A primary-pipe rupture accident is one of the design-basis accidents of a High-Temperature Gas-cooled Reactor (HTGR). When the primary-pipe rupture accident occurs, air is expected to enter the reactor core from the breach and oxidize in-core graphite structures. This paper describes an experiment and analysis of the air ingress phenomena and the method fur the prevention of air ingress into the reactor during the primary-pipe rupture accident. The numerical results are in good agreement with the experimental ones regarding the density of the gas mixture, the concentration of each gas species produced by the graphite oxidation reaction and the onset time of the natural circulation of air. A hydrogen production system connected to the High-Temperature Engineering Test Reactor (HTTR) Is being designed to be able to produce hydrogen by themo-chemical iodine-Sulfur process, using a nuclear heat of 10 MW supplied by the HTTR. The HTTR hydrogen production system is first connected to a nuclear reactor in the world; hence a permeation test of hydrogen isotopes through heat exchanger is carried out to obtain detailed data for safety review and development of analytical codes. This paper also describes an overview of the hydrogen permeation test and permeability of hydrogen and deuterium of Hastelloy XR.
Journal of Korean Society of Industrial and Systems Engineering
/
v.37
no.1
/
pp.26-32
/
2014
Mental fatigue is inevitable in the workplace. Since mental fatigue can lead to decreased efficiency and critical accidents, it is important to manage mental fatigue from the viewpoint of accident prevention. An experiment was performed to evaluate mental fatigue using the formant frequency analysis of human voices. The experimental task was to mentally add or subtract two one-digit numbers. After completing the tasks with four different levels of mental fatigue, subjects were asked to read Korean vowels and their voices were recorded. Five vowel sounds of "아", "어", "오", "우", and "이" from the voice recorded were then used to extract formant 1 frequency. Results of separate ANOVAs showed significant main effects of mental fatigue on formant 1 frequencies of all five vowels concerned. However, post-hoc comparisons revealed that formant 1 frequencies of "아" and "어" were most sensitive to mental fatigue level employed in this experiment. Formant 1 frequencies of "아" and "어" significantly decrease as the mental fatigue accumulates. The formant frequency extracted from human voice would be potentially applicable for detecting mental fatigue induced during industrial tasks.
Full embroidery industrial accidents in recent years has shown a declining trend. But disaster embroidery of domestic construction industry were more than 20,000 deaths per year is about 500 people. The government has introduced a construction site often changing the recruitment of new construction based on health and safety as an alternative to road safety education training yisuje of construction workers, daily work periods short. Certificate of Basic OSH Training in Constructions had also been evaluated as successful by reducing the accident rate problem. It is conducted in private educational institutions has occurred on the friction between workers and employers and training costs are difficult to approach workers in the education standards for such facilities due to the superintendent. Educational institutions are institutions that have been caused by excessive competition lowered levels of education. There is also a lack of evaluation that the training is limited to the basic safety knowledge. These details are brought formal safety education purposes only and is introducing the results of other self jyeotgi difficult to reap the proceeds to good effect. In this study, we propose a plan for improving operational problems and enemy status based on research data presented after the Certificate of Basic OSH Training in Construction.
This study is intended to look into the effect of construction safety supervision system on risk control and reduction. To achieve this, a survey was carried out to 114 companies in construction, ordering, contract and management. The overall findings were as follows. The effect of construction safety supervision system on risk control and reduction showed that factors of supervision system, supervision cost and supervision method had a positive effect on risk control and reduction. And their perception of the introduction of safety supervision system in construction sites according to process showed that there was a difference between them according to the field of ordering, contract and supervision. There was the biggest difference between owner and contractor in double supervision system, but no difference between them in the perception of risk reduction. These results show that all ordering, contract and supervision are positively needed for the introduction of construction safety supervision. This means that there is a difference between owner and contractor in the perception of process according to system operation. All companies agree to system improvement by the settlement of safety supervision system for the prevention of safety accidents and safe construction, but the systematic complement of safety supervision is the burden of contractor. And there is a big difference between owner and contractor in the perception of responsibility and concern for cost burden.
Rashid, Khandakar M.;Datta, Songjukta;Behzadan, Amir H.;Hasan, Raiful
Journal of Construction Engineering and Project Management
/
v.8
no.1
/
pp.10-21
/
2018
Many construction projects involve a plethora of safety-related problems that can cause loss of productivity, diminished revenue, time overruns, and legal challenges. Incorporating data collection and analytics methods can help overcome the root causes of many such problems. However, in a dynamic construction workplace collecting data from a large number of resources is not a trivial task and can be costly, while many contractors lack the motivation to incorporate technology in their activities. In this research, an Android-based mobile application, Preemptive Construction Site Safety (PCS2) is developed and tested for real-time location tracking, trajectory prediction, and prevention of potential collisions between workers and site hazards. PCS2 uses ubiquitous mobile technology (smartphones) for positional data collection, and a robust trajectory prediction technique that couples hidden Markov model (HMM) with risk-taking behavior modeling. The effectiveness of PCS2 is evaluated in field experiments where impending collisions are predicted and safety alerts are generated with enough lead time for the user. With further improvement in interface design and underlying mathematical models, PCS2 will have practical benefits in large scale multi-agent construction worksites by significantly reducing the likelihood of proximity-related accidents between workers and equipment.
In the consideration of the working conditions, which have several kinds of works operating at the same time, at construction sites, it is difficult to prevent industrial accidents. There are a number of works to employ flammable materials and hot works simultaneously operated without fire protection systems. It causes a huge fire and casualties. In this research to analyze an accident case, the reasonable prevention methods are suggested throughout the property tests for the organic solvents and the analysis of the behavior for vapour cloud in the underground area of the construction site.
Cultural heritage passing down to posterity is a global concern. But there are many culture heritage that not remained to now disappeared by various disasters. It is told that disaster is learnt from disaster. The most fundamental task in disaster prevention is to collect and analyze cases of accidents so as not to repeat a disaster. In other words, an analysis of various disaster-related materials and their countermeasures in the Joseon period is an actual condition-based phenomenological methodology used to prevent disasters at cultural properties today. In this context, it is important to collect histories of disasters in the Joseon period, to extract disaster-related historical data and to categorize the data to build a disaster literature database. This study has produced [Database of Disasters in the Joseon Era], a collection of articles on fire outbreaks based on The Annals and The Daily Records belonging to the Memory of the World. On the basis of this chronology, human and property damages caused by fires in Joseon have been examined, identified by districts, as well as disaster technologies, have been analyzed. It has also built disaster vulnerability maps in the Joseon Dynasty Era.
The number of fuel gas accidents is increasing in domestic fuel gas facilities as increasing the supply area. To prevent gas accident, the government institutions related to fuel gas industry partly collected and managed the information of physical properties and safety data. Due to the overlap of data between institutions, collecting and managing the safety information was inefficient. The purpose of this research is developing geographic information system which providing the information of quantitative risk assessment, accident prevention plan, and efficient sharing and managing of the system.
A survey for understanding the opinion about the safety and economy of different types of detonators used in domestic tunnel construction was carried out for total 345 people in related areas. From the result, it was found that 86.7% of the surveyed people felt non-electric detonator was safe. From the experimental points that the cost of detonators is in charge of 8.1% in overall tunnel blasting cost, and the utilization of non-electric detonators will also contribute to the prevention of blasting accidents by the electrical safety, this study can help providing opinions and basic data collected from related areas to manufacturing companies, police department, and companies ordering tunnel construction.
The research on the explosive limits is one of fundamental fields of combustion process, and information on the explosive limits of mixture of fuel and oxidant, with or without additives, is very important for the prevention in industrial fire and explosion accidents. Explosive limits of all compounds and solvent mixtures can be calculated with the appropriate use of the fundamental laws of Raoult, Batten, Le Chatelier and MRSM(modified response surface methodology) model. In this study, the reference values of lower explosive limits(LEL) of the ethanol+toluene+ethylacetate system were compared with the calculated values by using the solution thermodynamics and the MRSM model, respectively. The values calculated by the proposed equations were a good agreement with literature data within a few percent. By means of this methodology, it is possible to evaluate reliability of experimental data of the lower explosive limits of the flammable mixtures. Also, from given results, it is possible to predict explosive limits of the other flammable liquid mixtures used in the chemical process by the use of the proposed equations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.