• Title/Summary/Keyword: Ancillary service

Search Result 61, Processing Time 0.028 seconds

Review of Virtual Power Plant Applications for Power System Management and Vehicle-to-Grid Market Development (전력시스템 관리 및 Vehicle to Grid 전력시장 개발을 위한 가상발전소의 활용방안)

  • Jin, Tae-Hwan;Park, Herie;Chung, Mo;Shin, Ki-Yeol;Foley, Aoife;Cipcigan, Liana
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.12
    • /
    • pp.2251-2261
    • /
    • 2016
  • The use of renewable energy sources and energy storage systems is increasing due to new policies in the energy industries. However, the increase in distributed generation hinders the reliability of power systems. In order to stabilize power systems, a virtual power plant has been proposed as a novel power grid management system. The virtual power plant plays includes different distributed energy resources and energy storage systems. We define a core virtual power plant technology related to demand response and ancillary service for the cases of Korea, America, and Europe. We also suggest applications of the proposed virtual power plant to the vehicle-to-grid market for restructuring national power industries in Korea.

Limitations and Improvement of Using a Costliness Index (진료비 고가도 지표의 한계와 개선 방향)

  • Jang, Ho Yeon;Kang, Min Seok;Jeong, Seo Hyun;Lee, Sang Ah;Kang, Gil Won
    • Health Policy and Management
    • /
    • v.32 no.2
    • /
    • pp.154-163
    • /
    • 2022
  • Background: The costliness index (CI) is an index that is used in various ways to improve the quality of medical care and the management of appropriate treatment in medical institutions. However, the current calculation method for CI has a limitation in reflecting the actual medical cost of the patient unit because the outpatient and inpatient costs are evaluated separately. It is desirable to calculate the CI by integrating the medical cost into the episode unit. Methods: We developed an episode-based CI method using the episode classification system of the Centers for Medicare and Medicaid Services to the National Inpatient Sample data in Korea, which can integrate the admission and ambulatory care cost to episode unit. Additionally, we compared our new method with the previous method. Results: In some episodes, the correlation between previous and episode-based CI was low, and the proportion of outpatient treatment costs in total cost and readmission rates are high. As a result of regression analysis, it is possible that the level of total medical costs of the patient unit in low volume medical institute and rural area has been underestimated. Conclusion: High proportion of outpatient treatment cost in total medical cost means that some medical institutions may have provided medical services in the ambulatory care that are ancillary to inpatient treatment. In addition, a high readmission rate indicates insufficient treatment service for inpatients, which means that previous CI may not accurately reflect actual patient-based treatment costs. Therefore, an integrated patient-unit classification system which can be used as a more effective CI indicator is needed.

Evaluation of Effect of Low Opening Operation on Increasing Wear of Bearing Bushings of Guide Vanes used in Hydropower Plants (수력발전소 가이드 베인 저개도율 운전에 따른 가이드 베인 베어링 부슁의 마모 가속효과 평가)

  • Kim, Jong-Sung;Kim, Se-Na
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.10
    • /
    • pp.1267-1274
    • /
    • 2012
  • A guide vane plays a key role in controlling the flow rate of water supplied to the turbine of a hydropower plant. It has been reported that guide vane bearing bushings are subjected to considerable wear, which requires them to be maintained. An ancillary service such as frequency control and black start causes cyclic low opening operation of the guide vanes. It is empirically well known that such operation increases the wear rate of the guide vane bearing bushing. In this study, the effect of low opening operation on the increasing wear of the guide vane bearing bushing is quantitatively assessed via finite element flow analysis, finite element stress analysis, and relative wear evaluation. As a result of the assessment, it is identified that the pressure applied on the guide vane surface increases and the contact length between the outer surface of the guide vane stem and the inner surface of the bearing bushing decreases with a decrease in the opening of the guide vane. In addition, low opening of the guide vanes results in an increase in the relative wear owing to the generation of high contact pressure on the bearing bushing surfaces.

Speech Recognition based Message Transmission System for the Hearing Impaired Persons (청각장애인을 위한 음성인식 기반 메시지 전송 시스템)

  • Kim, Sung-jin;Cho, Kyoung-woo;Oh, Chang-heon
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.22 no.12
    • /
    • pp.1604-1610
    • /
    • 2018
  • The speech recognition service is used as an ancillary means of communication by converting and visualizing the speaker's voice into text to the hearing impaired persons. However, in open environments such as classrooms and conference rooms it is difficult to provide speech recognition service to many hearing impaired persons. For this, a method is needed to efficiently provide it according to the surrounding environment. In this paper, we propose a system that recognizes the speaker's voice and transmits the converted text to many hearing impaired persons as messages. The proposed system uses the MQTT protocol to deliver messages to many users at the same time. The end-to-end delay was measured to confirm the service delay of the proposed system according to the QoS level setting of the MQTT protocol. As a result of the measurement, the delay between the most reliable Qos level 2 and 0 is 111ms, confirming that it does not have a great influence on conversation recognition.

The Modernization of Automatic Control facilities of Hydro Power Plant (수력발전소 자동제어설비의 현대화)

  • Kwon, O-Geuk;Kwon, Young-June;Song, Young-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.69-70
    • /
    • 2008
  • Automatic control systems(AVR, Governor, Synchronizer) installed $1970{\sim}1980$ in K-water were considered to be rehabilitated around 2000. Moreover, Korea Power Exchange market system was changed from PPA (Power Purchase Agreement) to a bidding system. Therefore, depending on the power quality, the power provider could achieve additional profits. It is the excitation system and governor that have the functions of enhancing power necessities. During the 20 to 30 years of generator operation, there were many major and minor problems. Examples are SCR burnout (Andong: Excitation system), hunting (Imha: governor), field circuit breaker failure (Chungju 1st: excitation system), the rise of leakage current (Chungju 2nd: excitation system), power supply burnout (Chungju 2nd: governor). These are the typical examples of malfunction which hindered the generator operation and, consequently, diminished the profit of power business. In order to satisfy the needs of the power market and prevent malfunctions mentioned above, the rehabilitation of AVRs and governors were executed. A new system was made to have the flexibility of ancillary service (GF, AGC, etc.), PSS function. With user friendly HMI software, it is more convenient for the operator to fulfill suitable maintenance. It was possible to connect SCADA system by opening protocol of AVR, governor for the efficiency of operation and maintenance.

  • PDF

Public Sector Reform and Industrial Relations: the case of Britain (공공부문 개혁과 노사관계: 영국의 최근 사례)

  • Park, Duck Jay
    • Journal of Labour Economics
    • /
    • v.25 no.2
    • /
    • pp.79-107
    • /
    • 2002
  • Britain's public services, especially health service and secondary education are in disarray. The current British government adopted the public-private partnership(PPP) as a major device to bring about public sector reform. In principle, PPPs could be used to outsource all sorts of public services, helping to raise standards by extending choice and competition. Up to now, however, they have been focused mainly on a relatively limited range of ancillary services related to new buildings and their subsequent operation. The unions, especially the unions covering the public sector employees are antagonistic to the PPPs. The unions have been opposing privatizing or resecting of any part of the public services, as these apt to lead insecurity of employment and degradation of working conditions of their members. Most of the union leaders consider that PPPs are 'privatization by stealth'. Even in Britain, which has a long history of trade union movements, to persuade the unions to co-operate to the reform policy has been extremely difficult. To succeed in public sector reform, the government, be it Korean or British, needs strong leadership, consistency in policies between various departments, and persuasive ability to overcome the opposition from the vested-interest group.

  • PDF

Feasibility Study for Application of Frequency Regulation ESS in Cuba: Technological Effects on Improving Frequency Compensation (쿠바 주파수조정 ESS 운영 전략 검토: 주파수 보상 효과 분석)

  • Kim, Soo-Yeol;Lee, Seong-eun;Kim, Jin-tae
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.2
    • /
    • pp.123-127
    • /
    • 2020
  • KEPCO has installed Frequency Regulation ESS (FR ESS) of 376 MW since 2015. Frequency Regulation is ancillary service to support stabilizing system frequency, which is divided into governor free and automatic generation control. KEPCO operates FR ESS as governor free application and leads FR ESS market with capability of diverse demonstration and operation experiences. To expand FR ESS role during transient states of power system, KEPCO has extended operating time of charging and discharging. KEPCO has also changed speed droop lower than before to improve contribution on frequency compensation, and acquired much experiences of differentiating bad cells from others. Based on these technologies and know-hows, KEPCO Research Institutes received request of feasibility study and technical cooperation for overseas FR ESS business. This paper suggests the simple and practical method for making technological feasibility study of FR ESS.

Improvement in Active Power Control Methods for a Wind Farm Based on Modified Wind Turbine Control in Danish Grid Codes

  • Sim, JunBo;Song, Il-Keun;Lee, Yongseung;Lee, Hak-Ju;Choi, Yun-Hyuk
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.4
    • /
    • pp.1438-1449
    • /
    • 2018
  • The importance of power system stability has been emphasized with an increase of wind energy penetration in the power system. Accordingly, the guarantee on various control capabilities, including active and reactive power control of wind farms, was regarded as the most important aspect for the connection to the grid. To control the wind farm active power, the wind farm controller was introduced. The wind farm controller decides the power set points for each wind turbine generating unit and each wind turbine generating unit controls its power according to the set points from the wind farm controller. Therefore, co-relationship between wind farm controller and wind turbine controllers are significantly important. This paper proposes some control methods of wind farm active power control based on modified wind turbine control for power system stability and structures to connect wind turbine controllers to wind farm controller. Besides, this paper contributes to development of control algorithm considering not only electrical components but also mechanical components. The proposed contributions were verified by full simulation including power electronics and turbulent wind speed. The scenario refers to the active power control regulations of the Eltra and Elkraft system in Denmark.

Operation Planning of Reserve in Microgrid Considering Market Participation and Energy Storage System

  • Lee, Si Young;Jin, Young Gyu;Kim, Sun Kyo;Yoon, Yong Tae
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.3
    • /
    • pp.1089-1095
    • /
    • 2014
  • Innumerable microgrids would be operated independently by individual operators in a future smart grid. This kind of decentralized power system requires entirely different operation scheme in the actual power system and electricity market operation. Especially, frequency regulation is very important for successive energy trade in this multi-microgrid circumstance. This paper presents an optimal energy and reserve market participation strategy and operation strategy of energy storage system (ESS) by a microgrid operator (MGO). For definite evaluation of the proposed strategy, we postulate that the MGO should participate in the Power Exchange for Frequency Control (PXFC) market, which was devised by Maria Ilic and her coworkers and is suitable to the decentralized operation circumstances. In particular, optimal reserve capacity of the frequency control market and optimal market participation ratio of ESS between frequency control market and energy market are derived theoretically and evaluated by simulations utilizing Nordic Pool Elspot price data.

Allocation of Real Power losses to Individual Loads Under Competition of Deregulated Power Industries (전력산업의 경쟁체제에서 유효전력 손실을 부하에 배분하는 방법)

  • Ro, Kyoung-soo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.6
    • /
    • pp.114-120
    • /
    • 2004
  • The paper proposes a method calculate the allocations of real power losses in transmission lines to individual loads based on loss distribution factors and compares them with those using marginal loss factors. The proposed method is implemented by defining loss distribution factors and analysing the individual loads' shares in the transmission line losses. Computer simulations on a 9-bus sample system verify effectiveness of the algorithm proposed and give an assertion that it is desirable to allocate power losses to loads using loss distribution factors rather than based on marginal loss factors.