Preliminary Study on the Construction of Database for BIM-based preliminary estimate. (BIM 기반 개산견적을 위한 DB구축 기초연구)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.291-292
    • /
    • 2012
  • Progress in the construction project, the estimated cost of the measure is very important. Use preliminary estimate cost data for the prediction of construction cost. But, preliminary estimate cost data a clear calculation, there is no way. it is rely on the historical data and the past construction data. As a result, a significant difference in the actual construction cost and the predicted cost of the problem occurs. In this study, taking advantage of BIM Cost Prediction for efficient and rapid preliminary estimate BIM for building database through the study preliminary estimate cost data.

  • PDF

A Computerized Construction Cost Estimating Method based on the Actual Cost Data (실적 공사비에 의한 예정공사비 산정 전산화 방안)

  • Chun Jae-Youl;Cho Jae-ho;Park Sang-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.90-97
    • /
    • 2001
  • The paper considers non-deterministic methods of analysing the risk exposure in a cost estimate. The method(referred to as the 'Monte Carlo simulation' method) interprets cost data indirectly, to generate a probability distribution for total costs from the deficient elemental experience cost distribution. The Monte Carlo method is popular method for incorporating uncertainty relative to parameter values in risk assessment modelling. Non-deterministic methods, they are here presented as possibly effective foundation on which to risk management in cost estimating. The objectives of this research is to develop a computerized algorithms to forecast the probabilistic total construction cost and the elemental work cost at the planning stage.

  • PDF

A Study of the Application for Proper Construction Cost Estimating Method based on the Actual Cost Data (실적자료에 의한 적정 건축공사비 산정 방법에 관한 사례연구)

  • Cho Jae-Ho;Park Sang-Jun;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-386
    • /
    • 2001
  • The ability to make good cost overruns predictions is a very important aspect of in major construction project. The probabilistic cost models can provide more reliable than traditional cost models which have been used in korea to prepare Bill of Quantities, if the actual cost data are sufficient enough to analyze the trends of the variables. The paper considers non-deterministic methods in a cost estimate. The method(referred to as the 'Monte Carlo simulation' method) interprets cost data indirectly, to generate a probability distribution for total costs from the deficient elemental experience cost distribution. The objectives of this research is to develop a method to forecast the probabilistic total construction cost and the elemental work cost

  • PDF

The Application of Actual Database for building construction - Focusing on Commercial building - (건축공사 공사실적자료 데이터베이스 활용방안 - 상업시설물을 중심으로 -)

  • Lee Sung-Ho;Kim Tae-Hui;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.428-433
    • /
    • 2001
  • Commercial buildings are the mostly common ones to be constructed along with residential buildings. After economic inflation, So-called 'IMF era', construction market has been running low because of stagnancy of business activities and cost escalation, Thus the construction industry needs a study of higher productivity by means of using information infrastructure. To deliver a database of commercial buildings construction record, their major management has carried out analysis for database components, in an attempt to meet users' needs. The scheme study of application presented cost and resource in construction lifecycle.

  • PDF

FEASIBILITY STUDIES FOR INFRASTRUCTURE CONSTRUCTION PROJECTS: HOW GOOD ARE THEY?

  • Khalied H. Hyari
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.820-829
    • /
    • 2007
  • This paper presents an evaluation of feasibility studies conducted to justify investments in infrastructure projects. An analysis of a previous feasibility study for a highway construction project is presented in this paper with an emphasis on the estimates and forecasts presented in that study in order to weigh expected benefits from the project against expected costs. The forecasted numbers are compared with actual data collected during the operation phase about the usage of the facility. The comparison reveals a huge difference between estimated numbers and actual numbers. Based on the lessons learned from the analyzed case study, recommendations are presented to improve feasibility studies for infrastructure projects including: peer review of feasibility studies; before-and-after feasibility studies; and defined scope and methodology for feasibility studies. Decision makers are advised to take outcomes of feasibility studies for infrastructure projects with extreme caution as some studies may provide erroneous and misleading input to their decisions regarding investment in infrastructure projects.

  • PDF

Revisions on the payline for overbreak in Tunnel

  • Park, T.;Ahn, B.;Baek, S.;Tae, Y.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.714-715
    • /
    • 2015
  • Drill and blast method has been most widely used in tunnel excavation, after NATM (New Austrian Tunneling Method) was introduced in 1983. The NATM method utilized mass of shotcrete to secure the bearing capacity of tunnels. Overbreak defined how much larger the actual excavation was than the planned. When it became larger, more shotcrete was required to fill in it Here, payline fixed allowable overbreak, referring to payable amounts of shotcrete. Since owner was not responsible for shotcrete exceeding payline, it was important to properly establish the standards for payline. Although the standards were provided in 'Poom-sam'(standardized quantity per unit), they did not properly reflect the actual conditions for excavation. Thus, this study reviewed existing domestic and foreign standards for overbreak, and estimated overbreak for each type of support using survey data, and finally provided the improvements on the current standards.

  • PDF

Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction - (공기산정 영향요인별 실적공기 비교분석 - 사무소 건축공사 공기산정기준을 중심으로 -)

  • Hwang Hyo-Sang;Kim Kyung-Rai;Suh Sang-Wook;Kim Chang-Duk;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.84-93
    • /
    • 2002
  • It is important to reduce construction duration in private sales and lease business for management of cash now in the owner's aspect. However, because the concept of standard duration hasn't been established in the domestic construction industry, it is difficult to present the standard of duration estimate. To solve this problem, this paper (1) grasped the effecting elements considered in the duration estimate through referring the existing literature related to the schedule management, (2) accomplished a comprehensive research on actual duration based on office buildings through the questionnaire survey and the expert interview, (3) presented the collected research data analyzed by effecting elements as standard duration, (4) compared standard duration with actual duration of countries advanced in construction projects as well as analyzed them, and then (5) raised the necessity of duration reduction in the domestic construction industry.

Process of Using BIM for Small-Scale Construction Projects - Focusing on the Steel-frame Work - (소규모 건축공사의 BIM 정보 활용을 위한 프로세스 제안 - 철골공사 중심으로 -)

  • Kim, Jin-Kwang;Yoo, Moo-Young;Ham, Nam-Hyuk;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.41-50
    • /
    • 2018
  • The current study focused on the utilization of building information modeling (BIM) data in steel-frame structures, which help to reduce project durations because they employ prefabricated structural members that are assembled on-site. In addition, a business process model was proposed using BIM data collected during the preconstruction, structural steel fabrication, and on-site construction phases of an actual steel-frame project. The ultimate expectation is that BIM data support at each phase, as well as the increased understanding among project participants, will result in an increase in project management productivity. The results from the current study are summarized as follows: To implement a BIM capable of application to steel-frame projects and data utilization, existing theories were studied to develop the construction project steps, both generally into the preconstruction (A1), steel fabrication (A2), and on-site construction phases, (A3) and specifically into 19 BIM-applicable phases. Based on the derived BIM-applicable phases, the model elements of the BIM object were identified, and the shortcomings of existing steel-frame projects were ameliorated, resulting in an improved data flow model. Moreover, for the proposed BIM data flow to progress efficiently, the BIM specialist needs to be well-acquainted with the phase-specific three-dimensional (3D) model output, and the infrastructure to construct an error-free 3D model must be provided. Based on the actual construction example, the BIM data utilized steel-frame projects - via production reports, clash checks, two-dimensional (2D) drawings, four-dimensional (4D) simulations, and 3D scanning - to make cooperation and communication among participants easier.

An Application Plan of Cost Information through Actual Date Information DB Construction (공사실적정보 DB구축을 통한 원가정보 활용방안)

  • Kim, Soung-Jik;Kim, Tae-Hui;Min, Kyung-Seok;Kim, Ok-Gyu;Kim, Chan-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.495-498
    • /
    • 2007
  • The latest parceling-out price upper limit ancestor memorial service enforcement, Sale in lots circle is elated interest of society each floor for construction working expenses by open etc. but private investment law for society basis facilities, because circle that is presenting in parceling-out price upper limit ancestor memorial service back is different system (configuration item), cross is expected. A lot of study results connected with cost control expense arbor in the mountains etc. were presented until present, but persistent DB expulsion prohibition. Cost information is standardization unpreparedness of system. It is real condition that is hoarded since research and development by practical use plan presentation unpreparedness etc. Therefore, in this study, desire does actual date use plan presentation by purpose through DB construction after process by information form of good quality so that can collects efficiently and manages and utilizes at construction production step flag firm' s results data which is achieved. Can utilize to data of tool development that maximize ultimately comprehension about employer' s business and business order ability through persuasion, and diverts in cost control business hereafter.

  • PDF

Estimating the Loss Ratio of Solar Photovoltaic Electricity Generation through Stochastic Analysis

  • Hong, Taehoon;Koo, Choongwan;Lee, Minhyun
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.3
    • /
    • pp.23-34
    • /
    • 2013
  • As climate change and environmental pollution become one of the biggest global issues today, new renewable energy, especially solar photovoltaic (PV) system, is getting great attention as a sustainable energy source. However, initial investment cost of PV system is considerable, and thus, it is crucial to predict electricity generation accurately before installation of the system. This study analyzes the loss ratio of solar photovoltaic electricity generation from the actual PV system monitoring data to predict electricity generation more accurately in advance. This study is carried out with the following five steps: (i) Data collection of actual electricity generation from PV system and the related information; (ii) Calculation of simulation-based electricity generation; (iii) Comparative analysis between actual electricity generation and simulation-based electricity generation based on the seasonality; (iv) Stochastic approach by defining probability distribution of loss ratio between actual electricity generation and simulation-based electricity generation ; and (v) Case study by conducting Monte-Carlo Simulation (MCS) based on the probability distribution function of loss ratio. The results of this study could be used (i) to estimate electricity generation from PV system more accurately before installation of the system, (ii) to establish the optimal maintenance strategy for the different application fields and the different season, and (iii) to conduct feasibility study on investment at the level of life cycle.