• Title/Summary/Keyword: AHP Analysis Method

Search Result 616, Processing Time 0.029 seconds

The Site Analysis for Crop Cultivation Using GIS-Based AHP Method (GIS 기반 AHP 기법을 이용한 작물재배 적지분석)

  • Kim, Tae Jun;Lee, Geun Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.695-702
    • /
    • 2006
  • In GIS-based Spatial Decision-making Support System (SDSS), the Boolean logic by conventional simple overlay method contains two problems. One is losing lots of information in analysis process, the other is unable to reflect of weighting values between evaluated items. Therefore, evaluation system as Analytic Hierarchy Process (AHP) needs to improve these problems effectively. The purpose of this study is to provide the benefit of AHP method and GIS spatial analysis in site analysis for crop cultivation. First, the weighting value of AHP for topography, distribution grade of water, property of soil and slope items are evaluated throughout survey to experts of soil, crop and agricultural management fields. On the basis of these weighting value of AHP by items, site suitability analysis for black raspberry cultivation is performed. To estimate the benefit of AHP method, the current cultivating map of black raspberry is constructed in Ssangchi-myeon district. In comparison with site analysis of Boolean logic, site analysis of AHP method shows more realistic.

The Method of Results of Decision Reflections Between PI Project Valuation Groups Using AHP (AHP를 활용한 PI사업 평가그룹간 의사반영 방안)

  • Kim, Kwan-Joong;Jang, Myung-Soon
    • International Journal of Highway Engineering
    • /
    • v.8 no.4 s.30
    • /
    • pp.145-157
    • /
    • 2006
  • Generally, the method of the policy analysis has been used for making a policy decision of the development project of the road through the expert interview based on AHP. According to introducing PI, the study of the method of the integrating process for various opinion of the related groups is required. On this study I evaluate what is a difference between the results of integrated process and the AHP analysis on what is major considering factor in decision-making process. From the analysis, each evaluate factor is in level of significance by ANOVA. First, there is a significance level difference between Group A, C and Group B Second, there is also a significance level difference on the result of AHP analysis for each group in order to evaluate by integrated method. Finally, the method of AHP analysis which considers priority factor is expected as to be useful tool on decision-making of various group.

  • PDF

An Objective Method of Risk Evaluation based on RAM(Reliability, MTBF) and AHP Data Analysis for Warship (RAM(신뢰도, MTBF) 데이터와 AHP 분석을 통한 함정분야 위험평가 방안)

  • Ham, Young-Hoon;Beak, Yong-Kawn
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.5
    • /
    • pp.714-721
    • /
    • 2018
  • This study proposes a risk evaluation method based on RAM and AHP data in order to prevent subjectivity of risk assessment. The risk assessment consist of Risk Likelihood(RL) and Risk Consequence(RC) in five levels. However, risk analysis of warships is hard to make a judgment because of small quantity production(Ship), long building period, equipment changes, complexity, various kinds of equipments, etc. The proposed RAM data and AHP analysis method are used to quantify each level quantitatively. RAM(MTBF) date is used to classify the RL, and AHP analysis is used to classify the RC. These scientific and data-based method will increase objectivity as well as efficiency of risk evaluation.

Integrated AHP and DEA method for technology evaluation and selection: application to clean technology (기술 평가 및 선정을 위한 AHP와 DEA 통합 활용 방법: 청정기술에의 적용)

  • Yu, Peng;Lee, Jang Hee
    • Knowledge Management Research
    • /
    • v.13 no.3
    • /
    • pp.55-77
    • /
    • 2012
  • Selecting promising technology is becoming more and more difficult due to the increased number and complexity. In this study, we propose hybrid AHP/DEA-AR method and hybrid AHP/DEA-AR-G method to evaluate efficiency of technology alternatives based on ordinal rating data collected through survey to technology experts in a certain field and select efficient technology alternative as promising technology. The proposed method normalizes rating data and uses AHP to derive weights to improve the credibility of analysis, then in order to avoid basic DEA models' problems, use DEA-AR and DEA-AR-G to evaluate efficiency of technology alternatives. In this study, we applied the proposed methods to clean technology and compared with the basic DEA models. According to the result of the comparison, we can find that the both proposed methods are excellent in confirming most efficient technology, and hybrid AHP/DEA-AR method is much easier to use in the process of technology selection.

  • PDF

Analysis of Landslide Hazard Area using Logistic Regression Analysis and AHP (Analytical Hierarchy Process) Approach (로지스틱 회귀분석 및 AHP 기법을 이용한 산사태 위험지역 분석)

  • Lee, Yong-jun;Park, Geun-Ae;Kim, Seong-Joon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.861-867
    • /
    • 2006
  • The objective of this study is to analyze the landslide hazard areas by combining LRA (Lgistic Regression Analysis) and AHP (Analytic Hierarchy Program) methods with Remote Sensing and GIS data in Anseong-si. In order to classify landslide hazard areas of seven levels, six topographic factors (slope, aspect, elevation, soil drain, soil depth, and land use) were used as input factors of LRA and AHP methods. As results, high-risk areas for landslide (1 and 2 levels) by LRA and AHP of its own were classified as 46.1% and 48.7%, respectively. A new method by applying weighting factors to the results of LRA and AHP was suggested. High-risk areas for landslide (1 and 2 levels) form the new method was classified as 58.9%.

Risk analysis using PROMETHEE method In Building Construction MANAGEMENT

  • Jang-Young Lee;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1364-1369
    • /
    • 2009
  • The building construction projects include a variety of risk factors due to uncertainties. To succeed in the projects, it is important how risks are managed. Risk management is composed of identification, analysis and response. Especially, the risk analysis is important to objectively calculate significance of risk factors. This paper evaluates a method to find priorities of risks using the AHP(Analytic Hierarchy Process). The method has some defects; (1) the consistency becomes weak as the number of pair-wise compared risks is large, and (2) the input and output procedures are complex when risks are added to or removed from a risk database. Thus the paper adopt the PROMETHEE(Preference Ranking Organization METHod Enrichment Evaluations) analysis process which is able to overcome the limitation of the AHP restricted to 9 risk factors. The PROMETHEE method makes the procedure of risk analysis simple, when the risk factors pull out and put in the risk database. The purpose of this study is to prove the possibility of the PROMETHEE analysis process by being compared with AHP.

  • PDF

An Analytic Method for CRM Performance's Measurement Factors of Hotel Management (호텔기업의 CRM 운용성과 측정요인의 분석 방법)

  • Oh, Sang-Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.3
    • /
    • pp.654-659
    • /
    • 2007
  • This study suggests a measure method for measuring variables that are used for hotel corporations' CRM performance. For this purpose, I present a combined method between factor analysis and AHP(Analytic Hierarchy Process) analysis. Factor analysis gives us a result that shows a group of highly correlated variables and another group of less correlated variables. Thus, factor analysis can only give information of factor categorization. Although researchers add ANOVA analysis or regression analysis, these efforts can not connect its results with factor analysis. Therefore, In hotel CRM performance analysis, calculation of each factor's importance is strongly required. For that reason, I suggest a method that combines AHP analysis with factor analysis for Hotel CRM performance measurement.

  • PDF

A Production Method of Landslide Hazard Map by Combining Logistic Regression Analysis and AHP(Analytical Hierarchy Process) Approach Selecting Target Sites for Non-point Source Pollution Management Using Analytic Hierarchy Process

  • Lee, Yong-Joon;Park, Geun-Ae;Kim, Seong-Joon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.3
    • /
    • pp.63-68
    • /
    • 2007
  • The LRA(Logistic Regression Analysis) conducts a quantitative analysis by collecting a lot of samples and the AHP(Analytic Hierarchy Program) makes use of expert decision influenced by subjective judgment to a certain degree. This study is to suggest a combination method in mapping landslide hazard by giving equal weight for the result of LRA and AHP. Topographic factors(slope, aspect, elevation), soil dram, soil depth and land use were adopted to classify landslide hazard areas. The three methods(LRA, AHP, the combined approach) was applied to a $520km^2$ region located in the middle of South Korea which have occurred 39 landslides during 1999 and 2003. The suggested method showed 58.9% matching rate for the real landslide sites comparing with the classified areas of high-risk landslide While LRA and AHP Showed 46.1% and 48.7% matching rates respectively. Further studies are recommended to find the optimal combining weight of LRA and AHP with more landslide data.

The Assessment of the Risk Index in the Bridge Construction by the AHP Method (AHP기법을 이용한 교량공사 위험지수 평가)

  • Lee, Myeong-Gu;Jeong, Myeong-Jin;Kim, Kyu-Dong;Choi, Soon-Ju;Park, Seung-Kook
    • Journal of the Korean Society of Safety
    • /
    • v.24 no.6
    • /
    • pp.119-123
    • /
    • 2009
  • The purpose of this study is to verify the assessment of the risk index by the AHP method effective in the bridge construction. We compared that by the AHP method with the risk index by the accident analysis in the bridge construction. This method results in the useful tool deciding the assessment of the risk index according to work type in the bridge construction.

A Study on the Weights of the Condition Evaluation of Rock Slope used in Entropy and AHP Method (AHP 및 엔트로피 기법을 적용한 절리암반비탈면 상태평가항목의 가중치 연구)

  • Seong, Joohyun;Byun, Yoseph
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.5
    • /
    • pp.61-66
    • /
    • 2016
  • Many cut slopes are located along national roads, there were the collapse of cut slopes. In this study, the weights for condition evaluation of rock slopes was calculated using the entropy method and analytic hierachy process(AHP) method. The entropy analysis was performed using 95 cut slope data, and the AHP analysis was performed by a questionnaire to several expert. The weights based on analysis results were compared with evaluation weights of existing standard. As a result of this study, there was the difference of weights among the analytical methods. Later on, if this study's results is used to improvement current evaluation weights, it will be possible to perform the reliable condition evaluation.