• 제목/요약/키워드: ATC Accident Analysis

검색결과 6건 처리시간 0.027초

국내 민간조종사-관제사의 항공영어 수용오류의 인지적 특성측정 및 평가 (An Analytic Study of the cognitive features of the Korean civilian pilot-ATC controller aviation English language use which affects job performance)

  • 신현삼
    • 대한안전경영과학회지
    • /
    • 제9권6호
    • /
    • pp.81-88
    • /
    • 2007
  • This study deals with the overall meta-cognitive aspects of ATC-Pilot miscommunications pertinent to cognitive human errors based on the previous literature research which it has been focused on the issue of the global aviation English use in regard with aircraft accident and incident. Especially, it addresses the concern over the ICAO aviation English language proficiency evaluation program which will be implemented globally in March, 2008. In addition, It presents the analysis related to the on-going English language proficiency level four test conducted for Korean civil airlines pilots and air traffic controllers.

수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구 (A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS))

  • 손영진;박근수;민경윤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.755-770
    • /
    • 2006
  • 1974. 8.15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basic design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

  • PDF

수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구 (A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS))

  • 손영진;박근수;민경윤
    • 한국철도학회논문집
    • /
    • 제10권1호
    • /
    • pp.57-66
    • /
    • 2007
  • 1974. 8. 15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 2224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basie design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

중련편성 열차를 위한 효율적인 사건기록기 운영방안 (Effective event recorder operation method for multi-coupled trainset)

  • 최권희;정병호;민평오;오용석;이종우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1428-1432
    • /
    • 2007
  • One of the most important targets of transportation is to transport human and commodities to the destination safely. Railway has low risk, compared with land, ocean and flight route and it assures high security as well as high speed driving, since it runs on regular track. However, train accident may result in tragic accident due to small carelessness, so special event recorder is preferably used in order for clarity of responsibility in case of accident, maintenance of signal device and defect analysis. JRU(Juridical Recorder Unit) for ATC/ATS/ATP can be more advanced event recorder. Event recorder of KTX-I which is running now is installed one by one on each leading car and last car, and operation plan of event recorder in case of single trainset is suggested. But regarding train operation of multi-coupled trainset operation such as KTX-II, more detailed study is required for event recorder revitalization and record data process method. Therefore, this research aims at operation plan used in existing event recorder, and suggests effective operation and management plan of event recorder in multi-coupled trainset such as new High Speed Train.

  • PDF

인적오류의 세부적 분류와 실증분석에 관한 연구 (A Study on the Detailed Classification and Empirical Analysis of Human Error)

  • 김양규;김칠영;최연철
    • 한국항공운항학회지
    • /
    • 제10권1호
    • /
    • pp.9-20
    • /
    • 2002
  • In aviation, it is important to analyse and classify human error in detail. Because human error has been implicated in 70 or 80% of aviation accidents in literature review. But, there is little detailed classification and research of human error. In this study, Objectives are to establish human error model by classifying types of human error in detail and also to analyse human factors by using the established model. Analysis of the data uses Korea Aviation Incidents Reporting System(GYRO). The resulting from actual analysis, there is a some difference between flight steps for human error occurrence and types of human error are different according to the aviation personnel(pilot, ATC controller).

  • PDF

항공교통관제사의 휴먼에러에 기인한 국내외 항공기 사고 사례연구 - TEM(Threat & Error Management) 분석법을 적용하여 - (A Case Study on Aircraft Accidents Due to Air Traffic Controller's Human Error - Applying TEM (Threat & Error Management) Analysis -)

  • 김정빈;박성식
    • 한국항공운항학회지
    • /
    • 제29권4호
    • /
    • pp.124-133
    • /
    • 2021
  • The airline industry has been growing steadily since 2016 with more than 100 million air passengers, renewing the largest number of air passengers every year. Increasing air demand leads to an increase in air traffic in limited airspace, increasing the likelihood of accidents between aircraft. Due to the massive human and material damage caused by a single mistake, aviation safety is being heavily focused around the world to efficiently use limited airspace. Studies related to various human factors are underway as most of the aviation accidents are found to be caused by human factors, but research on human factors by controllers is insufficient while they are active in terms of control and operation. Given that 82% of air accidents caused by controllers are caused by human error, the importance of management of human error and changes in perception are urgently needed. This study aims to understand the seriousness of the controller's human error by analyzing the accident cases caused by the controller's human error using TEM to identify threats and errors and derive common human factors.