• Title/Summary/Keyword: 4D 시스템

Search Result 3,802, Processing Time 0.031 seconds

Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

Application Technology of Multi-texturing for Effective Representation of Natural Ground on the 4D System for Civil Engineering Projects (토목공사용 4D 시스템의 효율적인 자연지형 표현을 위한 멀티텍스처링 기법 적용기술 개발)

  • Kang Leen-Seok;Kwak Joong-Min;Jee Sang-Bok;Kim Chang-Hak;Lee Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.349-352
    • /
    • 2004
  • 4D system has applied to construction project as a management tool after the late 1990's. Various 4D systems have been developed, however they have some problems that should be improved. Especially, the 4D system for civil engineering project needs synthesized 3D model between natural ground condition and physical facility type. It is a different problem comparing with the system for building project. 1'his study suggests an automatically synthesizing methodology between ground triangulate network and design triangulate network. Furthermore the study develops an application methodology of multi-texturing technique defined in virtual reality modeling language (VRML) for skipping the 3D model synthesizing process from the 4D model development processes. The suggested methodology is applied to the prototype of real 4D system. The proposed technique for 3D modeling may be used as an essential methodology for developing 4D system for civil engineering projects.

  • PDF

A Study on 4D Virtual Training System for Fire Prevention (화재재난 예방을 위한 4D 가상훈련시스템에 관한 연구)

  • Song, Eun-Jee
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2018.10a
    • /
    • pp.410-413
    • /
    • 2018
  • 수년전 세월호 참사로 인해 안전수칙에 대해 경각심을 가지게 된 사회 분위기를 반영하여, 학생들과 일반인을 대상으로 하는 재난 대응 교육 시스템이 매우 시급하게 요구되고 있다. 본 연구에서는 재난 가운데 가장 많이 발생하는 화재 재난에 대해 가상현실을 활용한 4D 재난 대응 훈련시스템을 제안한다. 기업이나 학교 기숙사 등에서는 매년 일정한 패턴(시나리오)의 소방훈련을 받는다. 그러나 이러한 훈련은 한 번에 많은 시간과 공간이 필요하며 년1-2회로서 효율적이지 못하다. 제안하는 시스템은 가상훈련 시스템으로서 실제와 같은 체험이 가능하고 시간과 공간을 절약할 수 있으며 수시로 효율적인 소방훈련을 받을 수 있는 몰입형 4D 가상체험 시뮬레이션이다. 기존의 가상훈련 시스템은 매우 고가의 장비들이 필요하나 제안하는 시스템은 보급의 용이성을 위해, 저가의 HMD(Head Mounted Display)와 트레드밀을 이용하여, 체험할 수 있는 가상현실 4D 몰입형 재난 대응 훈련 콘텐츠이다.

  • PDF

Development of Major Functions of Visualization System for Construction Schedule Data in Plant Project (플랜트공사 관리 효율화를 위한 공정정보 시각화 시스템의 주요 기능 구성방안)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Ji, Sang-Bok;Lee, Tae-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.66-76
    • /
    • 2008
  • Plant project is a complex project that consists of civil engineering, building, mechanical and electronic works. The schedule management is one of important factors in plant project because the construction duration of the project is very short comparing with the other construction projects. Specially, 4D CAD system needs to visualize construction schedule information in those complex projects. This study suggests methodologies for improving 4D CAD functions by considering those project characteristics. To develop a plant 4D CAD system, this study includes to develop new functions by analyzing actual schedule information from the plant construction sites.

An RFID and BIM based Simulator for Construction Material Logistics and Progress Management (RFID와 BIM을 활용한 건설 자재 물류 및 진도관리 시뮬레이터 개발)

  • Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.46-54
    • /
    • 2011
  • There have been research and developments for effective and efficient logistics and progress management in a construction project. Among them, RFID+4D has been developed for the supply chain management of long-lead item materials such as steel component, precast concrete component and curtain wall by integrating RFID with 4D CAD. And the feasibility of RFID+4D has been verified and validated and the benefits in terms of time and cost were shown in several case studies. However, the previous development of RFID+4D has not been adapted widely because of additional modeling cost, non-real time data update, additional labor for data update, and so forth. Therefore, this research has proposed a framework and process for solving these problems. And the web based simulation system has been developed and verified based on the proposed framework. The proposed framework and process can improve the existing RFID+4D system in a construction project by saving its operation cost and utilizing project information more efficiently and effectively. Also it is expected that the proposed framework could be applied to a method transferring design RIM data to construction BIM data.

A Study for Cyber Situation Awareness System Development with Threat Hunting (위협 헌팅을 적용한 사이버 상황인식 시스템 개발에 관한 연구)

  • Lee, Jaeyeon;Choi, Jeongin;Park, Sanghyun;Kim, Byeongjin;Hyun, Dae-Won;Kim, Gwanyoung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.21 no.6
    • /
    • pp.807-816
    • /
    • 2018
  • Threat hunting is defined as a process of proactively and iteratively searching through networks to detect and isolate advanced threats that evade existing security solutions. The main concept of threat hunting is to find out weak points and remedy them before actual cyber threat has occurred. And HMM(Hunting Maturity Matrix) is suggested to evolve hunting processes with five levels, therefore, CSOC(Cyber Security Operations Center) can refer HMM how to make them safer from complicated and organized cyber attacks. We are developing a system for cyber situation awareness system with pro-active threat hunting process called unMazeTM. With this unMaze, it can be upgraded CSOC's HMM level from initial level to basic level. CSOC with unMaze do threat hunting process not only detecting existing cyber equipment post-actively, but also proactively detecting cyber threat by fusing and analyzing cyber asset data and threat intelligence.

The design of 4S-Van for implementation of ground-laser mapping system (지상 레이져 매핑시스템 구현을 위한 4S-Van 시스템 설계)

  • 김성백;이승용;김민수
    • Spatial Information Research
    • /
    • v.10 no.3
    • /
    • pp.407-419
    • /
    • 2002
  • In this study, the design of 4S-Van system is discussed fur the implementation of laser mapping system. Laser device is fast and accurate sensor that acquires 3D road and surface data. The orientation laser sensor is determined by loosely coupled (D)GPS/INS Integration. Considering current system architecture, (D)GPS/INS integration is performed far performance analysis of direct georeferencing and self-calibration is performed for interior and exterior orientation and displacement. We utilized 3 laser sensors for compensation and performance improvement. 3D surface data from laser scanner and texture image from CCD camera can be used to implement 3D visualization.

  • PDF

Implementation of Customized 4D and 5D System based on BIM (BIM 기반 사용자 맞춤형 4D 및 5D 시스템 구현)

  • Lee, Jae-Cheol
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.55-61
    • /
    • 2016
  • BIM is a rising core technology for increasing the productivity of the AEC industry, but such a paradigm shift is placing excessive demand on the practice of small medium size enterprises. BIM has many useful functions that are difficult to imagine in 2D CAD but BIM programs and the system buildup cost are too expensive. Therefore, small medium size enterprises hesitate to apply BIM in their fields. In this study, a customized 4D and 5D system was implemented using the building information generated from basic BIM tools, such as Revit, MS Project, Navisworks, and Excel VBA's customizing process to review the schedule and verify the quantities according to the schedule. Those programs are so basic in BIM circumstances, that small medium size enterprises can be equipped without burden. As a result, essential building information for 4D and 5D system implementation was investigated and its customizing process was established.

Performance of M-ary OSTBC MIMO System (M-ary OSTBC MIMO 시스템의 성능 연구)

  • Hong, Young-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.6269-6273
    • /
    • 2015
  • Performance of the Alamouti algorithm based M-ary $2{\times}N$ OSTBC(Orthogonal Space Time Block Coded) MIMO(Multi Input Multi Output) system has been simulated varying two main parameters - the number of constellation(M), and the number of receiving antennas(N). Computer simulation has also been carried out using Matlab software for performance comparison between $2{\times}N$ MIMO and MRC(Maximal Ratio Combining) diversity antenna system to evaluate the degree of enhancement achieved through the use of Alamouti $2{\times}N$ MIMO. Under 10 dB EbNo QPSK scenario, $2{\times}1$ MIMO brought 4.2 dB BER improvement over single antenna system and $2{\times}2$ MIMO resulted in 7.4 dB BER improvement over $1{\times}2$ MRC.

Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project (건설시설물 공정정보 시각화를 위한 4D CAD시스템의 개발 및 적용사례 분석)

  • Kang, Leen-Seok;Yun, Seon-Mi;Kwon, Jung-Hui;Mun, Jin-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.373-380
    • /
    • 2007
  • Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.