• Title/Summary/Keyword: ARENA Simulation

Search Result 102, Processing Time 0.026 seconds

Simulation Based Conceptual Design of ELV Dismantling System (시뮬레이션 기반 폐자동차 해체시스템의 개념설계)

  • 손영태;표정호;박면웅
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.890-894
    • /
    • 2003
  • This paper discuss basic functional construction and plant layout of a ELV dismantling system that can maximize the reusability of tarts and the recoverability of materials by dismantling ELV rationally and efficiently. "Island" type was selected for the system configuration considering processing amount, economical efficiency, and effectiveness. The system is supported by the information system, and composed of dismantling stations and handling equipments. The layout of the stations was determined after simulation and optimization using commercial software package, Arena and OptQuest. The objective of the optimization was maximum profit while the system capacity is considered as constraint. The environmental load of ELV can be minimized when the composition and function of each station are embodied in detail and the system is interfaced with shredding operation.

  • PDF

Development of Area Traffic Control Model by Using High Level Architecture (상위체계구조를 이용한 지역교통망 통제모형 개발)

  • Lee Sang-Heon
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.10a
    • /
    • pp.3-7
    • /
    • 2004
  • There are some limitations in the analysis and evaluation for area traffic control systems. The area traffic is consist of several intersections interconnected which are very complicated and many traffic strategy are adopted for the control system. This paper features an effective area traffic control system by High Level Architecture(HLA) which is a new developed simulation tool. In this paper, we discuss the design of HLA-based area traffic control simulation. We describe technical motivations for the HLA, the key elements of the architecture and how they are minimum and essential to the goal of reuse and interoperability in simulation arena.

  • PDF

A Study on Optimized Layout Design of FAS Line Through Production Flow Analysis (생산 흐름 분석을 통한 FAS라인의 최적 배치 설계에 관한 연구)

  • Ga, Chun-Sik;Jung, Jin-Hwi;Jang, Bong-Choon;Eom, Yong-Gyun
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.1070-1075
    • /
    • 2004
  • Many mid-sized companies in Korean automotive industry have attempted to solve the lack of human power, to control the quality of components, to improve the production rate, and to innovate the manufacturing line. The goals of this study are to analyze the production rate of an automotive component manufacturing line using simulation software, to construct a Flexible Automation Subassembly (FAS) system and to suggest an optimized layout design using FAS line. In this research, the simulation model for manufacturing line was developed and used the realistic data (production planning, component type, working order, process time, queue time, line rules, etc) of a medium sized company in Korean automotive industry. To complete this research, a simulation software 'ARENA' was used.

  • PDF

A Simulation Study for RFID Application to the Port Container Terminal (항만 컨테이너 터미널에서의 RFID 적용을 위한 시뮬레이션 연구)

  • Lee, Choong-Hoon;Jang, Kyoung-Yeol;Kim, Jae-Gon;Yoo, Woo-Sik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.4
    • /
    • pp.30-38
    • /
    • 2007
  • In this study, we propose an RFID based container terminal operation process. Field tests are conducted for 900 MHz (truck identification) tag and 433 MHz RFID (container identification/e-seal) tag at an Incheon container terminal to verify possibility of applying RFID in the container terminal gate. To evaluate effect of applying RFID in the container terminal operation, simulation models for current and RFID based container terminals are developed using ARENA. Simulations are carried out using industrial field data and the result indicates that performance of the container terminal can be prominently improved after RFID application.

A Study on Optimized Layout Design of FAS Line Through Production Flow Analysis (생산 흐름 분석을 통한 FAS라인의 최적 배치 설계에 관한 연구)

  • Ga Chun Sik;Jang Bong-Choon;Eom Yong-Gyun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.29 no.1 s.232
    • /
    • pp.38-44
    • /
    • 2005
  • Many mid-sized companies in Korean automotive industry have attempted to solve the lack of human power, to control the quality of components, to improve the production rate, and to innovate the manufacturing line. The goals of this study are to analyze the production rate of an automotive component manufacturing line using simulation software, to construct a Flexible Automation Subassembly (FAS) system and to suggest an optimized layout design using FAS line. In this research, the simulation model for manufacturing line was developed and used the realistic data of a medium sized company in Korean automotive industry. To complete this research, a simulation software 'ARENA' was used. This research analyzed the work distribution strategy and cycle time element for production flow and proposed an optimized layout to resolve line balancing problem which would bring the improved production rate.

Evaluation of Train Overhaul Maintenance Capacity for Rolling Stock Depot Using Computer Simulation Method (시뮬레이션 기법을 활용한 열차 차량기지의 중정비 검수 용량 평가)

  • Jang, Seong-Young;Jeon, Byoung-Hack;Lee, Won-Young;Yoo, Jae-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.231-242
    • /
    • 2007
  • As railroad industry faces the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high-speed long-distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for regular operations of the example maintenance center are developed. In this study, standard maintenance procedures, layout, equipments, and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. After simulation, four types of observations are analyzed. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Third, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared. Lastly, the simulation results according to worker's working coverage shows expanding the worker's coverage decreases the cycle time and increases throughput per train. However, workers are to be fully trained to do multiple skill work.

A Study on the Resource Allocation Strategies of the Container Terminals Using Simulation Technique (시뮬레이션 기법을 이용한 컨테이너 터미널의 자원할당 전략에 관한 연구)

  • 장성용
    • Journal of the Korea Society for Simulation
    • /
    • v.8 no.4
    • /
    • pp.61-72
    • /
    • 1999
  • This paper presents an estimation method of container handling capacity and selection of resource allocation strategies of container terminals using the computer simulation models. Simulation models are developed to model container terminal consisting of 4 berths considering the berth allocation strategies, crane allocation strategies and the total number of container cranes using Arena simulation package. The proposed models do not consider the yard operations and gate operations. All the input parameters for the models are estimated on the basis of the existing container terminal operation data and the planning data for the automated container terminal planned by Korean government. Four berth allocation strategies and three crane allocation strategies are considered. The total number of container cranes considered ranges from 12 to 15. Non-terminating simulation techniques are utilized for the performance comparison among alternatives. The performance measures such as average ship turnaround time, average ship waiting time, average ship service time, the number of containers handled per year, and the number of ships processed per year are used. The result shows that the berth allocation strategy minimizing the sum of the number of ships waiting, the number of busy container cranes and number of ships handled performs better than any other berth allocation strategies. In addition, the crane allocation strategy allocating up to 5 container cranes per berth performs better than any other crane allocation strategies. Finally there are no significant performance differences among the alternatives consisting of different total number of container cranes allocated.

  • PDF

Using Simulation to Predict the Number of Recovery Bed and Waiting Time as Increasing Client for Sleep Endoscopy Check in Health Service Center (건강검진센터에서 위장 및 대장 수면 내시경 검사 증가에 따른 필요 회복실 침상 수 및 대기 시간 예측 시뮬레이션)

  • Lee, Hee-Joo
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.2
    • /
    • pp.35-42
    • /
    • 2010
  • The increasing regular medical check up rate for early diagnosis in disease has increasing sleep endoscopy rate because of reduction with discomfort. The purpose of this study was to determine the number of recovery bed as increasing sleep endoscopy rate using check up time, waiting time & recovery time at a general hospital in Seoul. This study was analyzed using ARENA 10.0 program. At present and as increasing of sleep endoscopy rate 10%, 20% was increased recovery time, waiting time & the rate of bed inflection. So at present, the number of recovery bed has to increase for client's safety and as increasing of sleep endoscopy rate 10%, 20% has to increase 3 and then waiting time decreased in 2 minutes.

Development of the Postal Transportation Network Simulation System (우편운송망 성능평가를 위한 시뮬레이션 시스템 개발)

  • Park, Sang-Yong;Lee, Tae-Han;Choi, Ji-Young;Lee, Suk
    • IE interfaces
    • /
    • v.18 no.4
    • /
    • pp.454-464
    • /
    • 2005
  • In Postal logistics, the efficient design and operation of transportation network is very important issue. But, it is hard to operate the postal transportation network flexibly according to the change of mail volume. In Korea post, a transportation plan is pre-determined and the transportation of mail is performed through the routes in the plan. When the routes cannot transport all mail, temporary vehicles are used. In the postal transportation, it is important to make a good transportation plan and to manage the plan efficiently. But the change of transportation plan is not a simple work because hundreds of vehicles and persons are related to the plan. So, a methodology to check the effect of the change of the transportation plan in advance is required. In this paper, we develop a simulation model to evaluate the performance of a postal transportation plan. We implement the simulation model and develop an information system including user interface for managing data and simulation results. We apply our simulation model and system to the real change of transportation plan.

A Case Study on the Capacity Design for Manufacturing Process of Bearing-Race (베어링궤도 제조공정의 용량설계에 관한 사례연구)

  • Moon, Dug-Hee;Song, Cheng
    • IE interfaces
    • /
    • v.15 no.4
    • /
    • pp.349-355
    • /
    • 2002
  • In order to build a new factory, we must have answers regarding the following questions; 1. what is to be produced? 2. how are the products to be produced? 3. how much of each product will be produced? The answers are related to product-design, process-design and capacity-design respectively and they are used for layout-design as the input data. Especially capacity design decision provides the information regarding the number of equipments required and the balance of the line. This paper introduces a case study on the capacity design for a new factory where the retainers of ball bearing are manufactured. A simulation model is developed with ARENA for analyzing the system considered. The major objectives of the study are evaluating the performance of the line which is originally suggested by the company, and finding out alternatives for improving the system. Number of WIP between the processes are also investigated because it affects the space planning of the layout.