• Title/Summary/Keyword: Analysis Time

Search Result 48,568, Processing Time 0.064 seconds

Dynamic Analysis of a Gear Driving System with Time-varying Mesh Stiffness/Damping and Friction (변동물림강성/감쇠와 마찰을 고려한 기어구동계의 동특성 해석)

  • Kim, Woo-Hyung;Jung, Tae-Il;Chung, Jin-Tai
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.224-231
    • /
    • 2006
  • A six-degree-of-freedom dynamic model with time-varying mesh stiffness/damping and friction has been developed for the dynamic analysis of a gear driving system. This model includes a spur gear pair, bearing, friction and prime mover. Using Newton???s method, equations of motion for the gear driving system were derived. Two computer programs are developed to calculate mesh stiffness, transmission error and friction force and analyze the dynamics of the modeled system using a time integration method. The influences of mesh stiffness/damping, bearing, and friction affecting the system were investigated by performing eigenvalue analysis and time response analysis. It is found that the reduction of the maximum peak magnitude by friction is decided according to designing the positions of pitch point and maximum peak in the responses.

  • PDF

A Study on the Algorithm for Nonlinear Dynamic Response Analysis of Shell Structure (쉘 구조물의 비선형 동적응답 해석을 위한 Algorithm에 관한 연구)

  • 최찬문
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.32 no.2
    • /
    • pp.164-176
    • /
    • 1996
  • The main intention of this paper is to develop and compare the algorithm based on finite element procedures for nonlinear transient dynamic analysis which has combined effects of material and geometric nonlinearities. Incremental equilibrium equations based on the principle of virtual work are derived by the finite element approach. For the elasto - plastic large deformation analysis of shells and the determination of the displacement-time configuration under time-varying loads, the explicit, implicit and combined explicit-implicit time integration algorithm is adopted. In the time structure is selected and the results are compared with each others. Isoparametric 8-noded quadrilateral curved elements are used for shell structure in the analysis and for geometrically nonlinear elastic behaviour, a total Lagrangian coordinate system was adopted. On the other hands, material nonlinearity is based on elasto-plastic models with Von-Mises yield criteria. Thus, the combined explicit-implicit time integration algorithm is benefit in general case of shell structure, which is the result of this paper.

  • PDF

Real-time Dangerous Driving Behavior Analysis Utilizing the Digital Tachograph and Smartphone

  • Kang, Joon-Gyu;Kim, Yoo-Won;Jun, Moon-Seog
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.12
    • /
    • pp.37-44
    • /
    • 2015
  • In this paper, we propose the assistance method to enable safe driving through analysis of dangerous driving behavior using real-time alarm by vehicle speed, azimuth data and smartphone. For this method, smartphone is receiving driving data from digital tachograph using communication. Safe driving habit is a very important issue to commercial vehicle because that driver's long time driving than other vehicle type driver. Existing methods are very inefficient to improve immediately dangerous driving habits during driving because proceed driving behavior analysis after the vehicle operation. We propose the new safe driving assistance method that can prevent traffic accidents by real-time and improve the driver's wrong driving habits through real-time dangerous driving behavior analysis and notification the result to the driver. We have confirmed that the method in this paper will help to improve driving habits and can be applied through the proposed method implementation and simulation experiment.

Impact of Maintenance Time of Anti-Ship Missile Harpoon on Operational Availability with Field Data (야전데이터 기반 하푼 유도탄 정비 소요시간이 가동률에 미치는 영향 연구)

  • Choi, Youngjae;Ma, Jungmok
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.23 no.4
    • /
    • pp.426-434
    • /
    • 2020
  • This paper studies the impact of the maintenance time of anti-ship missile Harpoon on operational availability with real field data. The Harpoon maintenance simulation model is developed as a testbed for identifying the optimal inventory levels on operational availability. Using multiple linear regression analysis and integer programming, the optimal inventory levels of essential assemblies are suggested. Finally, the result of sensitivity analysis shows the quantitative impact of maintenance time on operational availability and inventory costs. The authors believe that this quantitative analysis can support policy decisions to decrease maintenance time of missiles.

A Schedulability analysis and Recovery Technique of Real-Time System using TCPN (TCPN을 이용한 실시간 시스템의 스케쥴가능성 분석 및 회복기법)

  • Kim, Chun-Bae;Park, Heung-Bok
    • The Transactions of the Korea Information Processing Society
    • /
    • v.6 no.10
    • /
    • pp.2797-2808
    • /
    • 1999
  • Timing Constraint Petri Nets(TCPN) extend petri nets by adding timing constraints, it is provide a formal method for the modeling and analysis of real-time system. A real-time schedulability analysis decide that a set of concurrent processes will always meet its deadline. In this paper, we present TCPN model for real-time system include timing constraints and propose a schedulability analysis algorithm using them. Also, When the TCPN model is unscheduleable under the imposed timing constraints, we propose a recovery technique that will be scheduleable by the system specification modifying or timing constraints relaxing in the optimized time.

  • PDF

Dam Failure and Unsteady Flow Analysis through Yeoncheon Dam Case(I) -Analysis of Dam Failure Time and Duration by Failure Scenarios and Unsteady Flow - (연천댐 사례를 통한 댐 파괴 부정류해석 및 하류 영향 검토(I) -댐 파괴 시나리오와 부정류 해석을 통한 지속시간 및 파괴시간 해석-)

  • Jang, Suk-Hwan
    • Journal of Environmental Science International
    • /
    • v.17 no.11
    • /
    • pp.1281-1293
    • /
    • 2008
  • This study aims at the estimation of dam failure time and dam failure scenario analysis of and applied to Yeoncheon Dam which was collapsed August 1st 1999, using HEC-HMS, DAMBRK-FLDWAV simulation model. As the result of the rainfall-runoff simulation, the lancet flood amount of the Yeoncheon Dam site was $10,324\;m^3/sec$ and the total outflow was $1,263.90\;million\;m^3$. For the dam failure time estimation, 13 scenarios were assumed including dam failure duration time and starting time, which reviewed to the runoff results. The simulation time was established with 30 minutes intervals between one o'clock to 4 o'clock in the morning on August 1, 1999 for the setup standard for each case of the dam failure time estimation, considering the arrival time of the flood, when the actually measured water level was sharply raising at Jeongok station area of the Yeoncheon Dam downstream, As results, dam failure arrival time could be estimated at 02:45 a.m., August 1st 1999 and duration time could be also 30 minutes. Those results and procedure could suggest how and when dam failure occurs and analyzes.

Impact Variables of Dump Truck Cycle Time for Heavy Excavation Construction Projects

  • Song, Siyuan;Marks, Eric;Pradhananga, Nipesh
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.2
    • /
    • pp.11-18
    • /
    • 2017
  • The cycle time of construction equipment for earthwork operations has a significant impact on project productivity. Elements that directly impact a haul vehicle's cycle time must be identified in order to accurately quantify the haul cycle time and implement strategies to decrease it. The objective of this research is to scientifically identify and quantify variables that have a significant impact on the cycle time of a dump truck used for earthwork. Real-time location data collected by GPS devices deployed in an active earthwork moving construction site was analyzed using statistical regression. External data including environmental components and haul road conditions were also collected periodically throughout the study duration. Several statistical analyses including a variance analysis and regression analysis were completed on the dump truck location data. Collected data was categorized by stage of the dump truck cycle. Results indicate that a dump truck's enter idle time, exit idle time, moving speed and driver visibility can significantly impact the dump truck cycle time. The contribution of this research is the identification and analysis of statistically significant correlations of variables within the cycle time.

A Study on Process Analysis of Visual Understanding on accordance in Attention Time (주시시간에 따른 시각적 이해과정 분석에 관한 연구)

  • Kim, Jong-Ha
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.4
    • /
    • pp.101-108
    • /
    • 2011
  • When observing an object in a space, a part of it is remembered into our perception in the time for paying attention or conscious observation and it reaches to our visual understanding. In this study, it examined characteristics by each subject through the process of visual understanding by changes in such observation time. The results from this study are summarized as belows: First, through analysis of the observation data focused on the distance between the observed points, it was able to apply those visual theories organized before to the analysis of characteristics of the time for understanding by each subject. Second, there showed big differences in the time for visual understanding by each subject according to changes in the observation time so that it was found that there were big differences according to the characteristics of subject's intention or purpose of the observation of a space. Third, as the number of continuous observation gives an important clue in judgement of how well the space was understood, it was able to compare and organize the mutual characteristics of the time the attention was concentrated, the time observed intentionally and the time understood visually. Fourth, it was found that the shorter subjects gave the intentional observation in observing a space, the longer they spent the time for paying attention, while the less they could understand it visually.

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

ALC(Autoclaved Lightweight Concrete) Hardness Prediction by Multiple Regression Analysis (다중회귀분석을 이용한 ALC 경도예측에 관한 연구)

  • Kim, Kwang-Soo;Baek, Seung-Hoon;Chung, Soon-Suk
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.2
    • /
    • pp.101-111
    • /
    • 2012
  • In the ALC(Autoclaved lightweight concrete) manufacturing process, if the pre-cured semi-cake is removed after proper time is passed, it will be hard to retain the moisture and be easily cracked. Therefore, in this research, we took the research by multiple regression analysis to find relationship between variables for the prediction the hardness that is the control standard of the removal time. We study the relationship between Independent variables such as the V/T(Vibration Time), V/T movement, expansion height, curing time, placing temperature, Rising and C/S ratio and the Dependent variables, the hardness by multiple regression analysis. In this study, first, we calculated regression equation by the regression analysis, then we tried phased regression analysis, best subset regression analysis and residual analysis. At last, we could verify curing time, placing temperature, Rising and C/S ratio influence to the hardness by the estimated regression equation.

  • PDF