• Title/Summary/Keyword: A single line tunnel

Search Result 27, Processing Time 0.028 seconds

Electronic Blasting for Excavating Single Line Railway Tunnel Close to Residential Area (보안물건이 근접한 소단면 철도 단선터널 굴착시 전자발파 시공사례)

  • Lee, Min Su;Kim, Hee Do
    • Explosives and Blasting
    • /
    • v.34 no.3
    • /
    • pp.17-20
    • /
    • 2016
  • This paper introduce a multistage parallel non-vibration electronic tunnel blasting cases which adapts Electronic Blasting System(EBS) and the center-cut blasting method to excavating a single line railway tunnel close to residential area. As a result, it was revealed that the vibration and noise showed a reduction of 23.5% and 75% of compared with the allowable standard. We successfully completed the tunnel excavation with decreasing construction time and construction cost and without civil compliant.

Tunnel Safety Diagnosis in Near-excavation by In-depth Inspection of Tunnel (기존터널 안전진단 결과를 통한 근접시공 시 터널 안정성 평가)

  • Kim, Seok-Jae;Kim, Min-Seok;Kim, Jun-Chul;Yoo, Young-Il;Oh, Joung-Bae;Oh, Sae-Joon
    • Tunnel and Underground Space
    • /
    • v.16 no.4 s.63
    • /
    • pp.347-356
    • /
    • 2006
  • We analyzed case studies doing in-depth inspection of tunnel to maintain safety of existing tunnel in constructing new tunnel near to a existing tunnel with single track. Futhermore, We accomplished in-depth inspection of existing tunnel and numerical analysis. We suggested remedies to security safety of existing tunnel. We applied line drilling and pre-large hole boring method not to have an effect on existing tunnel and convinced the safety of existing tunnel from blast-vibration and blast-noise of numerical analysis. We planed to install basset system to measure displacement of existing tunnel according to excavating new tunnel.

A Case on Excavation Plan and Design of Adjacent Railroad Tunnel (근접 철도터널의 굴착계획 및 설계 사례)

  • 김선홍;정동호;석진호;정건웅;서성호
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

Construction Planning and Design of a Long Tunnel (장대 터널의 계획과 설계)

  • 장석부;윤영훈;김용일;김진한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.117-124
    • /
    • 2000
  • This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.

  • PDF

Construction Plan by Large Diameter Shield TBM Method and Analysis of Deformation on Site Under Soo-Young River (대구경 Shield TBM공법에 의한 수영강 하저터널 시공계획 및 시공중 발생되는 거동의 공학적 분석)

  • 윤현돈;황규호;최기훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.25-32
    • /
    • 2001
  • Doosan Construction & Engineering Co., Ltd is building a railway tunnel beneath the Soo-Young River connecting MinLak Station and Centum City Station, a section 230, subway line 2, Pusan City, Korea. When completed the tunnel will have a finished inner diameter of 6.5m(21.311) throughout its total length of 840m(420m = 0.52 miles, Two Single Track Tunnel : 420m+420m). The ground profile of the face toward shield machine is composed of multi layers, silty clay, clayey gravel, soft rock etc. This research paper is to predict ground deformation and variation of stresses around tunnel using Hyperbolic model, and to reflect the works on the next shield tunneling project. And this research paper is analyzed data of measuring instrument (such as settlement gauge, inclinometer, Multiple extensometer, etc.) which is installed along tunnel line for safety of tunnel. For calculations, the finite difference Method is applied. Backfill grouting material is supposed to have instantly strength of 10kg/$\textrm{cm}^2$ above, although its strength is available after 24 hours passed.

  • PDF

Settlement behaviours and control measures of twin-tube curved buildings-crossing shield tunnel

  • Jianwei, Jia;Ruiqi, Gao;Defeng, Wang;Jianjun, Li;Ziwen, Song;Jinghui, Tan
    • Structural Engineering and Mechanics
    • /
    • v.84 no.5
    • /
    • pp.699-706
    • /
    • 2022
  • Settlement control techniques are critical for the safety of shield tunnel constructions, especially for facing complex situations. In this study, the shield tunnel structure from Huaita east road station to Heping Road station in Xuzhou metro No.3 line (China) is taken as engineering background, which has various complex problems of the upper-soft and lower-hard composite stratum conditions, twin curve shield tunnels, and underpass the foundation of the piled raft. The deformation characteristics of shield tunnelling passing through buildings are explored. Subsequently, comprehensive research methods of numerical simulation and field measurement are adopted to analyzing the effectiveness of settlement control by using the top grouting technique. The results show that the settlement of the buildings has obvious spatial characteristics, and the hysteresis effect can be obviously observed in soil deformation caused by shield construction. Meanwhile, the two shield constructions can cause repeated disturbances, reducing the soil deformation's hysteresis effect. Moreover, the shield tunnel's differential settlement is too large when a single line passes through, and the shield construction of the outer curve can cause more significant disturbance in the tunnel than the inside curve. Notably, the proposed process control parameters and secondary topgrouting method can effectively control the deformation of the shield tunnel, especially for the long-term deformation.

Dynamic response of transmission line conductors under downburst and synoptic winds

  • Aboshosha, Haitham;El Damatty, Ashraf
    • Wind and Structures
    • /
    • v.21 no.2
    • /
    • pp.241-272
    • /
    • 2015
  • In the current study, dynamic and quasi-static analyses were performed to investigate the response of multiple-spanned and single-spanned transmission line conductors under both downburst and synoptic winds considering different wind velocities and different length spans. Two critical downburst configurations, recommended in the literature and expected to cause maximum conductor reactions, were considered in the analyses. The objective of the study was to assess the importance of including the dynamic effect when predicting the conductor's reactions on the towers. This was achieved by calculating the mean, the background and the resonant reaction components, and evaluating the contribution of the resonant component to the peak reaction. The results show that the maximum contribution of the resonant component is generally low (in the order of 6%) for the multiple-spanned system at different wind velocities for both downburst and synoptic winds. For the single-spanned system, the result show a relatively high maximum contribution (in the order of 16%) at low wind velocity and a low maximum contribution (in the order of 6%) at high wind velocity for both downburst and synoptic winds. Such contributions may justify the usage of the quasi-static approach for analyzing transmission line conductors subjected to the high wind velocities typically used for the line design.

A Study on the Determination of Optimal Section for the Subway Tunnels (지하철 터널 최적단면 결정에 관한 연구)

  • 김경호
    • Explosives and Blasting
    • /
    • v.14 no.2
    • /
    • pp.63-70
    • /
    • 1996
  • This paper describes the method used to determine the optimal section for the horseshoe shaped single tunnel which is utitized widely in constructing subway tunnels. Vehicle and structural gauges conform to the design criteria for the Seoul Subway Line 5. The tunnel sections are determined considering the structural stability, and the tunnel excavation area is optimized so as to minimize design and construction costs.

  • PDF

Stress and strain state in the segmental linings during mechanized tunnelling

  • Do, Ngoc-Anh;Oreste, Pierpaolo;Dias, Daniel;Antonello, Croce;Djeran-Maigre, Irini;Livio, Locatelli
    • Geomechanics and Engineering
    • /
    • v.7 no.1
    • /
    • pp.75-85
    • /
    • 2014
  • The application of the mechanized tunnelling has been extended in recent years. There are at present different approaches that are used in the design of segmental tunnel linings supported in mechanized tunnels. Even though segmental lining is utilized for mechanized tunnels, its behaviour is still quite unclear under in situ stress and there is a lack of data regarding the distribution of stresses inside segmental linings. So far no single effective calculation method exists for segmental lining design. The lack of clear solutions makes the use of segmental lining to be more expensive due to the adoption of greater safety factors. Therefore, a particular attention must be given in order to obtain data from monitored tunnels which permits to validate design methods. In this study, strain measurements, which were conducted during the construction of twin tunnels in the Bologna-Florence railway line, have been presented. The behaviour of segmental lining during the excavation and the influence of a new tunnel excavation on an existing tunnel have been shown through the measured data. The data are then compared with the results obtained with Einstein and Schwartz's method and Duddeck and Erdmann's method, which permits to highlight the fact that the two analytical methods underestimate structural forces induced in the segmental lining and then must be used with caution.

Effect of Separation Between Main and Divergent Tunnels in Divergence Section of Double-Deck Tunnel on the Stability (복층터널 분기구에서의 터널 이격에 따른 안정성 영향)

  • La, You-Sung;Kim, Bum-Joo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.15 no.2
    • /
    • pp.45-54
    • /
    • 2016
  • Double deck tunnels are considered to have a large demand in a near future for solving traffic congestion problems and overcoming the limitations in constructing new tunnels. This study presents a numerical investigation using finite element (FE) analysis on the behaviors of the tunnels and the stability of pillars in a divergence section where single tunnel is diverged from a main line double deck tunnel. The effects of the separation distance between the diverged and the main tunnels and the ground condition were examined through the FE analysis by varying the separation distance from 0.1D to 2.0D (D: diameter of main tunnel) and the rock class from class I to V, respectively, and the analysis results were compared with those using empirical methods, strength-stress ratio, and the volume of interference. The FE analysis results indicated that the separation distance has a larger effect on tunnel behaviors, compared with the rock strength, and a single tunnel with a large cross section is more favorable than two separated tunnels for tunnel stability when the separation distance is below 0.7D.