The improvement of load following operation of the thermal power plant is influenced to the electrical quality. Analysis of boiler, turbine, and governor system, and the study of control algorithm are necessarily preceded. The thermal power plant is operated by various control systems. In the case of faulty governor system, it takes long days to solve the problem and impossible to repair the mechanism without outage. A non-planned outage is taken into consideration because of economical power production. The paper introduces the followings; In case of system-frequency drop during long term, at 500MW thermal power plant, the generator output was drop. To clear this problem, the control logic is modified with analysis of trend and control algorithm. As a result system frequency drop is prevented during the long tenn and the electric grid operation is improved.
Keywords
Power plant; Governor; Control logic; System-frequency; Speed droop curve;
Citations & Related Records
연도 인용수 순위
  • Reference
1 '삼천포화력 제5, 6호기 보일러 제어로직 해설집,' 한국전력공사, 삼천포화력본부, 2000
2 한국남동발전(주) 삼천포화력본부, 터빈주제어설비 정비절차서, 2003
3 '계통주파수 급강하시 발전기 출력저하현상 방지를 위한 제어로직 개선(안),' 한국남동발전(주) 보고서, 2004
4 이종하, '기력발전소(중유 및 석탄) 조속기의 제어개선에 의한 부하추종성능 향상,' 경상대학교, 석사논문, 2005.08
5 전력거래소, 전력시장 운영규칙, 2002
6 '제어계 특성시험 대상 발전기 선정,' 한국남동발전(주) 공문, 2004
7 '터빈 부하추종성 시험 개요,' 맥스파워(주), 2004