• 제목/요약/키워드: 500MW Thermal Power Plant

검색결과 35건 처리시간 0.13초

3차원 모델을 활용한 발전설비 교육컨텐츠 개발 (Education Contents Development that Use Thermoelectric Power Plant Generation Facility Third Dimensional Model)

  • 김석복;백남호;손광식;김주석;문승재;이재헌
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2008년도 춘계학술대회논문집
    • /
    • pp.362-368
    • /
    • 2008
  • The purpose of this is providing employees who take charge of operation and maintenance at power plant with education contents that can be used for self-studying and on the job training through their computers. We developed the education contents for making actually application possible using this piping and instrument diagram(P&ID), operation and maintenance procedure, unit specification and material of 500MW thermal power plant those include unit equipment 3-dimension animation, character and narration performance considering making teaching plan, flexibility, extension, reuse, maintenance and focusing on user. Specially, we developed the flash type education contents about power plant operation based on the plant 3-dimension animation and the spot real picture concerned about new generation trend for power plant incoming employees actual knowledge. in addition, this contents apparently contributed to improve the level of employees technical power as distributed to employees.

  • PDF

1000MW 보일러 프로세스의 모델링과 데이터 추출 및 시뮬레이션 (Simulation and Data Sampling Modelling for 1000MW Boiler Process)

  • 박두용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 심포지엄 논문집 정보 및 제어부문
    • /
    • pp.301-302
    • /
    • 2007
  • Maximum power consumption was up to 6,228kW in the summer of 2007 due to steady development of industry as well as increased demand of individual. Twenty fossil-Fired Thermal Power Plant for 500MW were underconstructed at present. KEPRI(Korea Electric Power Research Institute) manage 'Development of Advanced Fossil-Fired Thermal Power Generation System' project to construct high efficient power plant of 1000MW capacity for preparing increased demand of power. Design of control logic and data sampling were explained and high efficient control logic was simulated in detail in 'The Development of Next Generation Power Plant Instrument and Control System'(sub-project of 'Development of Advanced Fossil-Fired Thermal Power Generation System' project).

  • PDF

500 MW 화력발전소 고압 증기 배관 손상 원인 분석 (Failure Analysis on High Pressure Steam Piping of 500 MW Thermal Power Plant)

  • 김정면;정남근;양경현;박민규;이재홍
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제5권4호
    • /
    • pp.323-330
    • /
    • 2019
  • 500 MW 표준 석탄화력발전소는 국내에서 가장 큰 용량의 규격화된 발전소로써 20년 넘게 국내 전력생산에 중추적인 역할을 수행하고 있다. 장기간 사용으로 인한 경년 열화와 더불어 최근 석탄화력발전소의 대기오염 문제가 대두되면서 석탄화력발전소 가동률 제한 정책에 따른 잦은 기동·정지에 의해 발전 설비의 고장 확률이 증가하고 있다. 그 중 증기 배관은 보일러에서 만들어진 고온·고압의 증기를 전력생산을 위해 터빈으로 이송시키는 중요한 역할을 하는 설비로 최근 국내 대용량 발전소 증기 배관의 고장 사례가 빈번하게 발생하고 있다. 이에 본 연구에서는 국내 500 MW 표준 석탄화력발전소 주증기배관 연결 용접부에 반복적으로 발생된 손상에 대해 손상 해석을 수행하였다. 동일 규격의 타 발전소에서 발생될 수 있는 고장의 사전 예방을 위해 균열부 금속 조직 분석과 배관 응력 해석을 통해 배관 지지 구조에 의한 고 응력에 의해 발생된 원인을 규명하고 고 응력부 응력 저감을 위한 지지 구조 개선 방안을 제시하였다.

500MW 표준석탄화력발전소의 환경안전우선 설비운영개념 도입방안 고찰 (Study of the Environment Priority Facility Operation Concept of 500MW Standard Coal Thermal Power Plant)

  • 이갑주;정진도;김산
    • 대한안전경영과학회지
    • /
    • 제24권2호
    • /
    • pp.1-9
    • /
    • 2022
  • In korea, 500MW standard coal fired power plants were designed and operated for the initial base load, so facility stability was prioritized from facility problem to treatment, but now we needed to research for minimizing greehouse gas emissions at the operation of coal fired power plants. research on various facilities and technologies was actively conducted to reduce environment pollutants was drastically reduced, but research and attempts on coping measures in the event of a reduction facility problem were in sufficient. this study considered investigated ways to minimized pollutants by quickly responding to logic development and application of the load runback concept in case of serious problems with environmental pollutant reduction facilities such as NOx reduction selective catalytic reduction facilities, SOx reduction wet flue gas desulpherisation facilities, and TSP(Total Suspended Particles) collection low temperature electric precipitator.

500MW 화력발전소 저압터빈 Hood 공진 특성에 관한 연구 (Study on vibration characteristics of low pressure turbine hood resonance in a 500MW thermal power plant)

  • 조철환;조성태;구재량;김형석
    • 동력기계공학회지
    • /
    • 제17권3호
    • /
    • pp.23-27
    • /
    • 2013
  • In this research paper, we study on how to decrease the high vibration of turbine hood casings which are main facilities of power generation industry. Cause of Standard coal-fired power 500MW facilities turbine hoods' high vibration is that Natural frequency of hood casing designed in near domain frequency, when they are making hoods. We investigate to reduce high vibration at hood casing. We use FEM method to found how to avoid resonance, and test to confirm that our FEM result. We Finally attach minium mass plate at hood casing to avoid resonance and high vibration reduce lower $100{\mu}m$.

500 MW급 텐덤형 스팀 터빈 로터의 고온 열화평가 (Evaluation of the High Temperature Degradation of the Rotor of a 500 MW Tandem Steam Turbine)

  • 구대환;유호선;문승재
    • 플랜트 저널
    • /
    • 제10권1호
    • /
    • pp.40-46
    • /
    • 2014
  • 500 MW급 석탄화력발전소인 당진화력 4호기 텐덤형 증기 터빈 로터의 고온부위 재질열화를 평가하기 위하여 고중압 터빈 로터의 고온증기가 통과하는 부위인 로터의 고압 터빈 입구 측과 중압 터빈 입구에 대해서 표면복제 관찰을 통해서 금속조직의 크리프 기공 성장 및 미세조직 변화를 분석하였다. 연구결과, 74,628시간 사용된 당진화력 4호기 고중압 터빈 로터의 미세조직 열화정도는 핀란드 Technical Research Centre 미세조직열화등급 기준으로 B등급이다. 그리고 Neubauer 크리프 기공 평가를 통해서 잔여수명은 201,523시간 이상으로 판단된다.

  • PDF

석탄 화력발전소 송풍기 맥동감시장치 운전을 위한 제어로직 개발 (Development of Control Logic for Operation of Fan Stall Warning Equipment Used in Coal-Thermal Power Plant)

  • 노용기;조현섭;장성환
    • 한국산학기술학회논문지
    • /
    • 제7권5호
    • /
    • pp.837-846
    • /
    • 2006
  • 본 논문에서는 석탄 화력발전소(500[MW]) 보일러의 통풍계통에 적용되는 축류형 송풍기가 정상 운정 중 맥동과 같은 특수한 현상이 발생하게 되어 비정상적으로 운전함으로써 날개를 파손시키게 된다. 이러한 비정상 운전을 방지하기 위해 기존의 맥동 감시 장치에 본 연구에서 제안하는 제어 로직을 적용한 시스템에 대해 현장 실험을 통한 신뢰성 평가를 하였다.

  • PDF

변압운전 방식의 500MW 초임계압 석탄 화력발전소 터빈 우회계통에 제어에 관한 고찰 (A Study on Turbine Bypass System in a 500MW Rated Coal Fired Supercritical Thermal Power Plant with Sliding Pressure Operation)

  • 최인규;김종안
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.1663-1664
    • /
    • 2008
  • Many years ago, most of thermal power plants built in this country were of subcritical pressure, of medium or small size, of constant pressure operations and of drum type steam generators with circulation type boilers. But, nowadays almost all of them were of high efficiency, of supercritical pressure, of big capacity, of sliding pressure operations, and of once through type steam generators. Presently built once through boilers introduce turbine bypass systems to variable pressure operation which eliminates unexpected materials in boiler tube during startup, minimizes fuel loss by short startup period and eventually improve both total efficiency and power system stability.

  • PDF

기력발전소 터빈조속기 제어로직 개선에 의한 발전기 부하추종성 향상 (계통주파수저하방지) (Load Following Operation Improvement by Governor Control Logic Modification of Thermal Power Plant (System Frequency Drop Prevention))

  • 이종하;김태웅
    • 전력전자학회논문지
    • /
    • 제11권4호
    • /
    • pp.302-306
    • /
    • 2006
  • 기력발전소의 부하추종성능의 향상은 계통의 전력품질에 지대한 영향을 미치기 때문에 이를 위해서는 먼저 보일러, 터빈, 조속기 시스템과 제어알고리즘에 대한 분석이 필히 선행되어야 한다. 기력발전설비는 다양한 제어가구들 에 의해 운영되고 있고 조속기가 고장 난 경우에는 문제를 해결하는데 많은 시간이 필요하여 발전설비를 정지하지 않고서는 메커니즘 정비가 불가능하다. 계획되지 않은 발전시스템의 정지는 전력발전의 감소로 인해 경제적인 문제뿐만 아니라 전력공급의 차질에 지대한 지장을 주기 때문에 충분히 고려할 사항이다. 본 논문에서는 표준석탄화력 500MW 발전설비 ( 삼천포화력발전소 )에 있어서 계통주파수가 과다하게 장시간 저하될 경우에 기력발전기 제어특성이 나빠져 발전기의 출력이 저하되는 데 이에 대한 현상을 추이분석과 함께 제어로직의 분석 및 개선을 통해 계통 주파수가 저하되는 것을 방지하였고 이에 대한 사례를 소개한다.

통합적 엑서지에 의한 발전 플랜트의 열경제학적 해석 (Thermoeconomic Analysis of Power Plants with Integrated Exergy Stream)

  • 김덕진;이현수;곽호영
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2000년도 춘계학술대회논문집B
    • /
    • pp.871-878
    • /
    • 2000
  • Exergetic and thermoeconomic analysis were performed for a 500-MW combined cycle plant and a 137-MW steam power plant without decomposition of exergy stream of matter into thermal and mechanical exergies. The calculated costs of electricity are almost same within 0.5% as those obtained by the thermoeconomic method with decomposition of exergy into thermal and mechanical exergies of the combined cycle plant. However for the gas-turbine cogeneration plant having different kinds of products. the difference in the unit costs of products, obtained from the two methodologies is about 2%. Such outcome indicates that the level at which the cost balances are formulated does not affect the result of thermoeconomic analysis, that is somewhat contradictory to that concluded previously.

  • PDF