• Title/Summary/Keyword: Activity Cost

Search Result 941, Processing Time 0.033 seconds

Dental implant cost estimation using the Activity-Based Costing approach (활동기준원가(Activity Based Cost)를 적용한 치과 임플란트 원가산정)

  • Shin, Ho-Sung;Ahn, Eun-Suk
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.51 no.4
    • /
    • pp.292-299
    • /
    • 2013
  • Purpose: There is a growing concern for the cost management of medical institutions. The purpose of this study was to estimate Activity-Based Costing (ABC) for dental implant cost. ABC refers to allocating resources or cost based on the activities of services. Materials and methods: A dental institution located in the metropolitan area was selected in this study. The tax accounting data of the institution were utilized to confirm total cost, and the institution was asked to make out clinical activities to figure out what activities were carried out. The direct cost and indirect cost for dental implant were separately estimated, and cost driver was analyzed to estimate the indirect cost accurately. Results: The rates of the direct and indirect cost respectively stood at 35.8 and 49.5 percent. The cost for a dental implant was found to be approximately 1,579 won, and the cost of prosthetic surgery and treatment that included implant surgery accounted for the largest portion of the cost, which was 470 thousand won (30%). And the weight of training and education on dentistry was relatively higher than that of the other kinds of treatment. Conclusion: In order to ensure accurate and scientific costing for dental implant, not only direct medical procedure but every pre- and post-procedure activity should fully be taken into account. Pre-activities, post-activities, education and training are included in the indirect cost, but all these activities are mandatory and associated with the quality of treatment and the satisfaction level of patients.

ASSESSMENT OF ACTIVITY-BASED PYROPROCESS COSTS FOR AN ENGINEERING-SCALE FACILITY IN KOREA

  • KIM, SUNGKI;KO, WONIL;BANG, SUNGSIG
    • Nuclear Engineering and Technology
    • /
    • v.47 no.7
    • /
    • pp.849-858
    • /
    • 2015
  • This study set the pyroprocess facility at an engineering scale as a cost object, and presented the cost consumed during the unit processes of the pyroprocess. For the cost calculation, the activity based costing (ABC) method was used instead of the engineering cost estimation method, which calculates the cost based on the conceptual design of the pyroprocess facility. The calculation results demonstrate that the pyroprocess facility's unit process cost is $194/kgHM for pretreatment, $298/kgHM for electrochemical reduction, $226/kgHM for electrorefining, and $299/kgHM for electrowinning. An analysis demonstrated that the share of each unit process cost among the total pyroprocess cost is as follows: 19% for pretreatment, 29% for electrochemical reduction, 22% for electrorefining, and 30% for electrowinning. The total unit cost of the pyroprocess was calculated at $1,017/kgHM. In the end, electrochemical reduction and the electrowinning process took up most of the cost, and the individual costs for these two processes was found to be similar. This is because significant raw material cost is required for the electrochemical reduction process, which uses platinum as an anode electrode. In addition, significant raw material costs are required, such as for $Li_3PO_4$, which is used a lot during the salt purification process.

The Problem of the Quality of the Predecessor Activity on the Time and Cost of the Successor Activity in the Project Schedule - Project Schedule with Resource Constraints - (프로젝트 일정에서 선행활동 품질이 후행활동의 시간과 비용에 미치는 문제 - 자원제약이 존재하는 프로젝트 일정문제 -)

  • Kim, Gab Sik;Bae, Byeong Man;Ahn, Tae Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.50 no.2
    • /
    • pp.265-286
    • /
    • 2022
  • Purpose: The time and cost of a project activity exists in a selected mode and there is a quality level for the selected mode, and the time and cost of the current activity is determined by the quality level of the preceding activity. When an activity is a predecessor activity of an activity, it is characterized as a trade-off problem in which the time and cost of the activity are determined according to the quality level of the activity. Methods: A neighbor search heuristic algorithm obtains a solution by (1) randomly determining the mode, quality level, and assignment order for each activity. (2) get a solution by improving the solution by changing the possible modes and quality levels; (3) to find a solution by improving the solution from the point where it is feasible to advance the start time. Here, Case[1] is a method to find the optimal solution value after repeating (1). Case [2] is a method for finding a solution including (1) and (2). Case [3] refers to a method for finding solutions including (1), (2), and (3). Results: It can be seen that the value of the objective function presented by the algorithm changes depending on how the model of the heuristic algorithm is designed and applied. In other words, it suggests the importance of algorithm design and proves the importance of the quality problem of activities in the project schedule. Conclusion: A study significance of the optimization algorithm and the heuristic algorithm was applied to the effect of the quality of the preceding activity on the duration and cost of itself and the succeeding activity, which was not addressed in the project schedule problem.

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF

Development and Application of Cost Management Program for Visiting Nursing Centers Using Time-Driven Activity-Based Costing (시간동인 활동기준원가계산 기반 재가 방문간호센터 원가관리프로그램 개발 및 적용)

  • Kim, Juhang;Lim, Ji Young
    • Journal of Korean Academy of Nursing
    • /
    • v.49 no.5
    • /
    • pp.586-600
    • /
    • 2019
  • Purpose: This study aimed to develop a web-based cost management program for visiting nursing centers (CMP-VNC), using time-driven activity-based costing (TD-ABC), and to analyze effects of the program. Methods: The CMP-VNC was developed using the combined prototyping approach and system developing life cycle method following four stages: need analysis with comprehensive literature reviews and focus group interviews, design and development of program algorithm, evaluation of the developed program validity using experts and users group, and application and effects analysis. The non-equivalent control group pretest-posttest design was used to analyze the effects of the program. The program demonstration was conducted for four weeks with 60 visiting nurses in 35 visiting centers. Results: The web-based program was developed. It has five interfaces with basic and special functions using TD-ABC, namely, input, visiting nursing activity, visiting nursing activity cost, cost efficiency, and cost calculation report. The experimental group showed significantly higher cost perception and cost confidence than control group. Conclusion: We found that the CMP-VNC can be an effective tool to increase visiting nurses' competency of costing and enhance efficiencies of visiting nursing centers.

Analysis of Cost and Efficiency of a Medical Nursing Unit Using Time-Driven Activity-Based Costing (시간-동인활동기준원가계산(Time-Driven Activity-Based Costing)을 이용한 일 내과병동 간호단위 원가계산 및 효율성 분석)

  • Lim, Ji-Young;Kim, Mi-Ja;Park, Chang-Gi
    • Journal of Korean Academy of Nursing
    • /
    • v.41 no.4
    • /
    • pp.500-509
    • /
    • 2011
  • Purpose: Time-driven activity-based costing was applied to analyze the nursing activity cost and efficiency of a medical unit. Methods: Data were collected at a medical unit of a general hospital. Nursing activities were measured using a nursing activities inventory and classified as 6 domains using Easley-Storfjell Instrument. Descriptive statistics were used to identify general characteristics of the unit, nursing activities and activity time, and stochastic frontier model was adopted to estimate true activity time. Results: The average efficiency of the medical unit using theoretical resource capacity was 77%, however the efficiency using practical resource capacity was 96%. According to these results, the portion of non-added value time was estimated 23% and 4% each. The sums of total nursing activity costs were estimated 109,860,977 won in traditional activity-based costing and 84,427,126 won in time-driven activity-based costing. The difference in the two cost calculating methods was 25,433,851 won. Conclusion: These results indicate that the time-driven activity-based costing provides useful and more realistic information about the efficiency of unit operation compared to traditional activity-based costing. So time-driven activity-based costing is recommended as a performance evaluation framework for nursing departments based on cost management.

A study on the Structural Relationship among Innovation Activity, Innovation Performance, and Business Performance of Export Firms (수출기업의 혁신활동, 혁신성과, 경영성과 간의 구조적 관계에 관한 연구)

  • Yong-Hyun Cho
    • Korea Trade Review
    • /
    • v.46 no.5
    • /
    • pp.195-211
    • /
    • 2021
  • The purpose of this study is to examine the relationship among innovation activities, innovation performance, and management performance of export firms. I first undertake a review of previous studies related to innovation activity, innovation performance, and export firms' innovation. Based on this, I set up a research model and hypotheses. First, The innovation activity is classified into product innovation activity, process innovation activity, and administrative innovation activity. Innovation performance is divided into product quality improvement and cost reduction. And the business performance is regarded as financial performance of export's firms. This study examined whether innovation activity affect innovation performance such as product quality improvement and cost reduction. In addition, I examined whether these innovation performance affects business performance (financial performance). To achieve this, a total of 368 questionnaires are used in this study and PLS (Partial Least Square) was used to analyze structural equation. As a result, this study shows that product innovation activity have a positive effect on product quality improvement, and process innovation activity also have a positive effect on product quality improvement. However, it was found that neither product innovation activity nor process innovation activity had an effect on cost reduction. And it was found that administrative innovation did not affect product quality improvement, but had a positive effect on cost reduction. Also, it was found that quality improvement, which is an innovation performance, did not affect the financial performance of export's firms, and cost reduction, which is an innovation performance, had a positive effect on the financial performance of the export's firms.

Estimation of Home-visiting Care Costs for Low-income Elderly with Chronic Disease in a Metropolitan City Using the Severity Classification and ABC(active-based costing) (대도시 저소득층 만성질환 노인을 위한 가정.방문간호 원가산정 - 환자 중증도 및 활동기준원가계산법(ABC) 적용 -)

  • Kang, Sung-Ye
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.14 no.2
    • /
    • pp.118-130
    • /
    • 2008
  • Purpose: The purpose of this study was to estimate of home-visiting nursing costs for low-income elderly with chronic disease in a metropolitan city using the severity classification and ABC(active-based costing). Methods: First, the HHC activity pool was established. The performance time of each nursing activity were estimated. Second, nursing resources(labor costs, operating costs, and traffic expenses) were analyzed and nursing cost per minute was calculated. And then the cost of each activity was estimated. Third, 202 visiting cases were classified into three group by their severity. And then nursing cost per visit according to their severity was estimated. Results: 59 nursing activities were included in HHC activity pool. The average working time of 59 nursing activity was 6.7minutes and nursing cost per minute was 489 won. According severity, nursing cost per visit were in class I, 54,296 (won), class II 83,124(won), and class III 93,455(won).

  • PDF

The Relationships among the Degree of Quality Cost Deviation, Quality Management Activities and Performance (품질비용 발생편차와 품질관리활동 그리고 성과간의 관계:품질성과와 납기성과를 중심으로)

  • 김달곤;김순기;정순여
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.4
    • /
    • pp.1-18
    • /
    • 2003
  • Quality is a critical competitive factor in today's environment because of the impact of quality on costs and delivery. Many companies regard quality as a key concept of company strategy in order to achieve the competitive edge. Measuring and reporting quality cost is the first step in quality management program. The supposition of quality cost model is that investment in prevention activities will bring rewards from reduced failure costs, and that further investment in prevention activities will show profits from reduced appraisal costs. In this study, the degree of quality cost deviation is conceptualized. This means a deviation between the ideal and present ranking in the amounts of quality cost categories. This study analysed that the effect of its deviation on quality management activity and performance variables. However, there are no difference in these variables. The major reason is that most of companies are endeavoring for quality management but operating quality cost system unsystematically. The review against a prevention and appraisal activity is necessary.

Prediction/Investment Cost Analysis for korea High-Speed Railway System (한국형 고속전철 시스템의 추정/투입비용 분석)

  • Lee, Tae-Hyeong;Park, Chun-Su
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.60-64
    • /
    • 2003
  • In this study, we have analyzed the cost of korea high-speed railway system. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research & development activity in planning phase is relatively correct.

  • PDF