• Title/Summary/Keyword: Amount of settlement

Search Result 219, Processing Time 0.03 seconds

A Study on the Behavior of Surface Settlement due to the Excavation of Twin TBM Tunnels in the Clay Grounds (점토지반에서 TBM 병렬터널 굴진 시 지표침하거동에 대한 연구)

  • You, Kwangho;Jung, Suntae
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.2
    • /
    • pp.29-40
    • /
    • 2019
  • Mechanized constructions have been frequently increased in soft ground below sea bed or river bed, for urban tunnel construction, and for underpinning the lower part of major structures in order to construct a safer tunnel considering various risk factors during the tunnel construction. However, it is difficult to estimate the subsidence behavior of the ground surface due to excavation and needs to be easily predicted. Thus, in this study, when a twin tunnel is constructed in the soft ground, it is proposed a simpler equation relating to the settlement behavior and a corrected formula applicable to soft ground and large diameter shield tunnels based on the previously proposed theory by Peck (1969). For this purpose, it was analyzed to long-term measurement values such as the amount of maximum settlement, the subsidence range by ground conditions, and interference volume loss due to the parallel construction, etc. As a result, a equation was suggested to predict the amount of maximum settlement in the soft sediment clay ground where is located at the upper part of the excavation site. It is turned out that the proposed equation is more suitable for measurement data in Korea than Peck (1969)'s.

Determination of Plastic Settlement of Mortar Using Non-contact Laser Measurement Device (레이저 거리측정 실험을 통한 모르타르의 소성침하량 산정)

  • Kwak, Hyo-Gyoung;Ha, Soojun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4A
    • /
    • pp.549-564
    • /
    • 2008
  • In this paper, the plastic settlement of mortar is analyzed on the basis of the small strain consolidation theory, and the validity of the approach is verified through the comparison with experimental data. First, the amount of settlement caused by self-weight of bulk mortar is measured using a non-contact laser measurement device and the estimation of material parameters related to the settlement of mortar is followed. In advance, another experiment is also performed on mortar with embedded reinforcement to measure the settlement distribution, and the influence of mixture proportions and cover depth on unequal settlement is analyzed. Finally, correlation studies between experimental data and settlement distribution obtained by consolidation analysis represents that the application of consolidation theory to the analysis of plastic settlement of mortar is reasonable.

The Settlement Characteristics of Incheon Unsanitary Solid Waste Landfill (인천지역 비위생 매립지반의 침하특성 연구)

  • Cho, Seok-Ho;Lim, Ju-Hyun;Kim, Hak-Moon
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.7
    • /
    • pp.37-42
    • /
    • 2008
  • This paper estimates the long-term settlement of Incheon unsanitary solid waste landfill, which is 20 years old. The unsanitary solid waste landfill was subjected to pre-loading system over a period of 1 year, and 300 settlement monitoring provided the long term settlement data. This landfill contains relatively small amount of organic component, and therefore the initial stage of settlement was very small. The existing settlement models were examineed by comparing the observed behaviors of this site, and also they were used to predict the long-term settlement. Power Creep Law (PCL) model showed good agreement with the measured settlement obtained from the initial stage of the measurement, but other models showed satisfactory agreements after $50{\sim}70$ days of measurement.

The Numerical Study on Individual Vacuum Seepage Consolidation Method with Flexible Well Point (연성 Well Point를 적용한 개별진공 침투압밀공법에 관한 해석적 연구)

  • Kim, Byung-Il;Hong, Kang-Han;Kim, Young-Seon;Han, Sang-Jae
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.1
    • /
    • pp.11-21
    • /
    • 2022
  • In this study, the individual vacuum seepage consolidation method, a new soft ground improvement method, was developed to supplement the conventional suction drain method (individual vacuum preloading method) and the geotechnical behavior was predicted through numerical analysis. If the individual vacuum seepage consolidation method applied, the effect of accelerating settlement and increasing the amount of settlement was high when the aquifer was located in the middle or at the bottom of the layer to the target improvement layer. It was found that the pumping amount in the aquifer does not affect the settlement behavior when it exceeds a certain level. Even vacuum pumping wells were installed in various locations, such as inside or outside of the embankment, the difference in settlement and horizontal displacement was insignificant. In addition, it was predicted that the settlement rate was the fastest and the horizontal displacement (inward) was large when both methods were carried out at the same time. Since this method can reach the target settlement amount very quickly, it was confirmed that it is possible to increase the spacing of vertical drain, thereby securing economic feasibility.

Effects of Size and Shape of Drain on Horizontal Vacuum Drain (배수재의 직경과 형상변화가 수평진공배수에 미치는 영향)

  • Yoo, Nam-Jae;Park, Byung-Soo;Jeong, Gil-Soo;Lee, Byung-Kon
    • Journal of Industrial Technology
    • /
    • v.21 no.A
    • /
    • pp.293-301
    • /
    • 2001
  • This paper is experimental results of investigating the efficiency of horizontal vacuum drainage system. Effects of size and shape of drain on horizontal vacuum drainage were studied. Model tests in the laboratory with soft marine clay were carried out with drain pipe of having three different diameters and PBD (Plastic Board Drain) of strip shape so that consolidation settlement of soft clay due to applied vacuum pressure, amount of discharge, ground settlement and distributions of pore pressure and undrained shear strength were measured during testing. From results of model test, amount of discharge due to vacuum pressure was increased with the diameter of pipe drain whereas the drain efficiency of pipe in per unit area of drain surface was decreased with diameter of pipe. The rate of discharge per unit time was reduced very fast with diameter of pipe. Settlement of ground surface with time was increased with diameter of pipe as a result of increase of discharge to drain pipe.

  • PDF

연약지반에 축조하는 강제치환 호안사석의 시공관리방법에 관한 연구

  • Kim, You-Seong;Park, Pyung-Gab
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1466-1472
    • /
    • 2010
  • In order to construct extremely large scale of sea dike like Saemanguem dike, extremely large amount of mass of rock are needed. In this case, it is general methods to estimate required amount of rock mass based on characteristics of consolidation settlement and bearing capacity of seabed, because it is impossible to estimate exact amount of rock material based on varied seabed condition.. Even in this general methods, it is very few case to manage rock mass amount by estimation of actual input rock mass but the main point is focused on the final section formation considering of designed section and reserve embankment, so excessive or underestimating result of rock mass would be occurred surely. This general methods is not resonable in the points of economic and stable. In this study, optimum construction management method of rubble mound in the 3rd section construction of Saemanguem sea dike is suggested based on comparing required rock mass estimating from consolidation settlement theory with actual input rock mass. It is found out that the optimum input quantity of rock mass is about $1,900{\sim}2,000m^3$/day.

  • PDF

Evaluation of the Structural Stability of Rammed Earth Construction :The Case Restoration Project of the Stone Pagoda at Mireuksa Temple Site in Iksan

  • Min, Hwang-Sik;Choen, Deuk-Youm
    • Architectural research
    • /
    • v.20 no.3
    • /
    • pp.65-73
    • /
    • 2018
  • The restoration of foundations supporting the immense load of the stone pagoda at Mireuksa Temple Site prioritizes securing its structural stability. But so far, rammed earth construction is still not easy to determine the structural stability. This paper aims to emphasize that a scientific experimental study was conducted on a rammed earth construction, to identify its methodology and obtain objective data about structural stability of the foundation work. An experimental study fabricated specimens from the soil that had been removed during the excavation survey, determined the allowable bearing capacity through plate load tests, and compared the results with the predicted stress after reassembly of the stone pagoda to estimate the structural stability. Then, the repair method was selected based on the experimental study result. The evaluation method of the restoration of foundations consisted of an examination of the allowable bearing capacity and settlement. The allowable bearing of the reinforced foundation was more than twice the contact pressure under the stacked stones of the pagoda. The possibility of settlement of the rammed earth foundation soil layer during the pagoda assembly is expected to be very low because the settlement amount of the reformed soil layer is less than half of the settlement of the stabilized existing soil layer.

Instrumentation Management of Differential Settlement of the Deep Soft Ground with Dredged Clay Reclaimed in the Upper (대심도 준설 매립지반에서의 층별침하 계측관리에 관한 사례 연구)

  • Tae-Hyung Kim;Seung-Chan Kang;Ji-Gun Chang;Soung-Hun Heo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.1
    • /
    • pp.87-96
    • /
    • 2023
  • There are a lot of difference between the surface settlement and the differential settlement measured at the Busan New Port, where the dredged and reclaimed clay layer exists and below the clay is originally thickly distributed. To find the cause and solution of this, the actual conditions of each differential settlement used for the soft ground improvement, characteristics, installation method, measurement frequency, measurement data management, and data analysis of each type were considered. In the deep soft ground improvement work where large deformation occurs, the bending deformation of the screw-type differential settlement gauge is less than that of other types of measuring instruments, so there is less risk of loss, and the reliability of data is relatively high as the instruments are installed by drilling for each stratum. Since the greater the amount of high-precision settlement measurement data, the higher the settlement analysis precision. It is necessary to manage with higher criteria than the measurement frequency suggested in the standard specification. For the data management of the differential settlement gauge, it is desirable to create graphs of the settlement and embankment height of the relevant section over time, such as surface, differential, and settlement of pore water pressure gauge for each point. In the case of multi-layered ground with different compression characteristics, it is more appropriate to perform settlement analysis by calculating the consolidation characteristics of each stratum using a differential settlement data.

Experimental study to determine the optimal tensile force of non-open cut tunnels using concrete modular roof method

  • Jung, Hyuk-Sang;Kim, Jin-Hwan;Yoon, Hwan-Hee;Sagong, Myung;Lee, Hyoung-Hoon
    • Geomechanics and Engineering
    • /
    • v.29 no.3
    • /
    • pp.229-236
    • /
    • 2022
  • In this study, a model experiment and field experiment was conducted to introduce the optimal tensile force when constructing a non-open cut tunnel according to the ground conditions of sandy soil. CMR (Concrete Modular Roof) method is economical because of the high precision and excellent durability, and corrosion resistance, and the inserted parts can be used as the main structure of a tunnel. In addition the CMR method has a stable advantage in interconnection because the concrete beam is press-fitted compared to the NTR (New Tubular Roof) method, and the need for quality control can be minimized. The ground conditions were corrected by adjusting the relative density of sandy soil during the construction of non-open cut tunnels, and after introducing various tensile forces, the surface settlement according to excavation was measured, and the optimal tensile force was derived. As a result of the experiment, the amount of settlement according to the relative density was found to be minor. Furthermore, analysis of each tensile force based on loose ground conditions resulted in an average decrease of approximately 22% in maximum settlement when the force was increased by 0.8 kN per segment. Considering these results, it is indicated that more than 2.0 kN tensile force per segment is recommended for settlement of the upper ground.

Analysis of Relative Settlement Behavior of Retaining Wall Backside Ground Using Clustering (군집분류를 이용한 흙막이 벽체 배면 지반의 상대적 침하거동 분석)

  • Young-Jun Kwack;Heui-Soo Han
    • The Journal of Engineering Geology
    • /
    • v.33 no.1
    • /
    • pp.189-200
    • /
    • 2023
  • As urbanization and industrialization increase development in downtown areas, damage due to ground settlement continues to occur. Building collapse in urban has a high risk of leading to large-scale damage to life and property. However, there has rarely been studied on measurement data analysis methods when uneven loads are applied to the excavated ground and no prior knowledge of the ground. Accordingly, it was attempted to analyze the relative settlement behavior and correlation by processing the time-series surface settlement of construction sites in the urban. In this paper, the average index of difference in settlement and average of relative difference in settlement are defined and calculated, then plotted in the coordinate system to analyze the relative settlement behavior over time. In addition, since there was no prior knowledge of the ground, a standard to classify the clusters was needed, and the observation points were classified into using k-means clustering and Dunn Index. As a result of the analysis, it was confirmed that all the clusters moved to the stable region as the settlement amount converges. The clusters were segmented. Based on the analysis results, it was possible to distinguish between the independent displacement area and same behavior area by analyzing the correlation between measurement points. If possible to analyze the relative settlement behavior between the stations and classify the behavior areas, it can be helpful in settlement and stability management, such as uplift of the surrounding area, prediction of ground failure area, and prevention of activity failure.