• 제목/요약/키워드: 8 day interval flow

검색결과 18건 처리시간 0.024초

낙동강 유역관리를 위한 부하량 유황곡선의 적용 가능성 (Applicability of Load Duration Curve to Nakdong River Wateished Management)

  • 한수희;신현석;김상단
    • 한국물환경학회지
    • /
    • 제23권5호
    • /
    • pp.620-627
    • /
    • 2007
  • In this study a general analysis method for watersheds with the entire runoff conditions and corresponding water quality is proposed and its applicability based on the currently available information is investigated. Using the 8-day-interval data set of runoff and water quality observed by Nakdong River Environment Research Center, the flow duration curve and discharge-load relation curve for each unit watershed are established, then the load duration curve is finally constructed. This paper discusses how the load duration curve can be used in the assessment of TMDL. The entire Nakdong river watershed is also divided into prior managing areas of point sources or non-point sources in a way of general management. It is thought that LDC can be a great tool for visualizing overall probabilities of current water quality and thus for the TMDL management.

북한강 율문천 소유역에서 수질 변화와 농업활동에 의한 N, P 부하량 (Changes of Stream Water Quality and Loads of N and P from the Agricultural Watershed of the Yulmunchon Tributary of the Buk-Han River Basin)

  • 정영상;양재의;박철수;권영기;주영규
    • 한국토양비료학회지
    • /
    • 제31권2호
    • /
    • pp.170-176
    • /
    • 1998
  • 1997년 5월 20일에서 8월 30일까지 북한강 지천인 율문천의 수위변동과 유속을 측정하고, 수문 자료 수집과 오염부하량을 예측하고 9개 지점에서 수질시료를 시기별로 채취하여 분석하였다. 율문천 소유역은 임야 60%, 주거지와 밭 20%, 논 20%였으며, 농가수 366 가구, 비농가수 322가구, 그리고 인구는 2,622명이었다. 조사기간(1997년 5월 20일~8월 30일)중 유역의 총강수량은 18.000 천$m^3$였고, 하루 최대 유출일은 7월 1일로 129.8 천$m^3$, 최소 유출일은 8월 17일로 0.4 천 $m^3$가 유출되었으며, 전체 유출율은 72% 이었다. 조사 기간중 모든 지점에서 $NO_3-N$ $1.4{\sim}12.6mg\;{\ell}^{-1}$, $NH_4-N$ $0.84{\sim}2.52mg\;{\ell}^{-1}$, T-P는 불검출~$2.20mg\;{\ell}^{-1}$. T-N은 $8.40{\sim}27.30mg\;{\ell}^{-1}$의 범위를 보였다. 이에 따른 T-N 부하량은 최대 $1,512kg\;day^{-1}$, 최소 $5kg\;day^{-1}$, 그리고 T-P의 부하량은 최대 $67.4kg\;day^{-1}$, 최소 $0.3kg\;day^{-1}$로 계산되었다. 강수중 $NO_3-N$의 농도는 $0.7mg\;{\ell}^{-1}$, $NH_4-N$$1.12mg\;{\ell}^{-1}$이었고, 농업지대 유출수는 각각 8.5, $2.0mg\;{\ell}^{-1}$로 강수의 13.5배와 1.8배 수준을 나타냈다. 소유역의 토양유실 예측량은 연간 12,635 Mg 으로 추정되고, 농업부분에서 N부하량은 101,210 kg로 전체 N부하량의 52.3% 였으며, 특히 토양유실과 비료에 의한 오염부하가 42%로 높게 추정되었다.

  • PDF

확률 강우량을 이용한 고속도로 토석류 조기경보기준 제안 (1) : 강우기준 제안 (Proposal of Early-Warning Criteria for Highway Debris Flow Using Rainfall Frequency (1): Proposal of Rainfall Criteria)

  • 최재순
    • 한국방재안전학회논문집
    • /
    • 제12권2호
    • /
    • pp.1-13
    • /
    • 2019
  • 본 연구에서는 강우재현주기의 내용을 포함하고 있는 고속도로 토석류 평가를 기초로 하여 고속도로 조기경보 시스템 개발을 위한 강우기준을 제안하였다. 강우기준은 주의경보와 위험경보로 구분하여 선행연구결과를 기초로 하여 적절한 강우기준이 추천되었으며 추천된 기준은 재현주기에 따른 토석류 평가등급별 1시간, 6시간, 3일 확률 강우량이다. 이때, 연구대상은 강원지역으로 하였으며 강원지역 8개 관측소의 확률 강우량을 수집하였다. 또한, 8개 자료의 확률 분석을 통해 강원지역 고속도로 토석류 조기경보에 이용될 1시간, 6시간, 3일 강우기준에 대한 확률분포를 산정하였다. 또한, 강우기준으로 선택된 3가지 강우정보와 실제 토석류 피해와의 연관성 분석을 실제 토석류가 발생한 강원지역 고속도로 7개 노선, 12개 지점의 피해발생시의 강우자료를 수집하여 검토에 이용하였다. 이때, 확률분포 상의 강우기준을 평균값과 하한값을 구분하여 검토하였다. 검토결과, 재현주기별 강우량의 하한값을 사용하는 경우가 실제 토석류 피해시의 상황을 잘 모사하는 것으로 나타났다.

장기간 유량측정 자료를 이용한 경안천의 부하지속곡선 특성 (Analysis of Load Duration Curve Using Long Time Flow Measurement Data of Kyeongancheon)

  • 노창완;권필상;정우석;이명구;조용철;유순주
    • 환경영향평가
    • /
    • 제28권1호
    • /
    • pp.35-48
    • /
    • 2019
  • 장기간 유량측정과 수질분석은 수질오염총량관리제도 유역의 목표수질과 허용 부하량을 결정하기 위하여 필요하다. 목표수질 달성여부를 평가하는데 사용되는 부하지속곡선은 유량과 수질간의 관계를 설명하고, 유량조건별 오염부하량 특성을 평가한다. 경안천의 부하지속곡선은 경안천 목표수질과 2006년부터 2015년까지 연평균 8일 간격으로 측정한 유량자료를 이용한 유량지속곡선에 의해서 작성되었다. 연구결과 경안천은 갈수량 구간에서 목표수질을 초과하여 점오염원에 대한 관리가 필요한 것으로 분석되었다. 또한, 연중 3월에서 6월 사이의 기간 동안에만 목표수질을 초과하는 것으로 나타나 이 기간 동안 경안천의 목표수질을 달성하기 위한 체계적인 유역 관리가 필요한 것으로 판단된다.

GSTAR-1D 모형의 금강 하상변동예측 적용성에 관한 연구 (A Study on the Applicability of GSTAR-1D to the Riverbed-Level Variation in the Geum River)

  • 정성영;박봉진;정관수
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2006년도 학술발표회 논문집
    • /
    • pp.1611-1615
    • /
    • 2006
  • 본 연구에서는 GSTAR-1D 모형을 적용하여 대청 조정지댐과 공주 수위표 구간에 대해 1988년부터 2001년까지의 하상변동을 모의하고, 국내 적용성을 평가하였으며, 2002년부터 2017년까지의 장기 하상변동을 예측하였다. GSTAR-1D에서 제공하는 14개 유사이송공식에 대한 모의결과, Acker's & White 공식이 상대적으로 가장 안정적으로 산정되었다. 안정 계산시간 간격은 만제유량$(1,000m^2/s)$은 7일, 일최대유량$(4,273m^2/s)$은 3일, 시간최대유량$(7,605m^2/s)$과 최소유량$(8.5m^2/s)$은 1일로 분석되었다. 1988년부터 2001년까지의 하상변동 모의결과와 실측자료를 비교 평가한 결과, 대청 조정지댐${\sim}$매표수위표구간의 하상저하 모의결과는 하상토의 원인으로, 매포수위표${\sim}$공주수위표 구간의 하상저하모의결과는 대규모 골재채취에 의해 발생한 것으로 분석되었다. 2002년부터 2017년까지의 하상변동 예측결과는, 대청 조정지댐${\sim}$금남교 구간은 대부분 현재의 하상이 유지될 것으로 분석되었으며, 매포수위표${\sim}$공주수위표구간은 일부 구간에서의 하상저하가 예상되었으나, 인위적인 하상변동이 아니면, 전반적으로 안정한 하상을 유지할 것으로 분석되었다.

  • PDF

해수 순환 여과 사육 시스템에서 넙치 사육 시험 (Culture of the Olive Flounder, Paralichthys olivaceus in a Marine Recirculating System)

  • 방종득;최용석;서형철
    • 한국어병학회지
    • /
    • 제18권1호
    • /
    • pp.91-97
    • /
    • 2005
  • 침지식 해수 순환 여과 사육 시스템에서 여과조 숙성과 넙치의 성장을 조사하였다. 생물 여과조가 숙성되는데 60일이 소요되었다. 사육 기간 중 수온은 17.5-25.1$^{\circ}C$, 염분은 30.1-33.5ppt, 용존산소는 7.25-10.49ppm, pH는 8.1-7.5를 유지하였다. 사육수는 매일 5% 범위에서 환수하였으며 사육수의 암모니아성 질소 및 아질산성 질소 농도는 각각 0.096-0.315mg/L 및 0.015-0.504mg/L이었으나, 질산성 질소는 질산화 과정이 지속되어 그 농도가 2.530mg/L에서 39.517mg/L까지 증가하였다. 사료 효율은 64.1-69.8% 이었고, 사육 밀도는 시험 종료 시 15.9kg/$m^2$이었다. 사육기간 중 Vibrio spp.는 검출되었으나 질병 발생에 의한 폐사는 없었으며 생존율은 97.1%를 나타내었다.

멀칭에 따른 지온변화 모델의 작성 및 토양온도의 추정 (Simulation Model for Estimating Soil Temperature under Mulched Condition)

  • 최일선;이변우
    • 한국농림기상학회지
    • /
    • 제1권2호
    • /
    • pp.119-126
    • /
    • 1999
  • 대기 온도, 대기 일사량, 풍속, 대기 수증기압 등의 기상자료, 멀칭재료와 토양의 광학적 특성 및 열적 특성을 입력자료로 하여 토양 표면의 에너지 수지식과 토양 열흐름 방정식을 수치해석하여 멀칭한 토양의 온도를 추정하는 모델을 작성하였으며 또한 실측자료를 이용하여 모델을 검정하였다. 모델에 의한 지온의 추정에 있어서 토양온도의 초기 치는 시작일의 50cm깊이의 실측지온으로 하였으며, 계산은 0시에 시작하여 10분 간격으로 하였다. 모델은 지온의 시간 및 토층에 따른 변화를 잘 묘사하였다. 모델에 의해 추정된 값과 실측치와의 상관관계는 무멀칭의 5 cm 및 l0 cm에서 상관계수(n=720)가 각각 0.961, 0.966이었고, 같은 층위의 종이멀칭에서는 각각 0.969, 0.945이었고, 흑색 폴리에틸렌 필름 멀칭에서의 상관계수는 각각 0.915, 0.938이었다. 모델에 의해 추정된 값들이 실측치$\pm$2.0$^{\circ}$C 범위안에 들어가는 수가 전체 추정치중에서 차지하는 비율은 무멀칭처리의 5 cm 및 10 cm에서 각각 97.4%, 98.5%이었고, 종이 멀칭에서는 각각 95.8%, 97.4%이었으며, 흑색 폴리에틸렌 필름 멀칭에서 70.1%, 92.6%이었다. 이상의 결과에 의하면 멀칭에 따른 지온을 대체로 잘 묘사하는 것으로 판단된다. 다만 야간 지온추정에서 오차가 다소 컸는데 이는 야간의 대기 장파복사의 평가가 어렵기 때문이며 이에 대한 보완이 필요하다.

  • PDF

단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산 (Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve)

  • 최귀열
    • 한국농공학회지
    • /
    • 제7권1호
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF