• Title/Summary/Keyword: Actual cost for work performed

Search Result 25, Processing Time 0.027 seconds

A Study on Concentrating Photovoltaic Module with Plate Structure (평판 구조의 집광형 태양광 모듈 구조에 관한 연구)

  • Park, Seung-Jae;Hong, Min-Sung
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.22 no.4
    • /
    • pp.629-634
    • /
    • 2013
  • This study aims to investigate a new structure for a concentrating photovoltaic (PV) module using a III-V compound semiconductor solar cellto solve the problems of existing concentrating PV modules and to explore a concentrating optical system with a flat structure, which shows remarkable advantages in terms of manufacturing cost, installation, and maintenance. This study should greatly contribute toward the development of concentrating PV modules. This study was performed to achieve an improvement in efficiency and economy and to implement an actual product. A new source of renewable energy is the only way in which countries that cannot produce oil can even emerge as an energy power. Therefore, this work can serve as a fundamental study that will help South Korea grow into a country that is a PV power generation force.

Aircraft Fuel Efficiency Improvement and Effect through APMS (APMS 활용을 통한 항공기 연비향상 및 기대효과 )

  • Jae Leame Yoo
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.31 no.2
    • /
    • pp.81-88
    • /
    • 2023
  • SHM (Structural Health Monitoring) technique for monitoring aircraft structural health and damage, EHM (Engine Health Monitoring) for monitoring aircraft engine performance, and APM (Application Performance Management) is used for each function. APMS (Airplane Performance Monitoring System) is a program that comprehensively applies these techniques to identify the difference between the performance manual provided by the manufacturer and the actual fuel mileage of the aircraft and reflect it in the flight plan. The main purpose of using APMS is to understand the performance of each aircraft, to plan and execute flights in an optimal way, and consequently to reduce fuel consumption. First, it is to check the fuel efficiency trend of each aircraft, check the correlation between the maintenance work performed and the fuel mileage, find the cause of the fuel mileage increase/decrease, and take appropriate measures in response. Second, it is to find the cause of fuel mileage degradation in detail by checking the trends by engine performance and fuselage drag effect. Third, the APMS is to be used in making maintenance work decisions. Through APMS, aircraft with below average fuel mileage are identified, the cause of fuel mileage degradation is identified, and appropriate corrective actions are determined. Fourth, APMS data is used to analyze the economic analysis of equipment installation investment. The cost can be easily calculated as the equipment installation cost, but the benefit is fuel efficiency improvement, and the only way to check this is the manufacturer's theory. Therefore, verifying the effect after installation and verifying the economic analysis is to secure the appropriateness of the investment. Through this, proper investment in fuel efficiency improvement equipment will be made, and fuel efficiency will be improved.

Optimization of Estimating Duration of the Structural Frame for the High-rise Apartment Housing during the Winter season -Focusing on One Cycle Time Scheduling Mechanism of the Typical Floor- (동절기 아파트 골조공사의 적정공기 산정에 관한 연구 - 기준층 사이클 공정분석을 중심으로 -)

  • Bang Jong-Dae;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.170-178
    • /
    • 2004
  • Public construction companies have strictly followed a rule that they should not work in the wet area such as structural frame for a certain period during the winter season. It is usually known that the non-working period during the winter causes increase of the project duration, and the project cost escalation. Also, it makes negative effects on national economy because it reduces workers income. Therefore, the site work for the structural frame should be performed even during the whiter season. But the site work for the structural frame during that period cannot proceeds in the same way as during other periods, and requires a different method for estimating project duration. Through an analysis of time scheduling mechanism, actual working days are obtained for 1 cycle of typical floors in the structural frame during these periods, and non-working days of 5 years average are calculated based on calendar day using data of 5 years weather forecasts for that season. This study proposes an optimized way of estimating project duration for 1 cycle of typical floors in the structural frame during these periods. This estimating method uses the combined actual working days and non-working days of 5 years' average, and the estimated results are confirmed by being compared with field data. This study is expected to be used in estimating the construction duration of the structural frame during the winter season.

THE STUDY ON THE DEVELOPMENT OF RELATIVE VALUE IN MEDICAL TREATMENT OF THE ORAL AND MAXILLOFACIAL SURGERY (구강악안면외과 의료행위 상대가치 개발에 대한 조사연구)

  • Song, Gin-Ah;Baek, Kyung-Won;Hwang, Jong-Min;Yu, Soon-Yong;Choi, Jin-Young
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.32 no.4
    • /
    • pp.334-347
    • /
    • 2006
  • The aim of this study is to evaluate the reasonableness of the medical fee on oral and maxillofacial surgery field according to surgeon's opinions and actual conditions. The medical fee has significant influence on hospital income, the supply and distribution of medical manpower, quality and facilities of medical services. Questionnaire survey was sent to 86 oral and maxillofacial surgeons who worked more than 3 years in general hospital. Among them, 25 doctors replied the 109 answers survey and the average of treatment time and physician work relative value on each category was calculated. And the health insurance cost (that has been applied since 2003) was compared with the questionnaire results. And finally we investigated items that health insurance system did not include in oral and maxillofacial field but actually performed in oral and maxillofacial surgery clinic. The result was that the medical fee did not properly reflect physician work relative value of actual treatments. In case of complicated extraction, work relative value needed 3.5 times enhancement of present value. For simple impacted tooth extraction 1.8 times, for impacted tooth extraction including odontomy 1.7 times, and for fully impacted tooth more than 2/3 of it located into the alveolar bone, 1.8 times enhancement needed. In respect of the present physician work relative value, hemimandibulectomy with neck lymph node dissection for the malignancy is appropriated as 3.3 times of open reduction and internal fixation for the mandibular fracture, but the questionnaire result showed 25 times discrepancy. In conclusion, this research shows the need for intervention that health insurance included items and legal relative medical value must act in union with treatment in clinic to reduce the imbalance between them.

The Optimization Experience of Occupational Exposure during Unclear Power Plant Outage (원자력발전소 계획예방정비 기간중 피폭최적화 경험)

  • Song, Young-Il;Kim, Hyung-Jin;Park, Hun-Kook;Kim, Hee-Geun
    • Journal of Radiation Protection and Research
    • /
    • v.28 no.2
    • /
    • pp.145-154
    • /
    • 2003
  • By optimizing the radiation protection the collective dose and individual dose could be reduced during YGN #4 $5^{th}$ outage in 2001. The collective doses for the two high radiation jobs decreased to 85% and 65% of expected doses. The proportion of workers with low dose (below 1mSv) exposure increased 4% while the proportion of workers with over 3mSv and 5mSv exposure are decreased to 2%, 1% respectively. But none is exposed over 8mSv for the annual dose. To aid decision of utilizing the robot, cost- benefit analysis was performed and reasonable point was proposed to use the robot. For the first time job, repeated ALARA meeting and mock up training were implemented to set up working procedure by identifying the trouble. To easily set up standard procedure, mockup process was videotaped and reviewed during ALARA meeting. Monitoring is a good approach to chase radiological working condition such as working time, dose rate. behavior of workers, especially for high radiation work. Those data were estimated and adjusted from the stage of work planning to mock up. At the stage of actual work the monitoring data were compared to the estimation and recorded to database. This database will not only be used as a powerful tool for dose optimization at the following outage but also as a guideline to dose constraint set up for optimization for each specific situation.

Proposal of Maintenance Scenario and Feasibility Analysis of Bridge Inspection using Bayesian Approach (베이지안 기법을 이용한 교량 점검 타당성 분석 및 유지관리 시나리오 제안)

  • Lee, Jin Hyuk;Lee, Kyung Yong;Ahn, Sang Mi;Kong, Jung Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.505-516
    • /
    • 2018
  • In order to establish an efficient bridge maintenance strategy, the future performance of a bridge must be estimated by considering the current performance, which allows more rational way of decision-making in the prediction model with higher accuracy. However, personnel-based existing maintenance may result in enormous maintenance costs since it is difficult for a bridge administrator to estimate the bridge performance exactly at a targeting management level, thereby disrupting a rational decision making for bridge maintenance. Therefore, in this work, we developed a representative performance prediction model for each bridge element considering uncertainty using domestic bridge inspection data, and proposed a bayesian updating method that can apply the developed model to actual maintenance bridge with higher accuracy. Also, the feasibility analysis based on calculation of maintenance cost for monitoring maintenance scenario case is performed to propose advantages of the Bayesian-updating-driven preventive maintenance in terms of the cost efficiency in contrast to the conventional periodic maintenance.

An Empirical Analysis on the Presumption of Public Apartment's Construction Cost in Housing Land Development Project (택지개발사업의 공공주택건설공사비 추정의 실증적 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.81-88
    • /
    • 2011
  • Providers haven't recently had a flexible construction cost estimation system to meet various needs of consumers about public housing. So the subject of this study is to estimate construction cost reasonably in early project stage of public housing and then develop reliable means which is able to support construction cost management and establish a adequate funding investment plan as a provider. In this study, Regression analysis was performed by the case on 20 public apartment complex which were designed from the first half of 2007 to the first half of 2008. A total construction cost of construction, civil engineering, machinery, elevator, land scape, electricity and communication work was used as one sample for increasing explanation and representativeness of the case. In addition, The total construction cost which is devided into design, contract and completion cost was variously analysed for increasing relevance of model and actual utilization. The result of estimation model based on a total construction cost set up completion and design cost showed that error rate is within 2%, which is a excellent result. The estimation model of the construction cost developed by this study is expected to estimate approximate construction cost which is adjacent real construction cost in early stage of the project by using some data.

Wear Comfort Evaluation on Water-vapor-permeable (WVP) Garments Using a Movable Sweating Thermal Manikin (발한써멀마네킨을 이용한 투습방수의류의 착용쾌적성 평가)

  • Kang, Inhyeng;Lee, Han Sup
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.37 no.8
    • /
    • pp.1095-1106
    • /
    • 2013
  • This study evaluated the wear comfort properties of water-vapor-permeable (WVP) garments using a movable sweating thermal manikin. Manikin tests were performed in a climatic chamber (temperature T=20, $35{\pm}0.5^{\circ}C$ and relative humidity $H=50{\pm}10%$) using seven sportswear outfits (a long sleeve shirts and a long pants) made with seven different WVP fabrics. Physiological responses of wear trials could be correlated with measurement parameters of the thermal manikin experiment; subsequently, a regression model that represented a final comfort sensation could be obtained. The regression model developed in this work is based on thermal manikin measurements; consequently, it provides an independent comfort sensation level in a relatively short time at a low cost while maintaining the reproducibility of results. It translates into more actual choices for sportswear manufacturers and sportswear consumers.

Development of the Standard Worksheet System for the Quality Risk Management of Apparel Products (패션의류제품의 품질 리스크 관리를 위한 표준작업지시서 시스템 개발)

  • 이원자;유지선
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.27 no.9_10
    • /
    • pp.1160-1171
    • /
    • 2003
  • This study is intended to examine the current situation and the problems of the "worksheets, regarding various factors that exert influences onto the quality-risk management, which is one of the most significant factors specifying an apparel product. This paper advances according to the following sequences: 1. Literature survey 2. Field research on actual "apparel vendors" and production factories 3. Investigating the requirements relating to the worksheet 4. Developing standard format of the worksheet 5. Effectiveness analysis on the standard worksheet 6. Proposal of an intelligent model applying standard worksheet system. This study is performed with the following research methods; those are questionnaire surveys, statistical analysis, interviews, collecting & analyzing worksheets, product sample quality experiment, functional analysis of the system, and materialization of the prototype system. The significance of this research is that it suggests the possible effective use of worksheet, which reflects the customers' needs in terms of the product quality, at the stage of the product planning process. Despite its importance, the current work structure does not visibly reflect these components. Therefore, with the result of this research, it is considered that the worksheet systems will meet more useful improvements in risk management process. The limitations of this research are as follows. Although it is evident that the standard worksheets bring effective results in quality improvements of products, considerations must be made onto some additional payoffs arising from the additional cost of necessary labor forces with expert knowledge and cost of the effort and time inputting correct information for running the system.

Productivity analysis using a Fleet Management System for Construction Equipment (건설장비 플릿관리 시스템 적용시 생산성 분석)

  • Lim, So-Young;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.1
    • /
    • pp.87-95
    • /
    • 2020
  • With the advent of the 4th industrial revolution and the combination of IoT, there have been diverse domestic and foreign researches for the development of construction industry. Especially, in the large-scale earthwork site where many and various construction equipments are put into, the control system between construction equipments is important for the increase of productivity. Thus, after developing the fleet management system for the optimum operation of construction equipments, the problems were checked and improved for each step in the process of application at site. In order to verify the site application process of the fleet management system for the optimum operation of construction equipments, the analysis on the productivity was performed by inputting the data used for the actual site and the site data using this system and then comparing the data through simulation. The analysis was limited to excavator and dump. In the results of the analysis, the rate of work per hour was increased to the range of 4 % while the cost price was decreased to 4 %. Even though the results of the analysis could be different depending on the site applied, the results showing the increase of workload of equipments and the decrease of cost price in the complex project at earthwork site verify the increase of productivity.