• Title/Summary/Keyword: Activity Cost

Search Result 950, Processing Time 0.027 seconds

The Effect of CEO's Network Activity on Business Performance through Corporate Competency (최고경영자 기업인 네트워크 활동이 기업역량을 매개로 경영성과에 미치는 영향)

  • Choi, Ae-Hee;Park, Jin-Ah;Kim, Yoon-Ho;Lee, Jae-Won
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.2
    • /
    • pp.188-199
    • /
    • 2018
  • The purpose of this study is to grasp the type of network activity and corporate competency based on network theory and to compare and analyze the relationship between these characteristics and business performance. The results showed that the frequency, importance, and reliability of CEO's had a positive (+) effect on business performance, and the mediating effect of corporate competency (industrial information competency, opportunity capture competency, strategic flexibility, and transaction cost reduction) appeared. This study tried to measure business performance by including corporate competency as a direct performance variable of CEO's network activity and found that it is desirable to focus on interacting with the most important network sources and to make efforts to strengthen the qualitative characteristics of network activities rather than expanding the scope of the network in order to improve the performance of CEO's Network Activity.

Bioproduction of trans-10,cis-12-Conjugated Linoleic Acid by a Highly Soluble and Conveniently Extracted Linoleic Acid Isomerase and an Extracellularly Expressed Lipase from Recombinant Escherichia coli Strains

  • Huang, Mengnan;Lu, Xinyao;Zong, Hong;Zhuge, Bin;Shen, Wei
    • Journal of Microbiology and Biotechnology
    • /
    • v.28 no.5
    • /
    • pp.739-747
    • /
    • 2018
  • The low solubility and high-cost recovery of Propionibacterium acnes polyunsaturated fatty acid isomerase (PAI) are key problems in the bioproduction of high value-added conjugated linoleic acid (CLA). To improve the solubility of recombinant PAI, six chaperone proteins were coexpressed with PAI. Introduction of GroELS proteins dramatically improved the PAI solubility from 29% to 97%, with increased activity by 57.8%. Combined expression of DnaKJ-GrpE and GroELS proteins increased the activity by 11.9%. In contrast, coexpression of DnaKJ-GrpE proteins significantly reduced the activity by 57.4%. Plasmids pTf16 harboring the tig gene and pG-Tf2 containing the tig and groEL-groES genes had no visible impact on PAI expression. The lytic protein E was then introduced into the recombinant Escherichia coli to develop a cell autolysis system. A 35% activity of total intracellular PAI was released from the cytoplasm by suspending the lysed cells in distilled water. The PAI recovery was further improved to 81% by optimizing the release conditions. The lipase from Rhizopus oryzae was also expressed in E. coli, with an extracellular activity of 110.9 U/ml. By using the free PAI and lipase as catalysts, a joint system was established for producing CLA from sunflower oil. Under the optimized conditions, the maximum titer of t-10,c-12-CLA reached 9.4 g/l. This work provides an effective and low-cost strategy to improve the solubility and recovery of the recombinant intracellular PAI for further large-scale production of CLA.

A Study on the Activities and Logistics Performance of SCM in Fashion Industry - Focused on the Supply Chain of Apparel Companies - (패션 산업의 SCM 활동수준과 물류성과에 관한 연구 - 어패럴업체의 공급 사슬을 중심으로-)

  • 홍인숙;김문숙
    • The Research Journal of the Costume Culture
    • /
    • v.12 no.4
    • /
    • pp.547-565
    • /
    • 2004
  • The purpose of this study was to evaluate the level of SCM activities and the logistics performance by SCM of the three company types in fashion industry· fabric suppliers, apparel manufacturers, and retailers. The level of SCM activities was estimated through the examination of seven factors: commitment and leadership of a top management, flexibility of management, understanding of demand characteristics, integrated management organization, information system, cooperative partnership and communication and exchange of opinion. The logistics performance was measured by improvement in customer service(on time delivery ratio of products, returning rate, treat ratio for A/S, order fill rate, substitute providing capability for being out of stock) and delivery cost reduction. Through questionnaire survey, a total of 214 data for 108 companies of three company types were collected: 46 for 40 fabric suppliers, 123 for 64 apparel manufacturers and 45 for 4 retailers. The analysis of SCM activity levels showed that fabric suppliers had higher degrees in the factor of understanding of demand characteristics, and apparel manufacturers had higher degrees in the factor of information systems. For retailers, the factor of communication and exchange of opinion represented higher degrees. The study on relationship between the SCM activity levels and logistics performance showed that the SCM activity factor of understanding of demand characteristics greatly improved a substitute providing capability for being out of stock in fabric suppliers, and information system improved a substitute providing capability for being out of stock, on time delivery ratio of products and order fill rate in apparel manufacturers. In retailers, the SCM activity factor of understanding of demand characteristics decreased returning rate highly and improved on time delivery ratio of products. The study results showed that SCM activities in fashion industry brought more improvement in customer service levels rather than in delivery cost reduction.

  • PDF

On-site Inventory Management Plan for Construction Materials Considering Activity Float Time and Size of a Stock Yard (공정별 여유시간과 야적장 규모를 고려한 건설자재의 현장 재고관리 방안 연구)

  • Kim, Yong Hwan;Yoon, Hyeong Seok;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.79-89
    • /
    • 2023
  • The inventory of many materials requires a large storage space, and the longer the storage period, the higher the potential maintenance cost. When materials are stored on a construction site, there are also concerns about safety due to the reduction of room for movement and working. On the other hand, construction sites that do not store materials have insufficient inventory, making it difficult to respond to demands such as sudden design changes. Ordering materials is then subject to delays and extra costs. Although securing an appropriate amount of inventory is important, in many cases, material management on a construction site depends on the experience of the site manager, so a reasonable material inventory management plan that reflects the construction conditions of a site is required. This study proposes an economical material management method by reflecting variables such as the status of the preceding and following activities, site size, material delivery cost, timing of an order, and quantity of orders. To this end, we set the appropriate inventory amount while adjusting related activities in the activity network, using float time for each activity, the size of the yard, and the order quantity as the main variables, and applied a genetic algorithm to this process to suggest the optimal order timing and order quantity. The material delivery cost derived from the results is set as a fitness index and the efficiency of inventory management was verified through a case application.

Cost-Analysis for Social Services: A Case Study of Community-Based Social Service Centers for the Disabled in South Korea (사회복지서비스 원가분석의 방법과 과제: 장애인복지관의 사례를 중심으로)

  • Choi, Jae-Sung;Choi, Sang-Mi
    • Korean Journal of Social Welfare
    • /
    • v.60 no.1
    • /
    • pp.233-250
    • /
    • 2008
  • The purpose of this study is to report a case of cost analysis for community-based social service centers for the disabled. This study analyzed 2002 accounting reports and annual business reports from 20 social service centers for the disabled. To identify weight of each service researchers surveyed each service in terms of significance, difficulty, and emphasis from managers among centers. For cost analysis, this study used TCA(Traditional cost accounting), rather than ABC(Activity-based costing) because of costs, time, and difficulty to find cost drivers. Findings indicate that average annual expenditure is about 1260 million Won. About 65.8% is for labor and another 13.2% is for programs. In addition, the cost for respite care service(1 hour basis) is 26,922 Won and job counselling with job capacity evaluation(2 hour basis) is 143,355 Won. These costs does not count on real estate costs and low labor costs. Thus, market price of those services should be higher than the above. This study analyzed the costs with service bassis rather than costing item basis. This method would provide more useful information to decision makers in relation to program expansion, reducement, and resources allocation etc.

  • PDF

CASH FLOW FORECASTING IN CONSTRUCTION PROJECT (건설공사에서의 현금흐름 예측)

  • Park Hyung-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.35-41
    • /
    • 2002
  • This research introduces the development of a project-level cash flow forecasting model in construction stage based on the planned earned value and the cost from a general contractors view on a jobsite. Most previous models have been developed to assist contractors in their pre-tendering or planning stage cash flow forecasts. The critical key to cash flow forecasting at the project level is how to build a cash-out model. The basic concept is to use moving weights of cost categories in a budget over project duration. The cost categories are classified to compile resources with almost the same time lags that are based on contracting payment conditions and credit times given by suppliers or venders. For cash-in, net planned monthly-earned values are simply transferred to the cash-in forecast, to be applied there with billing time and retention money. Validation of the model involves applying data from on-going 4 projects in progress for 12 months. Based on the results of the comparative analyses through the simulation of the proposed model and the existing models, the proposed model is more accurate, flexible and simpler than traditional models to the employee of construction jobsite who is not oriented financial knowledge.

  • PDF

Comparative Analysis on the Characteristics of High Cost Medical Users between the Health Insurance and Medical Assistance Program (고액진료비 환자의 특성 비교분석 - 의료보험과 의료보호환자를 중심으로 -)

  • Kang, Sunny;Moon, Ok-Ryun
    • Quality Improvement in Health Care
    • /
    • v.2 no.2
    • /
    • pp.112-129
    • /
    • 1996
  • Background : A small number of high cost patients usually spend a larger proportion of scarce health resources. Aged, long-term care and readmitted patients usually belong to these high cost patient group. Among others, long length of stay and readmission can be reduced by checking its cause, and these are the areas needed most of quality improvement activity. Characteristics of high cost medical users between health insurance program and medical assistance program were reviewed. Methods : The inpatient claims of health insurance and medical assistance program were analyzed. Patients were divided by 6 groups; long-term, mid-term, short-term, readmitted, cancer and aged. We defined high cost patients as those who had spent one and half million won and over per 6 months. Characteristics of high cost patients for each group were reviewed. Results : medical assistance patients used much more resources than the insured members in the average hospital cost per case but less in daily hospital cost. The former had a longer length of stay and had much heavier diseases. Major diseases of both group were cancer, diseases of circulatory system and chronic degenerative diseases. Gallstone and schizophrenia were more in the insured program. However, pulmonary tuberculosis, asthma were more common among the medical assistance patients. Early readmission before 2 weeks were 28-30% of the total readmission. Readmission rate in the malignat neoplasm and renal failure were 80% and more. Q.A program should be installed to prevent unnecessary readmissions. Conclusion : Almost 30% of early readmissions and admissions due to complications and long length of stay should be reviewed carefully to keep cost down and to enhance the quality of hospital care.

  • PDF

Direct Costs of Cervical Cancer Management in Morocco

  • Berraho, Mohamed;Najdi, Adil;Mathoulin-Pelissier, Simone;Salamon, Roger;Nejjari, Chakib
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.13 no.7
    • /
    • pp.3159-3163
    • /
    • 2012
  • Background: For cervical cancer the epidemiological profile is poorly known in Morocco and no data is available concerning the direct medical costs. The purpose of this work is to estimate the direct cost of medical management of invasive cervical cancer during the first year after diagnosis in Morocco. Methods: The estimation of direct costs of medical management of invasive cervical cancer during the first year after diagnosis in Morocco is based on the estimation of individual cost in each stage which covers diagnosis, treatment and follow-up during first year. The cost was estimated per patient and whole cycle-set using the costs for each drug and procedure as indicated by the Moroccan National Agency for Health Insurance. Extrapolation of the results to the whole country was used to calculate the total annual cost of cervical cancer treatments in Morocco. Results: Overall approximately 1,978 new cases of cervical cancer occur each year in Morocco. The majority (82.96%) of these cases were diagnosed at a late stage (stageII or more). The cost of one case of cervical cancer depends on stage of diagnosis, the lowest cost is $382 for stageCis followed by the cost of stageIA1 for young women (< 40 years) which is $2,952. The highest cost is for stageIV, which is $7,827. The total cost of cervical cancer care for one year after diagnosis is estimated at $13,589,360. The share allocated to treatment is the most important part of the global care budget with an annual sum of $13,027,609 whereas other cost components are represented as follows: $435,694 for annual follow-up activity and $126,057 for diagnosis and preclinical staging. Conclusion: This study provides health decision-makers with a first estimate of costs and the opportunity to achieve the optimal use of available data to estimate the needs of health facilities in Morocco.

Identification of Primary Activity and Management Plan for Construction Standard Unit Price (건설공사 표준시장단가 핵심공종 도출 및 중점관리방안)

  • Jin, Zheng-Xun;Baek, Seung-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.589-601
    • /
    • 2020
  • The Construction Standard Unit Price (CSUP) sets the standard for calculating the estimated construction cost. The CSUP is used as basic data for preparing a standard price for public construction. Currently, the CSUP is calculated in consideration of the market and construction field conditions. However, a long-term management plan was established to prepare revised standards. As part of the plan, a field survey was conducted on changes in construction conditions and market prices. However, the plan continued for more than 5 years. Thus, the plan has a problem of difficulty continuously managing primary activities that have high importance and high price volatility. Therefore, to efficiently manage the CSUP, this study identifies the primary activities of the CSUP and presents a management plan. Through importance analysis and unit price volatility analysis, 242 primary activities in 35 activity groups were identified. Also, a management plan is presented based on the importance levels of activities. The primary activities and management plan could enable the timely revision of important activities. The results of this study provide a base for reflecting the appropriateness of construction cost criteria on time.

Development of Integrated System of Time-Driven Activity-Based Costing(TDABC) Using Balanced Scorecard(BSC) and Economic Value Added(EVA) (BSC와 EVA를 이용한 TDABC 통합시스템의 개발)

  • Choi, Sungwoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.451-469
    • /
    • 2014
  • The purpose of this study is to implement and develop the integrated Economic Value Added (EVA) and Time-Driven Activity-Based Costing (TDABC) model to seek both improvement of Net Operating Profit Less Adjusted Tax (NOPLAT) and reduction of Capital Charge (CC). Net Operating Profit Less Adjusted Tax (NOPLAT) can be maximized by reducing the indirect cost of an unused resource capacity increased by Cost Capacity Ratio (CCR) of TDABC. On the other hand, Capital Charge (CC) can be minimized by improving the efficiency of Invested Capital (IC) considered by Weighted Average Cost of Capital (WACC) of EVA. In addition, the integrated system of TDABC using Balance Scorecard (BSC) and EVA is developed by linking between the lagging indicators and the three leading indicators. The three leading indicators include customer, internal process and growth and learning perspectives whereas the lagging indicator includes NOPLAT and CC in terms of financial perspective. When the Critical Success Factor (CSF) of BSC is cascading as a cause and an effect relationship, time driver of TDABC and capital driver of EVA can be used efficiently as Key Performance Indicator (KPI) of BSC. For a better understanding of the proposed EVA/TDABC model and BSC/EVA/TDABC model, numerical examples are derived from this paper. From the proposed model, the time driver of TDABC and the capital driver of EVA are known to lessen indirect cost from comprehensive income statement when increasing the efficiency of operating IC from the statement of financial position with unified KPI cascading of aligned BSC CSFs.