• Title/Summary/Keyword: Advanced railroad

Search Result 282, Processing Time 0.032 seconds

Management Plan on Test Track of Advanced EMU System (차세대전동차 시스템 시험선 운영 방안)

  • Lee, H.M.;Kim, G.D.;Park, S.H.;Oh, S.C.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1036-1037
    • /
    • 2008
  • Test track of the Advanced EMU system will be developed and organically combined with technologies of power supply system, signal communication system and track structure. The purpose of the test track is a acquirement of reliability and stability through a sufficient performance test. Therefore, this paper draws up all management plans for tests of the Advanced EMU system.

  • PDF

Comparison of Ride Comfort between Korean and European High Speed Railway by using Continuous Comfort Method (Continuous Comfort 방법을 이용한 국내외 고속철도 승차감 비교)

  • Choi, Il-Yoon;Um, Ju-Hwan;Lee, Jun Suk;Choi, Min-Ji;Lim, Jihoon
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.3
    • /
    • pp.203-211
    • /
    • 2015
  • Ride comfort of a vehicle can be utilized to maintain the track geometry and track irregularities because ride comfort of the rolling stock is affected by the characteristics of the vehicle and track. Ride comfort was evaluated according to the measured floor acceleration data of vehicles for a Korean high speed line as well as European high speed lines using Continuous comfort method which can be applied to track maintenance. The exceedance distribution of the ride comfort was quantitatively analyzed by the vehicle speed, the ride comfort of the Korean high speed line was compared with that of European high speed lines. It is shown that the ride comfort of Korean high speed line is better than that of European high speed lines, which indicates that the Korean track geometry and track irregularities are properly maintained.

A Study on the D-InSAR Method for Micro-deformation Monitoring in Railway Facilities (철도시설물 미소변형 모니터링을 위한 D-InSAR 기법 연구)

  • Kim, Byung-Kyu;Lee, Changgil;Kim, Winter;Yoo, Mintaek;Lee, Ilhwa
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.11
    • /
    • pp.43-54
    • /
    • 2022
  • The settlement at the railroad foundation is often the leading cause of track irregularity and potential derailment. The control of such deformation is considered necessary in track maintenance practice. Nevertheless, the monitoring process performed by in situ surveying requires an excessive amount of manpower and cost. The InSAR, a remote sensing technique by RADAR satellite, is used to overcome such a burden. The PS-InSAR technique is preferred for a long-term precise monitoring method. However, this study aims to obtain relatively brief analysis results from only two satellite images using the D-InSAR technique, while a minimum of 25 images are required for PS-InSAR. This study verifies the precision of D-InSAR within a few millimeters by inspecting railroad facilities and land settlements in Korea Railroad Research Institute's test track with images from TerraSAR-X Satellite. Multiple corner reflectors were adopted and installed on an embankment and the building roof to raise the surface reflectivity. Those reflectors were slightly adjusted periodically to verify the detecting performance. The results revealed the optimum distance between corner reflectors. Further, the deformation of railway tracks, slopes, and concrete structures was analyzed successively. In conclusion, this study indicates that the D-InSAR technique effectively monitors the short-term deformation of a broad area such as railway structures.

Field Tests of DC 1500 V Stationary Energy Storage System

  • Lee, Hanmin;Kim, Gildong;Lee, Changmu;Joung, Euijin
    • International Journal of Railway
    • /
    • v.5 no.3
    • /
    • pp.124-128
    • /
    • 2012
  • The ESS(energy storage system, here after) for a DC 1500V was developed in 2009. A ESS was installed on the track of Daejeon HRT in 2010. The advantage of the ESS is that it can save the energy and plus stable the catenary voltage. This paper presents the energy saved by the ESS in Daedong substation. When the ESS is on/off, the field tests are performed.

Scalability Overheads Analysis for Stereoscopic Video Coding (스테레오 비디오 부호화에서의 시공간적 계위 오버헤드)

  • Oh Sehchan;Kim Gildong;Park Sunghyuk;Lee Hanmin
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.07b
    • /
    • pp.826-828
    • /
    • 2005
  • 본 논문에서는 이질적인 수신단말들에 효율적인 스테레오 영상전송을 위한 시공간적 계위를 이용한 부호화 방법을 제시하였으며, 각각의 시간적, 공간적 계위의 오버헤드를 분석하였다. 제시된 부호화기는 유연성있는 스테레오 비디오 서비스를 위해서 하나의 영상에 각각 시간적, 공간적으로 확장 가능한 추가적인 비트열을 정의하였다. 실험을 통하여 공간적 계위 오버헤드는 시간적 계위 오버헤드에 비해 상대적으로 크지만, 스테레오 부호화기의 양안차 예측으로 인해 많이 감소됨을 보였다. 제안된 스테레오 비디오 부호화기는 다양한 디스플레이 장치 및 네트워크 환경을 가지는 유비쿼터스 컴퓨팅 환경을 위한 효율적인 스테레오 비디오 전송 서비스에 활용될 것으로 기대된다.

  • PDF

A Study on the Design Procedure of the Eight Pole Magnetic Bearings for the Inner-rotor and the Outer-rotor Type

  • Lee, Jun-Ho;Park, Chan-Bae;Lee, Byung-Song;Lee, Su-Gil;Kim, Jae-Hee;Jung, Shin-Myung;Lee, Hyung-Woo
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.6
    • /
    • pp.1424-1430
    • /
    • 2013
  • This paper presents design procedure of the magnetic bearings used for high-speed electric machines and flywheel energy storage systems. Magnetic bearing can be categorized by inner-rotor type and outer-rotor type according to the position of the rotary disc. These two types are applicable based on application environments such as application space, required attraction force, and controllability. Magnetic bearing is generally designed based on the ratio (geometrical coefficient or geometrical efficiency) of pole width to rotor journal radius but proper ratio is only decided by the analysis. This is the difficulty of the magnetic bearing design. In this paper, proper design technology of the inner-rotor type and outer-rotor-type eight pole magnetic bearings is introduced and compared with the FEM analysis results, which verifies the proposed design procedure is suitable to be applied to the design of the magnetic bearings for the industrial applications and flywheel energy storage system.

Design of umbrella arch method based on adaptive SVM and reliability concept (Adaptive SVM 기법 및 신뢰성 개념을 적용한 강관다단공법의 설계기법 연구)

  • Lee, Jun S.;Sagong, Myung;Park, Jeongjun;Choi, Il Yoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.701-715
    • /
    • 2018
  • A reliability based design approach of the tunnel reinforcement with umbrella arch method was considered to better represent the uncertainties of the weak rock properties around the tunnel. For this, a machine learning approach called an Adaptive Support Vector Machine (ASVM) together with the limit equilibrium method were introduced to minimize the iteration numbers during the classification training of the tunnel stability. The proposed method was compared with the results of typical Monte Carlo simulations. It was concluded that the ASVM was very efficient and accurate to calculate the probability of failure having auxiliary umbrella arches and uncertain material properties of the tunnel. Future work will be concentrated on the refinement of the fast adaptation of the SVM classification so that the minimum number of numerical analyses can be used where the limit solution is not available.

Evaluation of Dynamic Behavior for Pile-Supported Slab Track System by 3D Numerical Analysis (3차원 수치해석을 통한 궤도지지말뚝의 동적거동 평가)

  • Yoo, Mintaek;Back, Mincheol;Lee, Ilhwa;Lee, Jinsun
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.21 no.5
    • /
    • pp.255-264
    • /
    • 2017
  • Dynamic numerical simulation of pile-supported slab track system embedded in a soft soil and embankment was performed. 3D model was formulated in a time domain to consider the non-linearity of soil by utilizing FLAC 3D, which is a finite difference method program. Soil non-linearity was simulated by adopting the hysteric damping model and liner elements, which could consider soil-pile interface. The long period seismic loads, Hachinohe type strong motions, were applied for estimating seismic respose of the system, Parametric study was carried out by changing subsoil layer profile, embankment height and seismic loading conditions. The most of horizontal permanent displacement was initiated by slope failure. Increase of the embedded height and thickness of the soft soil layer leads increase of member forces of PHC piles; bending moment, and axial force. Finally, basic guidelines for designing pile-supported slab track system under seismic loading are recommended based on the analysis results.

A Evaluation of Emergency Braking Performance for Electro Mechanical Brake using Interior Permanent Magnet Synchronous Motor (매입형 영구자석 동기전동기를 적용한 전기기계식 제동장치의 비상제동 성능평가)

  • Baek, Seung-Koo;Oh, Hyuck-Keun;Park, Joon-Hyuk;Kim, Seog-Won;Kim, Sang-soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.6
    • /
    • pp.170-177
    • /
    • 2020
  • This study examined the clamping force control method and the braking performance test results of an electromechanical brake (EMB) using braking test equipment. Most of the studies related to EMBs have been carried out in the automotive field, dealing mainly with the static test results for various control methods. On the other hand, this study performed a dynamic performance evaluation. The three-phase interior permanent magnet synchronous motor (IPMSM) was applied to drive the actuator of the EMB, and the analysis was verified by JMAG(Ver. 18.0), which is finite element method (FEM) software. The current control, speed control, and position control were used for clamping force control of the EMB, and the maximum torque per ampere (MTPA) control was applied to the current controller for efficient control. The EMB's emergency braking deceleration performance was tested in the same way as conventional pneumatic brake systems when the wheel of a train rotates at 110 km/h, 230 km/h, and 300 km/h. The emergency braking time, with the wheel stopped completely at the maximum rotational speed, was approximately 73 seconds. The similarity of the braking time and deceleration pattern was verified through a comparison with the performance test results of the pneumatic brake system applied to the next generation high-speed railway vehicle (HEMU-430X).

Signalling System Standardization for Linear Induction Motor Type Light Rail Transit (선형유도모터형식 경전철 신호제어시스템 표준사양 연구)

  • Cho, Bong-Kwan;Hwang, Hyeon-Chyeol;Cho, Hong-Shik;Hong, Jai-Sung;Ryu, Sang-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1183-1184
    • /
    • 2007
  • Light Rail Transit (LRT) is optimized vehicle system for complex urban circumstance. LRT systems have many merits such as improved accuracy and safety. There are many LRT systems such as monorail, tram, automated guideway transit, linear induction motor propulsion and so on. These systems have been operated in Japan and other advanced countries. In Korea, local government has many projects to apply the advanced LRT system. But there are no standards regulation, performance test regulation and construction regulation for monorail system, linear induction motor system and tram in Korea. We expect that standardization brings economical construction and safety. The linear induction motor system has been usually applied to subway in Japan and ART(Advanced Rapid Transit) in Canada. In Korea, the linear induction motor system has been adopted for Yong-In LRT and currently under construction. This paper presents signalling system and TCMS(train control and monitoring system) of linear induction motor system.

  • PDF