• 제목/요약/키워드: A development plan

검색결과 5,746건 처리시간 0.034초

농촌마을종합개발 항목별 중요도 분석 및 개선방안에 관한 연구 - 인제군 용대권역을 중심으로 - (Rural Village Development Itemized Study on the Importance Analysis and Improvement)

  • 안중호;이주형
    • 한국농공학회논문집
    • /
    • 제54권6호
    • /
    • pp.9-17
    • /
    • 2012
  • In 1960's, Korea had concentrated on economic development, in the meantime the existing problem which is an avoiding rural settlement phenomenon such as a farming population decrease, an unstabel income, poor surroundings, etc. could intensify. And because of an exodus from agricultural area caused by industrialization and a fall of agricultural farm price as a result of domestic agricultural market opening in accordance with FTA, in 2004 Korean government excuted the integrated rural-village development plan as a measure to provide more support for agricultural villages. The integrated rural-village development plan means that inter-connected with villages which have potnetial and developed it as a unit of small-zone, also we can assume it a Down-up development type because residents participate and lead this plan directly. But, this plan made progress rapidly as a countmeasure of government so, it needs to evaluate for completed project area and make an improvement for a sustainable undertaking. Therefore, this study categorized project contents systematically into two parts of Hardware and Software, after that composed of 4 large-parts, 13 mid-parts and 43 small-parts from Inje-Yongdai zone which was designated for an integrated rural-village development plan in 2004. And a result of analysis for project contents priorities by hierarchy analysis method showed the Regional capability reinforcement is selected for the most important project content by 3 stakeholders who are specialists (514pts.), Korea Rural Community Corporation staffs (694pts.), local government officers (688pts.)

농촌 장수마을 공간계획을 위한 기초연구 (A Study of Planning for the Elderly in Korean Rural Community)

  • 김묘정;김혜민;조순재
    • 농촌계획
    • /
    • 제13권2호
    • /
    • pp.107-120
    • /
    • 2007
  • The purpose of study was planning to a rural community space plan for revitalization of aging in rural society and activity of rural older adults. The rural community type was divided 5 categories by local topography characteristics and road system. According to 5 categories, the rural community space plan was consisted of space plan such as consideration for a rural topography characteristics and activity plan by space which analyzed a relations with rural resource and activity of rural older adults. Results from the rural community planning showed that to improve quality of life and to increase in economic productive activity for rural older adults, moreover to lead a retired oppidan migrate from city to country and to make full use of oppidan's intellectual capacity resource.

수도권 신도시 개발과 국토균형발전 방안에 관한 기초연구 (A Basic Study on balance development of national land planning and developing of new-town at the national capital region)

  • 이혜인;박인숙;이윤선;김주형;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.535-538
    • /
    • 2007
  • 80년대부터 정부는 국토의 균형발전을 위하여 국토종합개발계획을 수립하여 수도권의 집중 억제와 지역균형발전을 지역개발정책의 기본 목표로 설정하고 추진하고 있다. 그러나 최근 추진되는 수도권의 신도시 개발계획은 수도권 주택공급을 통한 주택가격 안정을 위한 개발계획으로 비춰지고 있으며, 개발계획 수립 전 국토균형발전에 상반되는 정책추진에 따른 개발계획의 적합성 논의, 충분한 사전 계획, 해당 지자체와 사전 협의, 지역주민 여론 수렴, 환경영향평가등 각종 영향평가 결과 등을 반영하지 못하고 추진되는 실정이다. 따라서 국토의 균형발전을 추구하는 정책과 균형발전에 저해 될 수 있지만 수도권 주택부족 해소와 수도기능의 원활안 추진을 위한 신도시 개발 정책을 추진할 때 고려해야 할 사항을 제언하고자 한다.

  • PDF

Strategic Environmental Assessment for the Master Plan of Tonkin Gulf Coastal Economic Belt Development: Lesson Learnt

  • Le, Trinh
    • 환경영향평가
    • /
    • 제18권6호
    • /
    • pp.419-427
    • /
    • 2009
  • Methodology and application of Strategic Environmental Assessment (SEA) for policies, plans, and programs are still new approach in Vietnam. With a support from Vietnam-Swedish Project (SEMLA) and Ministry of Natural Resources and Environment (MONRE), SEA for the Tonkin Gulf Coastal Economic Belt Development Plan was conducted in 2008. Lessons obtained from this SEA may contribute to improving methods and practicing SEAs for regional development. The main lessons summarized in this paper are: (i) close cooperation between the planning and environmental teams from the beginning phase of a master plan; (ii) SEA should focus not only on impacts to the natural environment but also on main issues of socio-economic aspects; (iii) approaches and methods used in SEA should be appropriate to properly predict the impacts at regional-levels and cumulative impacts; (iv) a good SEA study may be achieved when detailed data on the environment and socio-economy of the study area are available and have active engagement of stakeholders, including project affected sectors, ecologists, planners, policy makers, etc. This paper is useful for whom, those work in SEA in regional development.

건축물의 최유효 개발계획 수립을 위한 기획업무 절차에 관한 연구 (A Study on the Property Planning Process for the Highest and Best Use Development)

  • 김소연;박영기
    • KIEAE Journal
    • /
    • 제7권5호
    • /
    • pp.115-120
    • /
    • 2007
  • The purpose of the study is to establish a concept of property development planning process and factors by analyzing the several case studies, which prior proposed the highest and best use development of property. The value of property is dependent on the circumstances and the timing. Real property development is essential to develop in the highest and the best. The prior concepts of the highest and best use focused on the real estate appraisal, but these studies aroused an interest that related the highest and best use concept as a determinant of property development. As a results, this study suggests the process and the check points of property development planning phase. The first step is having a thorough grasp of the status of property. The Second step is the circumstantial analysis including legal restriction, locational environment, real estate market and economic conditions. The next step is, in accordance with these analysis, setting up the development concept and alternatives. Through the feasibility studies, we can make a choice the highest and best use development plan. In these days, the importance of development strategies such as design exceptionality and plan management are increased. Therefore, the integrated plan for the property development is very important.

한국전통민가주택의 친환경적 특성에 관한 연구 -낙안읍성 민속마을을 중심으로- (A Study on the Environmental-friendly features at Korean Traditional Houses -Focused on Nak-An folk village-)

  • 주급원;최만진
    • 농촌지도와개발
    • /
    • 제17권3호
    • /
    • pp.549-585
    • /
    • 2010
  • Our global environment and ecology are now facing crisis due to the hrincreased waster materials caused by reckless abuse of resources and energy with the continuous development of our society. Therefore the whole nation should recognize the environmental pollution seriously and should accept sustainable development principles. The country is looking for actions against the problems in various ways. The introduction of reckless and duplicating western housing plan should be ceased but a new housing plan conforming to our nature should be found. In this regard, it is believed that it is a good alternative to succeed tradition and identity of Korean housing plan and suggest a new plan for better ecological housing by analyzing the environment friendliness of our traditional Korean houses. In this study, the traditional residential components were divided into physical and design aspects and the characteristics of environment friendly Korean traditional houses were analyzed.

Application of visual decision making process in the development of business process reengineering vision and implementation plan

  • Kim, Jae-Kyeong;Sung, Tae-Kyung
    • 경영과학
    • /
    • 제14권2호
    • /
    • pp.185-198
    • /
    • 1997
  • Business process reengineering(BPR) aims at a radical redesign of our business processes in order to achieve dramatic improvements in their performance. However, the fact that many BPR projects have failed hesitates the companies who have started to use BPR or who are planning to do so. Implementing a radical plan from a cross-functional perspective needs a more careful consideration of process vision, preventive measures and contigency plan. Our research suggests to use a visual decision making process (VDMP) in the development of a process vision and implementation plan. A BPR project of Carlaon School of Mnagement (CSOM) at the University of Minnesota is illustrated to show our suggested methodology.

  • PDF

Case-Based Reasoning을 이용한 자동공정계획 시스템의 구축 (Development of A CAPP System Based on Case-Based Reasoning)

  • 이홍희;이덕만
    • 산업경영시스템학회지
    • /
    • 제21권46호
    • /
    • pp.181-196
    • /
    • 1998
  • The aim of this research is the development of a CAPP system which can use the old experience of process planning to generate a process plan for a new part and learn from its own experience using the concept of stratified case-based reasoning(CBR). A process plan is determined through the hierarchical process planning procedure that is based on the hierarchical feature structure of a part. Each part and case have their own multiple abstractions that are determined by the feature structure of the part. Retrieving the case in stratified case-based process planning is accomplished by retrieving the abstraction that is most similar to the input part abstraction in each abstraction level of the case-base. A new process plan is made by the adaptation that translates the old case's process plan into the process plan of a new part. Operations, machines and tools, setups and operation sequence in each setup are determined in the adaptation of abstraction using some algorithms and the reasoning based on knowledge-base. By saving a new part and its process plan as a case, the system can use this new case in the future to generate a process plan of a similar part. That is, the system can learn its own experience of process planning. A new case is stored by adding the new abstractions that are required to save as the new abstraction to the existing abstractions in the case-base.

  • PDF

난개발과 농어촌지역 토지이용 관련법규에 관한 연구 (A Study on disorderly developments and the laws related to land use in rural areas)

  • 이을규
    • 한국농촌건축학회논문집
    • /
    • 제15권2호
    • /
    • pp.53-60
    • /
    • 2013
  • In recent years, several problems occur due to irrational development in rural areas. The first, disorderly development and Encroachment of farmland, Small factory built in rural areas leads to a lack of infrastructure. it is the damage factors of good scenery in the rural areas. Water pollution and environmental pollution from the accommodations and restaurants in the good scenery area is serious. To solve this problems, we should establish the systematic land use plan and landscape plan, and integrated spatial and business plan in rural areas. In order to increase the effectiveness of land use planning in rural projects, We should establish the land use plan in rural areas of the city, state, and national levels of regional plan. We need to prescribe in "National Land Use Planning Law" the facilities, can install it according to the characteristics of rural land programming. we can prescribe the detail regulations by "Rural Maintenance Law". In order to solve the problems the lack of professionalism of the current agricultural policies of the Review Committee, We need to consider a new "rural planning committee" consisting.

Hemeroby를 이용한 자연환경평가 및 환경계획 - LG 빌리지의 사례를 중심으로 - (Application of Hemeroby for Environmental Assessment with Environmental Planning - Focused on the Case“LG Village”-)

  • 김혜주;조수경
    • 한국환경생태학회지
    • /
    • 제12권3호
    • /
    • pp.253-258
    • /
    • 1998
  • 개발이 허용된 지역이라도 개발로 인해 발생되는 기존의 환경파괴에 대해 외국의 경우 보상계획을 통한 개발 계획을 수립하는 것이 보통이다. 그러나 국내의 경우 개발지역내의 환경계획은 주로 개발용도에 따른 법적 테두리안에서 녹지면적을 채우는 것으로 일관하고 있다. 따라서 본 연구에서는 대학 프로젝트의 한 사례를 중심으로 대상지의 환경을 Hemeroby등급을 이용하여 평가하고 파괴에 따른 보상계획을 제시하였다. 대상지는 수원시 권선구 금곡동에 계획된 대단위 아파트단지 개발지구이다. 우선적으로 개발전의 대상지를 Hemeroby등급으로 평가한 후 아파트단지 개발안, 즉 LG빌리지안을 Hemeroby등급으로 비교평가하여 LG빌리지안에서 보상되지 않은 기존 환경 파괴에 따른 보상안을 양적인 측면에서 산출하였다. 산출근거는 개발전의 대상지는 $\beta$-/$\alpha$-euhemeroby가 전체의 80.1%였는데 LG개발안은 $\beta$-/$\alpha$-euhemeroby가 43.7%로 낮아지면서 meta-hemeroby가 개발전 17%에서 56.3%로 증가하였으므로 보상안은 LG개발안의 건축물을 수용하되, $\beta$-/$\alpha$-euhemeroby비율을 올릴 수 있는 보상계획, 즉 하천복원, 지상주차장의 녹화, 옥상녹화 및 절토면의 녹화 등을 제안하였다.

  • PDF