Magazine of the Korean Society of Agricultural Engineers
/
v.41
no.3
/
pp.51-58
/
1999
It is necessary to evaluate the location suitability of protected horticulutre facilities to guide and/or plan new protected horticulture facilities in rural areas. In this study, as one of methodological approaches for objective and systematic evaluation of location suitability for protected horiculture, the evaluation model of location sutitability for protected horticulture was formulated using AHP (Analytic Hierarchy Process) as a base technique. The evaluation model was made in three different selected regions ; suburban, plain, and mountainous, The results showed that there were significant differences in evaluation model of location suitability for protected horticulture among three regions.
The purpose of this research is to propose policy of domestic timber supply expansion. To recommend polices and draw the priority orders, this study has used Delphi technique and Analytic Hierarchy Process. It has executed to recommend policies of domestic timber supply expand by dividing produce, distribution and consumption parts. As the result of Delphi technique and AHP, 'Infrastructure for domestic timber produce (.239)', 'regional domestic timber gathering complex construction (.202)' and 'a public institution domestic timber use obligation (.126)' policies are derived.
The explosive increase in demand for drones poses a major threat to the safety of existing aircraft operations and important national facilities operating in low-altitude airspace. In order to determine the type and degree of safety threats for low-altitude airspace drones, the types and types of threats from drones are evaluated through analysis of AHP(analysis hierarchy process) for aviation workers in each field. The composition of the threat factor hierarchy from drones was designed using a specific operation risk assessment (SORA) technique previously studied by the European Aviation Safety Agency (EASA), an advanced aviation country. Based on this, it will be possible to secure the low-altitude safety operation of existing aircraft by identifying and removing prior hazards between each aircraft operation and mission performance.
International Journal of Advanced Culture Technology
/
v.8
no.1
/
pp.173-181
/
2020
This study examines whether unmanned aircraft systems (UAS) operated in the context of UAS traffic management (UTM) can be properly operated in its flight environment. In detail, this study examines the influencing navigation factors affecting UASs during flight and examines factors affecting the navigation of UASs under UTM. After deriving various factors affecting navigation, their importance are determined by applying the analytic hierarchy process technique, and the important influencing factors are examined. For low-altitude UAS navigation, errors are classified into navigation-system and flight-technical errors, and a hierarchy is constructed for their sub-factors affecting the influencers. Through this, influencing factors for precise navigation of low-altitude UAS are analyzed, and high importance items are identified.
Koo, Jakon;Kim, Sang-Ho;Yoon, Ko-San;Kang, Hyun-Jae;Jeong, Jong Chul
Journal of Environmental Impact Assessment
/
v.21
no.3
/
pp.381-389
/
2012
This study was conducted to analyze the weight factors for siting the electric facilities using Analytic Heirarchy Process technique participating the stakeholders. Siting the electric facilities has been a dispute of long standing because of landscape damage, geological deformation and various environmental problems such as electromagnetic effect to human health. For analyzing the weight factors by AHP technique, the questionnaire process was applied to the fifteen committee members including representatives of resident, academic experts, members of local assembly, officers of local government, journalists, etc. in Gangwondo, Korea. Weight factors for siting the electric facilities by AHP committee members resulted in residential areas 35.06%, cultural assets 16.68%, landscape conservation 13.11%, large-scale ecological corridor 10.17%, connectability of electric transmission line 8.32% respectively. The distance from residential areas was the most important factor preferred by committee members for siting the electric facilities.
This study aims to suggest how the port specialists think the priority of port development in Korea To illustrate the ideas regarding a port development, 87 detailed attributes were identified both from the previous studies and from brainstorming on port professionals. And these were grouped into 6 criteria by 'KJ method' and made into 4 levels hierarchy structure. AHP technique identifies the relative weights of each levels, trends of the preference of port specialists and the composite relative weights of alternatives. As a result, a port development priority in Korea has been proposed.
Journal of the Korea Institute of Building Construction
/
v.8
no.6
/
pp.75-82
/
2008
The purpose of this study is to present the rational decision process for new ward office building site. AHP Technique used in this study considers both quantitative and qualitative factors on the basis of decision maker's intuitive, reasonable or unreasonable judgement by giving weight through mutual comparision of publicity factors. The evaluaion factors were refer to another five ward office there were executed these kinds of new site selection before. These standards are composed of 6 middle groups and classified into 9 detailed standards. Alternative building sites are five places in this district. The final evauation standards are Accessibility, Urban Expansion Possibility. Distrct balance, Environment, Financing. Development easiness. And It became clear that the priority of evaluation is Financing > Urban expansion > Accessibility > Development easiness > District balance > Environment. In conclusion, it was determined that alternative " E " is the most adequate place for new ward office building.
Purpose: The purpose of this study is to analyze the current status and investigate relevant indicators so that R&D performance evaluation suitable for government-funded research institutes can proceed. A suitable performance evaluation model was presented based on the surveyed indicators. Based on the presented performance evaluation model, the importance was analyzed to calculate the weight for each indicator of the performance evaluation model. Methods: The method applied in this study presented a performance evaluation model based on the organizational performance evaluation cases of advanced overseas countries. By using the AHP(Analytic Hierarchy Process) technique, the weight of each indicator of the performance evaluation model was studied. Results: As a result of examining the indicators necessary for the evaluation model, focusing on overseas cases, 13 evaluation items were derived. A weight was calculated for the importance of the study results. And the scientific/technical research results showed the highest excellence. Conclusion: Key indicators of performance evaluation suitable for government-funded research institutes were derived and presented through detailed modeling in three stages. A realistic model that can objectively evaluate the performance of government-funded research institutes was proposed using the AHP technique.
Cases and studies on the selection method of CTQ are relatively active, but there are few cases or studies on the selection method of CTP which is important in the device industry. In fact, many companies simply select and manage CTP from the point of contact based on their experience and intuition. The purpose of this study is to present an evaluation model and a mathematical decision model for rational and systematic CTP selection to improve the process quality of semiconductor equipment lines. In the evaluation model, AHP (Analytic Hierarchy Process) analysis technique was applied to show objective and quantitative figures, and Fuzzy decision-making model was used to solve the ambiguity and uncertainty in the decision-making process. Decision Value (DV) was presented. The subjects were 22 process factors managed in the Plating Process that the representative equipment line can do. As a result, the evaluation model proposed in this study can support more efficient and effective decision-making for process quality improvement by more objectively measuring the problem of subjective CTP selection in manufacturing sites.
In this study, an evaluation system that can be used to evaluate the feasibility of developing and supplying hydrothermal energy for the operation of large-scale complex facilities was developed. To this end, this study derived factors to be considered when selecting a location for the use of hydrothermal energy using raw water from multi-purpose dams and regional water supply systems through literature survey and expert interviews. The evaluation indicators derived from this study are divided into four sectors: hydrothermal energy utilization factors, location factors, planning factors, and disaster safety factors, and are composed of 10 mid-level indicators and 34 detailed planning indicators. The relative importance of all factors was derived using the Analytic Hierarchy Process (AHP) technique, and the developed evaluation indicators and relative importance were applied to four multi-purpose dam regions in the country. As a result, it was found that in the development and use of hydrothermal energy utilizing regional raw water supply line the urban planning conditions of the supply site can have a greater impact on the location selection results than the hydrothermal energy development itself. Due to the characteristics of the evaluation indicators developed in this study and their nature as comprehensive indicators, it is believed that the results should be applied to determine the overall adequacy of site selection in the early stages of hydrothermal energy development. In the future, it is believed that it will be necessary to analyze the problems in supplying and operating hydrothermal energy using raw water from multi-purpose dams and regional water resources. Based on the analysis the evaluation system developed in this study is expected to be improved and supplemented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.