analysis for Risk Management of Commercial Buildings (상업건축물의 사업위험관리를 위한 민감도 분석 기법)

  • Kim, Sun-Kuk;Ryu, Sang-Yeon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.123-129
    • /
    • 2009
  • The global financial crisis resulting from sub-prime mortgage crisis in the United States, beginning in 2007, has had dealt a blow to domestic economy. The economic downturn, coupled with a large number of apartments remaining unsold has resulted in contracted investment sentiment of the builders. Thus it's difficult to even implement the business, unless the investment project is thoroughly verified as well as the accurate profitability is granted. Viewing the current situation, forecasting and evaluating the business profitability is more than important today. The study was planned to identify the factors influencing the business success and to evaluate the sensitivity, relative risk of each factor was measured, and the scope of the study was limited to the commercial buildings among other buildings except apartment buildings. Hence, the study was aimed to analyze the factors affecting the business and the sensitivity so as to be able to systematically materialize the risk management of the commercial buildings. The outcome of the study is expected to serve the useful data in analyzing the business profitability and implementing the investment projects as well.

A Study on Estimating Units of Construction & Demolition Debris (건설폐기물의 원단위 산정기준에 관한 연구)

  • Kim, Hyo-Jin;Kim, Chang-Hak;Lee, Choel-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.500-503
    • /
    • 2004
  • In this country, now redevelopment and rebuild is becoming largely because it is improving welfare and life condition with high growth of economy. Also, the scale of construction project is trend to increase to adjust the changing social situation. Accordingly, C&D waste is rising largely because of the increased demolition works in city. The right management of C&D waste is becoming one of very important things, but little research has been conducted to estimate correctly C&D waste. This study suggests standard units of C&D waste which can estimate demolition quantity of apartment. These units can estimate easily and correctly C&D waste in demolition works and also can make it possible to use very important material to carry out policy of national waste management.

  • PDF

Heavy-impact sound insulation performance according to the changes of dry flooring structure in wall structure

  • Cho, Jongwoo;Lee, Hyun-Soo;Park, Moonseo;Lim, Hohwan;Kim, Jagon
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.89-98
    • /
    • 2017
  • The floor heating method generally uses a wet construction method including the installation of resilient material, lightweight foam concrete, heating piping, and finishing mortar. Such a wet construction method not only delays other internal finishing processes during curing period for two mortar pouring process, but also has a disadvantage that it is difficult to replace the floor heating layer when it deteriorated because it is integrated with the frame. Dry floor heating construction method can be a good alternative in that it can solve these defects. Conversely, when it applied to the wall structure that is vulnerable to the interlayer noise compared with the column-beam structure, the question about the heavy-impact sound(HIS) insulation performance is raised. Therefore, conventional dry floor heating method is hard to apply to the wall structure apartments. Therefore, for the purpose to improve the applicability of dry floor heating method in wall structure apartments, this study investigated the change of floor impact sound, especially HIS insulation performance which is one of the required performance for the floor structure. This study tried to examine whether the change of heavy-impact sound pressure level(SPL) shows a tendency at the significant level according to the shape and mass of the floor structure. Through filed experiments on wall structure apartment, this study confirmed that the form of the raised floor shows better HIS insulation performance than the fully-supported form. In addition, it was also confirmed that the HIS insulation performance increases with the mass on the upper part. Moreover, this study found the fact that a mass of about 30 kg/m2 or more should be placed on the upper structure to reduce the heavy-impact SPL according to the bang machine measuring method. Although this study has a limit due to insufficient experiment samples, if the accuracy of this study is increased, it will contribute to the diffusion of dry floor heating by setting the HIS insulation performance target and designing the dry floor heating structure that meets the target.

  • PDF

A Study on Determinants for Apartment Remodeling in Seoul Metropolitan Area (아파트 리모델링을 위한 의사결정 요인에 관한 연구 - 서울 및 경기 수도권을 중심으로 -)

  • Cho, Yongkyung;Lee, Jaewon;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.57-65
    • /
    • 2019
  • If aging apartments are left unimproved through remodeling, the city will be eventually slum. As the government recognizes remodeling as an alternative to reconstruction, the law has been revised mainly to increase the housing area, increase the number of house and allow the vertical extension for making remodeling costs. However, the remodeling is still not activated yet in the market. Therefore, this study analyzes the decision factors of apartment remodeling in Seoul metropolitan area based on Heckman two-stage analysis considering sampling error. Research findings indicate that the decision for remodeling is determined by the characteristics of the household, housing, and time-lapse variables. And also the number of household members, net assets, housing satisfaction, the 11-20, 21-30, and more than 30 years of building are identified as the significant variables as a result of remodeling choice probability analysis. It is noteworthy that the significant variables from then remodeling cost analysis are net assets, area, more than 30 years of building, and unit housing price. It is also notable that the policy, which extend the housing area to cover remodeling cost, are not actually effective to activate the remodeling, and the age in the case of elderly people in Seoul and Gyeonggi-do who are expected to have high net assets and income is not significant variables. This study is expected to provide more objective and reliable implication to the policy makers, the home owner and the investors on the decision making process related to the remodeling project.

A Study on Practical Application of "Special Building Zone" for Improvement of Landscape of Housing Complex - Focused on the Redevelopments Project of Sinbanpo Apartment Complex - (공동주택 경관향상을 위한 특별건축구역제도 적용실태 분석에 관한 연구 - 신반포1차아파트 주택재건축 정비사업을 대상으로 -)

  • Lee, Bo-Ram;Lee, Su-Hyoung;Lee, Jung-Hyung
    • Journal of the Korean housing association
    • /
    • v.28 no.3
    • /
    • pp.45-54
    • /
    • 2017
  • A Special Building Zone, which could relieve or ignore part of the Building Act and the regulations in relevant laws, was practically established for the creation of new urban landscape, the improvement of construction technology, and the improvement of construction-related policy. However, due to the lack of understanding the Special Building Zone as well as the insufficiency of detailed standards in policies, the system currently cannot be operated in universal matters. In such circumstance, this study, which is based on the current data on the Special Building Zone defined in exiting law, attempts to analyze the multi-unit housing that has been planned by the system of Special Building Zone. Also, this study aims to derive the Special Building Zone's possibilities and implications that contribute to the improvement of landscape, so as to suggest solutions for effective improvement of the system. With the results above, solutions for the improvement of the system can be derived and summarized as the following. On the one hand, from 'planning perspective', it is necessary to improve the system in a comprehensive way with consideration of urban and local contexts. On the other hand, from 'procedure perspective', some foundation shall be prepared for a system that can allows comprehensive tasks, including the settlement of the zone, the alleviation/elimination of regulations, the approval of building's construction, the process of construction, and the monitoring.