건설업 안전관리 효과분석에 관한 실증적 연구 (An Analysis of Safety Control Effectiveness in Construction)

  • 갈원모;손기상;채준석
    • 한국안전학회지
    • /
    • 제11권1호
    • /
    • pp.121-128
    • /
    • 1996
  • Estimating the cost of injuries and "accidents" to an organization is very important to figure out about how much well each organization has run his company and how much efficiently he has got the results using a certain amount of the expense for safety. Despite the potential usefulness to management of information as to the cost of a company's "accidents", it is not customary accounting practice to make these data available. Of the two general kinds of costs forced on a company by its occupational injuries and "accidents", the insurance cost and uninsured cost, -the former is by far the easier to find out. But actually, this uninsured cost should be figured out at each company. Authors have designed the generalized model to figure out the above problem costs to establish its efficient safety control. One construction company has been a pilot for this study. It is found that efficient safety control cost should be 1.2%~l.3% of total selling amount by analyzing actual data for three years.g actual data for three years.

  • PDF

실적공사비 분석을 통한 유통시설물의 적정공사비 추정에 관한 연구 (A Study on the Presumption of Proper Construction Cost of Distribution Facilities by Analyzing Actual Construction Cost)

  • 고성석;김현식;이현철
    • 한국건설관리학회논문집
    • /
    • 제9권3호
    • /
    • pp.108-117
    • /
    • 2008
  • 최근 유통시설물 공사의 증가와 함께 발주처와 시공사간의 불확실성 요인에 따른 공사비 계약 및 정산방식에 있어서 분쟁의 소지가 많이 제기되고 있다. 이에 초기 착공 시 공사비에 대한 명확한 검증기준이 마련되어야 하며, 저가 공사수주로 인한 공기지연, 품질저하 등을 미연에 예방할 수 있는 적정공사비 추정이 가능해야 할 것이다. 이와 같은 관점에서 본 연구에서는 대형 유통시설물의 공사비 예측을 통한 초기 투자비 분석 및 공사 진행시 발주자와 시공사간의 원만한 공사 진행을 위해 국내 유통시설물 관련 15개 현장의 실적공사비를 조사 분석하여 공법 및 공간, 면적별 적정공사비를 산출하였으며, 이를 근거로 신규 프로젝트 진행시 초기 기획 설계단계에서 부터 타당성 조사를 위한 예측공사비 분석을 통하여 유통시설물 사업의 적정성 여부를 결정하는 수단으로 활용될 수 있는 자료를 제시하고자 하였다.

실적공사비적산제도 도입에 따른 도급금액 변동 분석 (An Analysis of Differences between Contract Costs Estimated by the Actual-Cost-Data-based Method and the Quantity-based Method)

  • 박창배;김동영;김주형
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.510-514
    • /
    • 2004
  • 본 연구는 실적공사비적산제도의 과도기적 문제점 분석과 이의 개선방안에 관한 연구의 기초 단계로 수행되었다. 이를 위해 원가 계산 방식과 실적 공사비 방식의 정의 및 구조를 알아본 후 세 개의 프로젝트를 대상으로 양 방식을 적용해 도급금액 내역서를 작성해 보았다. 이와 함께 현재 실재로 실적공사비 적산제도를 활용해 도급금액을 산정하고 있는 한국 S공사의 두 개의 프로젝트를 대상으로 공사측에서 제시한 금액과 원가견적방식으로 산출된 금액을 비교하였다. 이를 통해 실적공사비적산제도로 공사를 발주했을 경우 현재 방식과 비교해 도급금액이 어느 부문에서 어느 정도 변하는 가를 파악하였다.

  • PDF

골프장 공사의 실적공사비에 의한 개산견적모델 개발 (The Development of Factor Model Based on Actual Work Cost for Golf Courses)

  • 박종혁;박홍태;전용배
    • 한국산학기술학회논문지
    • /
    • 제11권2호
    • /
    • pp.620-627
    • /
    • 2010
  • 본 연구는 공사조건이 유사한 특정지역의 골프장 건설공사에 대해 실적공사자료를 공사규모와 시간을 고려하여 공사비를 예측하는 식을 토대로 초기계획단계에서 골프장건설 공사비를 예측하기 위한 기초자료를 제시하였다. 즉, 골프장 건설공사를 하는데 실제 투입된 실적공사자료들을 비교.분석하고 건설공사비지수를 고려하여 골프장 건설공사의 초기계획단계에서 건설공사비를 추정할 수 있는 공사비 예측식을 제안하였다. 연구의 결과, 8개의 골프장자료를 이용하여 회귀분석으로 골프장 공사비예측을 위한 비용-규모 지수 n을 구한 결과, 총공사비 0.72, 순공사비 0.67로 도출되었다.

실적 공사비에 의한 예정공사비 산정 전산화 방안 (A Computerized Construction Cost Estimating Method based on the Actual Cost Data)

  • 전재열;조재호;박상준
    • 한국건설관리학회논문집
    • /
    • 제2권2호
    • /
    • pp.90-97
    • /
    • 2001
  • 공공기관에서 발주하는 건설공사의 계약에 있어서 가장 중요한 것은 합리적인 방법으로 결정된 적정한 예정가격을 기준으로 계약을 체결하는 것이다. 적정예정가격을 산정하기 위해서는 먼저 기수행한 실적공사비를 근간으로 하여 건설공사의 다양성과 불확실성을 반영할 수 있는 비용자료의 축적이 선결과제라 할 수 있다. 따라서 본 연구는 실적공사비적산방식에 따라 과거의 가장 유사한 실적자료에 기초한 확률적 비용개념을 도입하여 실적공사비 데이터 베이스 구축 모형과 이를 통한 예정공사비 산정방법 및 전산화 방안을 제시하고자 한다.

  • PDF

시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석 (Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction)

  • 하기주;최민권;이동렬;하민수;하재훈;김외곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

PROBABILISTIC MEASUREMENT OF RISK ASSOCIATED WITH INITIAL COST ESTIMATES

  • Seokyon Hwang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.488-493
    • /
    • 2013
  • Accurate initial cost estimates are essential to effective management of construction projects where many decisions are made in the course of project management by referencing the estimates. In practice, the initial estimates are frequently derived from historical actual cost data, for which standard distribution-based techniques are widely applied in the construction industry to account for risk associated with the estimates. This approach assumes the same probability distribution of estimate errors for any selected estimates. This assumption, however, is not always satisfied. In order to account for the probabilistic nature of estimate errors, an alternative method for measuring the risk associated with a selected initial estimate is developed by applying the Bayesian probability approach. An application example include demonstrates how the method is implemented. A hypothesis test is conducted to reveal the robustness of the Bayesian probability model. The method is envisioned to effectively complement cost estimating methods that are currently in use by providing benefits as follows: (1) it effectively accounts for the probabilistic nature of errors in estimates; (2) it is easy to implement by using historical estimates and actual costs that are readily available in most construction companies; and (3) it minimizes subjective judgment by using quantitative data only.

  • PDF

A Suggestion of Contingency Guidelines According to ISDC Based on Overseas Contingency Data

  • Minhee Kim;Chang-Lak Kim;Sanghwa Shin
    • 방사성폐기물학회지
    • /
    • 제20권4호
    • /
    • pp.541-550
    • /
    • 2022
  • When decommissioning nuclear power plant (NPP), the first task performed is cost estimation. This is an important task in terms of securing adequate decommissioning funds and managing the schedule. Therefore, many countries and institutions are conducting continuous research and also developing and using many programs for cost estimation. However, the cost estimated for decommissioning an NPP typically differs from the actual cost incurred in its decommissioning. This is caused by insufficient experience in decommissioning NPPs or lack of decommissioning cost data. This uncertainty in cost estimation can be in general compensated for by applying a contingency. However, reflecting an appropriate standard for the contingency is also difficult. Therefore, in this study, data analysis was conducted based on the contingency guideline suggested by each institution and the actual cost of decommissioning the NPP. Subsequently, TLG Service, Inc.'s process, which recently suggested specific decommissioning costs, was matched with ISDC (International Structure for Decommissioning Costing)'s work breakdown structure (WBS). Based on the matching result, the guideline for applying the contingency for ISDC's WBS Level 1 were presented. This study will be helpful in cost estimation by applying appropriate contingency guidelines in countries or institutions that have no experience in decommissioning NPPs.

공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법 (Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings)

  • 임진호;박준모;김옥규
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.415-422
    • /
    • 2014
  • 본 연구는 공공건축물의 실적공사비 분석을 통해 총공사비에 대한 적정보정율을 기초자료로 제시하고자 한다. 이에 대해 조달청에서 발주한 2009~2011년에 준공된 53개 프로젝트를 연구 대상으로 하였다. 공사비 분석은 주요 공정인 건축, 기계, 전기, 통신, 부대시설에 대하여 빈도론적 관점에서 중위수를 활용한 절대오차율을 기반으로 총공사비에 대해 비교 분석하였다. 이를 통해 적합회귀모형을 선정하고 보정율을 책정하였다.

시계열을 이용한 실적단가 예측방안에 관한 연구 (A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices)

  • 박원영;서종원;강상혁;최봉준
    • 한국건설관리학회논문집
    • /
    • 제10권4호
    • /
    • pp.50-57
    • /
    • 2009
  • 공공 건설사업의 계약에 있어 합리적이며 적정한 예정가격의 산정이 가장 중요한 요소라 할 수 있다. 공공 공사 예정가격 산정 근거로 사용되어 온 표준품셈과 더불어 실적공사비 제도를 단계적으로 확대 도입키로 했다. 본 논문에서는 과거에 낙찰되었던 계약단가 뿐 아니라 모든 입찰단가 자료를 활용하여 산출한 실적단가의 변동패턴을 분석하여 예측하는 일련의 절차 및 방법론을 제시하였다. 본 연구에서는 신뢰성 있는 자료 확보를 위해 저가입찰 등과 같은 전략적 입찰단가를 제거한 실적단가를 활용하여 시계열 자료를 구성하여 이 시계열을 웨이블릿 분석을 통해 변동 패턴과 추세를 파악하고 신경망을 이용하여 공사비를 예측하는 방안을 주요하게 다루고 있다. 건설 공사비는 매우 다양한 특성을 내포하고 있으므로 그 예측이 어려울 뿐만 아니라 그 오차 또한 매우 클 것으로 예상된다. 이에 본 연구에서는 웨이블릿 변환을 통하여 다양한 특성의 변동을 찾아내어 이를 예측에 이용함으로써 예측력을 높이고자 하였다. 다만 시계열이 매우 단기간의 자료로 구축되어 변동의 양상이 정확하게 분석될 수 없었으나 지속적으로 실적공사비 자료기 축적되어 장기간의 자료를 바탕으로 시계열이 구축된다면 향후 수행될 건설사업의 기획 시 개략적인 공사비 산출에 참고할수 있는 유용한 자료로 활용될수 있을 것이다.