• Title/Summary/Keyword: Actual Construction Data

Search Result 726, Processing Time 0.032 seconds

Productivity management methodology development using Bayesian Approach (베이시안 접근법을 이용한 생산성 관리 방안 제시)

  • Ko, Yong-Ho;Lee, Tae-Hee;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.21-22
    • /
    • 2013
  • Construction industry has become higher, larger and more complicated. Construction projects demand precise planning and management prior and during actual operation. However, it has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly that usually results in unreliable results. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to suggest quantitative results. It has been analyzed that many studies have focused on limited data only and neglected suggesting an appropriate methodology for changing data applications. Therefore, this study suggests a methodology that effectively manages construction productivity by applying bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

A Basic Study on Analysis of the Impact of Building Shape on Safety Accidents (건물의 형상이 안전사고에 미치는 영향분석에 관한 기초연구)

  • Son, Seunghyun;Kim, Ji-Myung;Ahn, Sungjin;Han, Bumjin;Na, Youngju;Kim, Taehui
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.27-28
    • /
    • 2022
  • There is a limit to preventing various types of safety accidents in advance at construction sites. Even for buildings of the same total floor area, it is expected that the more complex the building shape or the higher the number of floors, the higher the probability of a safety accident. Therefore, it is necessary to analyze the effect of the shape of a building on safety accidents using safety accident data generated during actual construction. The purpose of this study is to analyze the impact of building shape on safety accidents. As a result, the R2 value of shape factor and safety accident was 0.901, and the R2 value of construction difficulty and safety accident was 0.944. In the future, the results of this study will be used as basic data for improving safety management related systems.

  • PDF

An analysis of the utilization of defect deposits for apartment complexes

  • Seo, Deok-Seok;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.549-556
    • /
    • 2013
  • This study analyzed the actual use of defect deposits for financing long-term expenses (that is, expenses incurred within 4-10 years of building completion) and for financing short-term expenses (that is, expenses incurred within 3 years of building completion). Therefore, 36 cost data on the expenses financed out of defect deposits for apartment complexes were collected from construction companies and analyzed using statistical methods. The findings revealed that 62.6 percent of defect deposits were spent to resolve actual defects, and 37.4 percent were spent resolving resident complaints. Furthermore, these results are valid regardless of the location of the complexes. As such, these results could be of significance when establishing or revising regulations regarding the repair of the long-term defects of apartment complexes.

Time and Cost Analysis for Highway Road Construction Project Using Artificial Neural Networks

  • Naik, M. Gopal;Radhika, V. Shiva Bala
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.26-31
    • /
    • 2015
  • Success of the construction companies is based on the successful completion of projects within the agreed cost and time limits. Artificial neural networks (ANN) have recently attracted much attention because of their ability to solve the qualitative and quantitative problems faced in the construction industry. For the estimation of cost and duration different ANN models were developed. The database consists of data collected from completed projects. The same data is normalised and used as inputs and targets for developing ANN models. The models are trained, tested and validated using MATLAB R2013a Software. The results obtained are the ANN predicted outputs which are compared with the actual data, from which deviation is calculated. For this purpose, two successfully completed highway road projects are considered. The Nftool (Neural network fitting tool) and Nntool (Neural network/ Data Manager) approaches are used in this study. Using Nftool with trainlm as training function and Nntool with trainbr as the training function, both the Projects A and B have been carried out. Statistical analysis is carried out for the developed models. The application of neural networks when forming a preliminary estimate, would reduce the time and cost of data processing. It helps the contractor to take the decision much easier.

3D Spatial Information Acquisition for Construction Operation and Maintenance on a Construction Site (효율적인 건설공사와 유지관리를 위한 건설현장에서의 3차원 공간 정보 획득)

  • Kim, Chang-Wan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.188-193
    • /
    • 2004
  • 3D spatial-modeling can be used in various safety-enhancement applications and for as-built data acquisition in project-control systems. The objective of the research reported herein was to provide spatial-modeling methods that represent construction sites in an efficient manner and to validate the proposed methods by testing them in an actual construction environment. Algorithms to construct construction-site scenes and to carry out coordinate transformations in order to merge data from different acquisition locations are presented. Field experiments were conducted to establish performance parameters and validation for the proposed methods and models. Initial experimental work has demonstrated the feasibility of this approach.

  • PDF

A Plan of Project Information Management through Analysis of Drafting Process for Transportation Planning (양중계획입안 프로세스의 구조화를 통한 프로젝트 정보관리 방안)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.101-109
    • /
    • 2008
  • As the number of high-rise building construction projects grows up, the subject of the transportation planning has become one of the grave issue. however important decision making are made by the experience of the a planner without the rational plans for information sharing. therefore, the purpose of this study is to suggest a plan of prefect information management not only for describing drafting process for transportation planning but also for systematizing information used in the procurement, transportation and construction phase to achieve these objectives, this study 1)analyzes the prior theory about transportation planning, 2)performs a case study of actual project to embody the problems of site management by analyzing the results of interviewing experts. In conclusion, the following factors are systematized : 1)the structure of drafting process for transportation planning, 2)the contents of information used in the procurement, transportation and construction phase, 3)the actual condition of code breakdown structure in transportation Planning phase. It is anticipated that the proposed methodology would be able to improve information management among the related engineers and accumulated data that might be used in similar construction projects in Korea.

Comparative Review on Term of Warranty Liability of Reinforced Concrete Work through Occurred Defect Data Analysis in Apartment Building (공동주택 하자실적자료 분석을 통한 철근콘크리트 공사의 하자담보책임기간 비교연구)

  • Seo, Deok-Seok;Park, Jun-Mo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.266-267
    • /
    • 2017
  • As apartment buildings defect lawsuits become socioeconomic problems, an objective basis system for the term of warranty liability of reinforced concrete constructions is urgent. This study was carried out as a basic study for developing a basis system for the term of warranty liability. To do this, defect data actual collected in apartment complexes were collected and analyzed. As the result of checking the cumulative rate of defect occurrence in reinforced concrete construction by year, the point of time of reaching the 90% level was the 5th years, which was similar with the provision of the Apartment Building Management Act. However, the current Supreme Court precedent has decided that the term of warranty liability for the main structural parts in reinforced concrete construction shall be 10 years and the dispute is expected to continue in the future in the defect lawsuit.

  • PDF

The Development of Factor Model Based on Actual Work Cost for Golf Courses (골프장 공사의 실적공사비에 의한 개산견적모델 개발)

  • Park, Jong-Hyuk;Park, Hong-Tae;Jeon, Yong-Bae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.2
    • /
    • pp.620-627
    • /
    • 2010
  • This study for construction of golf courses is to present basic information and pattern of change of construction cost by looking at the capacity of construction, requiring time and other aspects. The propose of this study is to develop the model of brief cost expected by using cost index and analyzing the actual work cost data gathered in golf course construction industry in Korea. The equation used for the cost-capacity index in other to deliver the expected construction cost is followed next. The results of this study, by regression analysis for the information of 7 golf courses, it could be found the cost-capacity index n, such as 0.72 for whole construction, 0.67 for net construction.

Case Study on the Cost Estimation standard for Smart Construction - Focused on Japan (스마트건설 공사비산정기준 사례조사 연구 - 일본사례를 중심으로 -)

  • Song, Tae-Seok;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.171-172
    • /
    • 2020
  • Recently, the need for smart construction technologies related to the Fourth Industrial Revolution has been increasing in order to improve productivity of the construction industry. The Ministry of Land, Infrastructure and Transport has established Smart construction technology road map to commercialize the smart construction, and research and development is also underway. However, due to the lack of cost estimation standards for such smart construction technologies to be deployed to actual sites, smart construction technologies are not actively applied to construction sites. In particular, cost estimation standards are needed for construction machinery equipment with ICT technology that is currently available for commercialization. Therefore, as a preliminary study for the development of smart construction cost estimation standards, a case study was conducted on ICT construction estimation standards in Japan and present them as basic data for standards in Korea.

  • PDF

A Study on Establishment of the Standard Sizes for Hanbok - For 18~26 year old women - (한복의 표준 치수 설정을 위한 연구 -18~26세 여성을 중심으로-)

  • 박현정;이순원
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.18 no.1
    • /
    • pp.91-100
    • /
    • 1994
  • The purpose of the study is to investigate the actual conditions of ready-to-wear Hanbok and is to establish the standard sizes for the women's ready-to-wear Hanbok. Twelve ready-to-wear Hanbok shops were investigated for the actual survey. Body measurements were taken from May to June, 1990 from 329 female college students living in the Seoul and Buchon. The ages of the subjects were 18"26. Thirty seven measurements were taken from each subject and analized for the results. Data were analized by factor analysis, and regression analysis. The results were as follows ; 1. As a result of the actual survey, the situation of the quality label was not enough. The size classification was not unified, and was not trusted statistically, it cannot satisfied consumers. 2. Factor analysis identified the two dimensions of body measurements 1 one was relevant to the height measurements including stature and to the length measurements of limbs, and the other was relevant to the trunk girth measurements and the limbs girth measurements. 3. because of plane construction of Hanbok, employed in this thesis was bl-dimensional sizing system using two controle dimensions including height factor(stature) and girth factor(bust girth) . 4. The Multiple regression formula was developed for estimating secondary dimensions of Hanbok Construction, in which stature and bust girth were posited as independent variables. 5. As a results, about 88.6371 of expected distribution were covered by 9 sizes, which were used as the basis for defining sizing system for Hanbok construction.tion.

  • PDF