• Title/Summary/Keyword: Actual discharge

Search Result 269, Processing Time 0.02 seconds

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

Development of a Critical Pathway for Patients with Coronary Artery Bypass Graft (관상동맥 우회술 환자를 위한 Critical Pathway개발)

  • 김기연
    • Journal of Korean Academy of Nursing
    • /
    • v.28 no.1
    • /
    • pp.117-131
    • /
    • 1998
  • The purpose of this study was to develop a critical pathway for case management for patients who have received Coronary Artery Bypass Graft (CABG) because of Ischemic Heart Disease(IHD) which is a factor of rising medical expenses. For this study. a conceptual framework was developed through a review of the literature including six critical pathways which are currently being used in USA. In order to identify the overall service contents required by these patients and to draw up a preliminary critical pathway, 30 cases of medical records of patients who had CABG because of IHD between January, 1995 to June. 1996 at the Cardiovascular Center of Yonsei Medical Center in Seoul were analyzed. An expert validity test was done for the preliminary critical pathway and clinical validity test was also done using seven IHD patients with CABG between November 11 and 23, 1996. After these processes. the final critical pathway was developed. The results of this study are summarized as follows : 1. The vertical axis of the critical pathway includes the following eight items : tests, nutrition, medications, consultations, activity, assessments, treatments, education discharge planning and the horizontal axis includes the time from the start of hospitalization to discharge. 2. Analysis of the 30 medical records indicated that the average length of stay was 20.2days with the average length of stay from hospitalization day to operation day being 6.2 days, and the average length of stay from operation day to discharge day was 13. 9 days. Analysis of the service contents showed that the horizontal axis of the preliminary critical pathway was set from hospitalization to the 14th post operation day and the vertical axis was set to include eight items, the contents which ought to have occurred, according to the time frames of the horizontal axis. 3. As a result of the experts validity, it was found that among the total of 571 items. there was over 83% agreement for 482 items, less than 83% for 89 items, which were then deleted and a revision of the critical pathway was done. 4. A clinical validity test was done using seven IHD patients with CABG. During the process, three patients were deleted because they were out of the criteria the investigator set. Finally, four patients were used. The result of study indicated that only one patient was discharged on the tenth post operation day, which was one day later than the expected day. Three patients were discharged later than the expected day from three days to nine days. All the cases progressed on schedule until the operation day and the first post operation day, but from the second post operation days, there were differences between the critical pathway and the actual practice. The differences came from tests, assessments, and treatments. 5. On the basis of the results of the clinical validity test. the following revisions in the final critical pathway were made : the transfer from ICU to step down ward would be the second post operation day, and the transfer to a general ward, the fifth post operation day, for patients who complained of lack of sleep from the fifth post operation day to discharge, a sleeping pill would be prescribed, skin observations would be performed routinely from immediately after the operation until the third post operation day, and would continue if there was a sign of skin injury on the fourth post operation day, and assessment of chest pain would be done from the third post operation day, and the “stairs climbing” item, expected to be done on the ninth post operation day would be deleted. In conclusion, this critical pathway is partially applicable to the care of patients with CABG but there are some parts needed to be further investigated.

  • PDF

An Experimental Research on Uniform Corrosion of Inconel 600 and 690 Tubing Material (Inconel 600 및 690 튜브 재질의 일반 부식에 관한 실험적 연구)

  • Yeom Yu-Sun;Hwang Jung-Lae;Jun In-Sub;Kim Soong-Pyung;Yoon Jang-Hee
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.2
    • /
    • pp.103-116
    • /
    • 2006
  • By executing corrosion experiment on Inconel 600, 690 used to material of S/G tube in domestic NPP, this paper show estimation of amount of product such as Co-58, Co-60, Cr-51, Mn-54, Fe-59 which are main exposure cause to the workers in NPP. Therefore, Making the 12 samples consisted of Inconel 600, 690, whole corrosion experiment was carried out for 60 days(each pH by 20 days). The conditions of those tests were similar or more harsh than actual conditions of domestic NPP. The Glow Discharge Spectrometer(GDS) was used for quantitative analysis of results. The results of using GDS, the Inconel 600 corrodes more than Inconel 690 at pH 7 and pH 9. However, it is observed that Inconel 690 corrodes more than Inconel 600 at pH 4. Those results is estimated that test sections had the effect of transient. The long terms of experiment is required to minimize and solve the problem.

  • PDF

Plume Rise and Initial Dilution Determination Reflecting the Density Profile over Entire Water Column (해수 전체 컬럼에서 밀도 분포를 반영한 플룸 상승과 초기 희석도 결정)

    • Journal of Korean Port Research
    • /
    • v.11 no.2
    • /
    • pp.215-230
    • /
    • 1997
  • A number of ocean outfalls are located around coastal area over the United States and discharge primary treated effluent into deep water for efficient wastewater treatment. Two of them, the Sand Island and Honouliuli municipal wastewater outfalls, are located on the south coast of Oahu. There have been growing interests about the plume dynamics around the ocean outfalls since plume discharged from the multiport diffuser may have significant impacts on coastal communities and immediate consequence on public health. Among the studies of plume dynamics performed in the vicinity of both outfalls, Project MB-4 in the Mamala Bay Study recently made with the funding in the $ 9 million amount statistically dealt with the near-field behavior of the plumes at the Sand Island and Honouliuli outfalls. However, Project MB-4 predicted much higher surfacing frequency than the realistic value obtained by model studies by Oceanit Laboratories, Inc.. It is suggested that improvements should be made in the application of the plume model to more simulate the actual discharge characteristics and ocean conditions. In this study, it has been recommended that input parameters in plume models reflect realistic density profile over the entire water column since. in the previous Mamala Bay Study, the density profiles were measured at 5m depth increments extending from 13 to 63 m depth (the density profile on the upper portion of water column was not included, Roberts 1995). It is proved that the density stratification is the important parameter for the submergence of the plume. In this study, as one of the important parameters, plume rise and initial dilution reflecting the density profile over the entire water column have been taken into account for more reliable plume behavior description.

  • PDF

Research on the improvement measures on the guidance and inspection for an environmental pollutant discharging company by using the problem analysis (환경오염물질 배출업소 지도·점검 문제점 분석을 통한 개선방안 연구)

  • Son, Seung-Woo;Yoon, Jeong-Ho;Jeon, Hyung-Jin;Jo, Nam-Wook;Myung, Nho-il
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.6466-6474
    • /
    • 2015
  • The purpose of this study is to indicate the problem and its improvement plan derived from pollution discharge industries inspection, implementation process on overall instruction including record management, and utilization of information about emission. This focuses on analyzing the inspection system of pollution discharge industries and the actual condition of management system with survey and interview from the managers. As a result of examining the administration information system from each of structural and practical perspectives, the users were not able to receive support for inspection through the system because it was designed based on licensing. Also according to results of survey and interview, it was difficult to input checkup data and to maintain the information of emission in a sustainable manner. This problem occurs since the current system is not utilized properly. Thus, this study examines similar systems operated in Korea and suggests measure to make improvements. The measures are considered as constructing simple user interface for systematizing of administrative works, simplifying the input matters, linking systems of inspection and emission information, establishing statistical function of emission information, and managing inspection functions through the mobile system.

Accuracy Analysis of Velocity and Water Depth Measurement in the Straight Channel using ADCP (ADCP를 이용한 직선 하천의 유속 및 수심 측정 정확도 분석)

  • Kim, Jongmin;Kim, Dongsu;Son, Geunsoo;Kim, Seojun
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.5
    • /
    • pp.367-377
    • /
    • 2015
  • ADCPs have been highlighted so far for measuring steramflow discharge in terms of their high-order of accuracy, relatively low cost and less field operators driven by their easy in-situ operation. While ADCPs become increasingly dominant in hydrometric area, their actual measurement accuracy for velocity and bathymetry measurement has not been sufficiently validated due to the lack of reliable bench-mark data, and subsequently there are still many uncertain aspects for using ADCPs in the field. This research aimed at analyzing inter-comparison results between ADCP measurements with respect to the detailed ADV measurement in a specified field environment. Overall, 184 ADV points were collected for densely designed grids for the given cross-section that has 6 m of width, 1 m of depth, and 0.7 m/s of averaged mean flow velocity. Concurrently, ADCP fixed-points measurements were conducted for each 0.2m and 0.02m of horizontal and vertical spacing respectively. The inter-comparison results indicated that ADCP matched ADV velocity very accurately for 0.4~0.8 of relative depth (y/h), but noticeable deviation occurred between them in near surface and bottom region. For evaluating the capacity of measuring bathymetry of ADCPs, bottom tracking bathymetry based on oblique beams showed better performance than vertical beam approach, and similar results were shown for fixed and moving-boat method as well. Error analysis for velocity and bathymetry measurements of ADCP can be potentially able to be utilized for the more detailed uncertainty analysis of the ADCP discharge measurement.

Application of MPI Technique for Distributed Rainfall-Runoff Model (분포형 강우유출모형 병렬화 처리기법 적용)

  • Chung, Sung-Young;Park, Jin-Hyeog;Hur, Young-Teck;Jung, Kwan-Sue
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.8
    • /
    • pp.747-755
    • /
    • 2010
  • Distributed Models have relative weak points due to the amount of computer memory and calculation time required for calculating water flow using a numerical analysis based on kinematic wave theory when compared to the conceptual models used so far. Typically, the distributed models have been mainly applied to small basins. It was necessary to decrease the resolution of the grid to make it applicable for large scale watersheds, and because it would take up too much time to calculate using a higher resolution. That has been one of the more difficult factors in applying the model for actual work. In this paper, MPI (Message Passing Interface) technique was applied to solve the problem of calculation time as it is one of the demerits of the distributed model for performing physical and complicated numerical calculations for large scale watersheds. The comparison studies were performed a single domain and a divided small domain in Yongdam Dam watershed in case of typoon 'Ewiniar' at 2006. They were compared to analyze the application effects of parallelization technique. As a result, a maximum of 10 times the amount of calculation time was saved but keeping the level of quality for discharge by using parallelization code rather than a single processor.

Analysis of correlation between shield TBM construction field data and settlement measurement data (쉴드 TBM 시공데이터와 지반침하 계측데이터 간 상관성 분석)

  • Jung, Ye-Rim;Nam, Kyoung-Min;Kim, Han-Eol;Ha, Sang-Gui;Yun, Ji-Seok;Cho, Jae-Eun;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.79-94
    • /
    • 2022
  • The demand for tunnel construction is increasing as part of underground space development due to urban saturation. The shield TBM method minimizes vibration and noise and minimizes ground deformation that occurs simultaneously with excavation, and shield TBM is generally applied to tunnel construction in urban areas. The importance of urban ground settlement prediction is increasing day by day, and in the case of shield TBM construction, ground deformation is minimized, but ground settlement due to tunnel excavation inevitably occurs. Therefore, in this study, the correlation between shield TBM, which is highly applicable to urban areas, and ground settlement is analyzed to suggest the shield TBM construction factors that have a major effect on ground settlement. Correlation analysis was performed between the shield TBM construction data and ground settlement measurement data collected at the actual site, and the degree of correlation was expressed as a correlation coefficient "r". As a result, the main construction factors of shield TBM affecting ground settlement were thrust force, torque, chamber pressure, backfill pressure and muck discharge. Based on the results of this study, it is expected to contribute to the presentation of judgment criteria for major construction data so that the ground settlement can be predicted and controlled in advance when operating the shield TBM in the future.

Flood Runoff Simulation Using GIS-Grid Based K-DRUM for Yongdam-Dam Watershed (GIS격자기반 K-DRUM을 활용한 용담댐유역 홍수유출모의)

  • Park, Jin Hyeog;Hur, Young Teck;Ryoo, Kyong Sik;Lee, Geun Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.145-151
    • /
    • 2009
  • Recently, the rapid development of GIS technology has made it possible to handle a various data associated with spatially hydrological parameters with their attribute information. Therefore, there has been a shift in focus from lumped runoff models to distributed runoff models, as the latter can consider temporal and spatial variations of discharge. This research is to evaluate the feasibility of GIS based distributed model using radar rainfall which can express temporal and spatial distribution in actual dam watershed during flood runoff period. K-DRUM (K-water hydrologic & hydaulic Distributed flood RUnoff Model) which was developed to calculate flood discharge connected to radar rainfall based on long-term runoff model developed by Kyoto- University DPRI (Disaster Prevention Research Institute), and Yondam-Dam watershed ($930km^2$) was applied as study site. Distributed rainfall according to grid resolution was generated by using preprocess program of radar rainfall, from JIN radar. Also, GIS hydrological parameters were extracted from basic GIS data such as DEM, land cover and soil map, and used as input data of distributed model (K-DRUM). Results of this research can provide a base for building of real-time short-term rainfall runoff forecast system according to flash flood in near future.

A Study on Recent Discussions ahout the Pysician's Explanation in Medical Litigation (의료소송에서 의사의 설명에 대한 최신 지견)

  • Baek, Kyounghee
    • The Korean Society of Law and Medicine
    • /
    • v.24 no.4
    • /
    • pp.37-63
    • /
    • 2023
  • In medical litigation, there are various cases where a doctor's 'explanation' of a patient becomes problematic. Medical explanations and guidance are required from the doctor, starting from the beginning of diagnosis, through treatment processes such as surgery, when hospitalization is necessary for treatment, during hospitalization, upon discharge, and after discharge. Furthermore, notification from the doctor or medical institution may be requested regarding the economic costs that will be incurred due to medical treatment. South Korea's judiciary has been developing legal principles regarding such doctor's explanations by distinguishing between explanations for obtaining consent for medical treatment and medical explanations related to guidance on patient treatment methods, taking into account related laws such as the stage of treatment and the Medical Service Act. Additionally, the Constitutional Court recently ruled on the non-benefit cost notification system linked to the explanation of economic costs. However, holding a doctor accountable solely because the doctor's explanation was insufficient has aspects that do not correspond to the actual situation in clinical reality, and may have a reflexive disadvantage that results in a decline in legal rights. Therefore, the doctor's explanation needs to be examined from both perspectives: guaranteeing the patient's right to self-determination and protecting his or her right to decision.