70년대 이후 급속히 건설된 공동주택은 시간이 경과함에 따라 구조체와 시설이 노후화 되면서 유지관리 비용이 상승하였고 또한 경제성장에 따른 생활수준의 향상으로 인해 주거공간으로의 기능을 상실하게 되었다. 이러한 이유로 인해 공동주택 재건축 수요가 창출되었고 90년대를 기점으로 활성화되었다. 그러나, 사업시행주체인 조합임원의 대부분이 비전문인이기 때문에 사업시행에 않은 문제점들이 발생하게 되었다. 본 연구에서는 이러한 문제점들을 해결하기 위한 방안으로 재건축조합의 전반적인 업무를 대행하고, 공정하고 투명한 절차에. 의해 사업을 추진할 수 있도록 공동주택 재건축사업에 대한 CM의 적용방안을 모색하고자 하며, 특히 재건축사업 추진단계별 CM업무를 제시하고자 한다. 또한 향후 재건축사업의 CM적용시 현실적으로 활용 가능한 업무를 중심으로 제안하여 조합과 CM회사에서 이를 활용할 수 있도록 하였다.
High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.
Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.
The basic type construction cost which is the base of the building cost estimation is being adjusted according to the price changes by utilizing the apartment construction cost index in order to flexibly operate it. In this study, we analyzed the change trends and characteristics of the housing cost index for the basic type building cost model project operated from September, 2012 to March, 2018. As a result, the increase in material costs is slight while the share of the labor cost increased in the construction cost due to the rise of labor unit price, leading to a perceived increase in sensitivity of labor costs. We should be careful to keep the sensitivity of the material cost and the labor cost to an appropriate level so that the index may not be distorted.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.111-116
/
2011
Consumers demand an increasing variety of requirements for the residential space as the quality of life improves. However, many apartment buildings with the bearing wall structure cannot meet such demands in Korea. A lot of construction resources are squandered and wastes are created as this type of residential buildings is reconstructed. The life of apartment buildings needs to be extended on the basis of easy remodeling of internal space in order to overcome the limits of the bearing wall structure. This research project aims to propose the Rahmen composite frame concept for the long life of apartment buildings. The Rahmen composite frame is expected to have better structural performance, constructability and economic feasibility than the bearing wall structure.
고객 요구사항은 기업의 여러 성과와 관련하여 최근 이에 대한 관심이 증가되고 있는 개념이며, 특히 국내 건설업에서 큰 비중을 차지하는 아파트 사업의 경우 다각도의 조사를 통해 고객의 요구사항을 발굴하고 이를 사업에 반영하여 품질을 향상시키는 노력이 필요하다. 이를 위해서는 고객의 요구사항을 파악하고 아파트 사업에 적용하는 기법이 요구되며 QFD(Quality Function Deployment)와 연계된 ROQ(Return On Qualify)는 제조업에서 사용되는 기법으로 고객의 요구사항을 조사하여 고객만족을 향상시키고 이를 품질개선 프로그램에 적용해 수익성을 향상시키게 하는 프로세스이다. 본 연구에서는 ROQ 프로세스의 적용을 통해 아파트 품질관리 개선방안을 제시하였다. 이를 위해 먼저 소비자 면접조사와 FGI(포커스그룹 인터뷰) 조사 실시 및 고객의 요구사항을 분석하였으며, 그 후 전문가의 면담을 통해 새로운 아파트 상품 개발에 적용 가능한 품질개선 프로그램을 수립하였다. 이 프로세스를 통해 새로운 아파트 품질관리 개선방안을 제시하도록 한다.
The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.
The safety inspection cost of the construction work was based on commercial facilities classified as a single building. Therefore, it is not possible to fully reflect the characteristics of the multi-building construction project such as apartment houses. Therefore, this study suggests a reasonable estimation model that can fully reflect the characteristics of the multi-building construction project. The safety inspection cost estimation model proposed two models such as construction cost ratio method and cost plus fixed fee method. And these models were simulated by the apartment construction work and compared with the current standard. As a result, the current construction cost ratio method has shown that the safety inspection cost tends to be overestimated as the construction size increases. Therefore, the proposed model has reflected characteristics of the multi-building construction project, so that it can reasonably estimate the safety inspection cost more than the current standard.
This study aims to analyze the on-site improvement area of residential environment improvement project based on research results derived from the on-site and questionnaire survey in case of Daegu. The main findings are as follows. First, residents complain about delay of project completion because a long time has been passed after on-site improvement area was designated. Experts and government officials agree that a new method of development is required. Second, future development should discriminate on-site improvement area according to its level of project completion. The area should be classified into project completion areas and on-going area, and new methods, such as redevelopment, apartment-housing construction method, should be allowed. Third, for better management of on-site improvement area, laws and regulations must be ready and government's will for improvement is crucial.
Accurate construction cost estimation in the initial stage of building project plays a key role for project success and for mitigation of disputes. Total construction cost(TCC) estimation of apartment projects in Vietnam has become more important because those projects increasingly rise in quantity with the urbanization and population growth. This paper presents the application of artificial neural networks(ANNs) in estimating TCC of apartment projects. Ninety-one questionnaires were collected to identify input variables. Fourteen data sets of completed apartment projects were obtained and processed for training and generalizing the neural network(NN). MATLAB software was used to train the NN. A program was constructed using Visual C++ in order to apply the neural network to realistic projects. The results suggest that this model is reasonable in predicting TCCs for apartment projects and reinforce the reliability of using neural networks to cost models. Although the proposed model is not validated in a rigorous way, the ANN-based model may be useful for both practitioners and researchers. It facilitates systematic predictions in early phases of construction projects. Practitioners are more proactive in estimating construction costs and making consistent decisions in initial phases of apartment projects. Researchers should benefit from exploring insights into its implementation in the real world. The findings are useful not only to researchers and practitioners in the Vietnam Construction Industry(VCI) but also to participants in other developing countries in South East Asia. Since Korea has emerged as the first largest foreign investor in Vietnam, the results of this study may be also useful to participants in Korea.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.