• Title/Summary/Keyword: 3D pavement

Search Result 104, Processing Time 0.022 seconds

Performance Indicator and Threshold Value of National Highway Jointed Concrete Pavements (일반국도 줄눈 콘크리트 포장의 성능인자와 임계한도)

  • Yeo, Hyun Dong;Seo, Youngguk;Suh, Young Chan;Jeong, Jin Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3D
    • /
    • pp.279-288
    • /
    • 2010
  • Recently, researches on the performance warranty contracting has been going on to improve construction quality in road pavement area. The performance warranty contracting gives construction companies opportunity to select materials and methods freely while asks them to maintain a certain level of performance during a given period. To introduce the performance warranty contracting in Korea, lots of research results on performance indicator and threshold value of asphalt pavement have been made to be included in the warranty specification. However, research effort on the performance indicator and threshold value of concrete pavement which is commonly constructed in expressway and national highway has not been enough. In this study, the warranty duration, performance indicator, and threshold value of the concrete pavement were investigated by reviewing literatures on cases of the performance warranty contracting in European countries and states of the US. Major distresses influencing the performance of jointed concrete pavement were investigated and analyzed to be compared to the warranty duration, performance indicator, and threshold value of foreign countries.

An Evaluation of Orthotropic Steel Bridge Deck Pavement Behavior Using Wheel Load Testing and 3D Finite Element Analysis (윤하중 시험과 유한요소해석을 통한 강상판 교면포장의 거동분석 연구)

  • Kim, Tae Woo;Choi, Ji Young;Lee, Hyun Jong;Baek, Jongeun;Ohm, Byung Sik
    • International Journal of Highway Engineering
    • /
    • v.15 no.1
    • /
    • pp.103-110
    • /
    • 2013
  • PURPOSES: The objective of this study is to analyze and evaluate the behavior of orthotropic steel bridge deck pavement using three-dimensional finite element analysis and full-scale wheel load testing. METHODS: Since the layer thickness and material properties used in the bridge deck pavement are different from its condition, it is very difficult to measure and access the behavior of bridge deck pavement in the field. To solve this problem, the full-scale wheel load testing was conducted on the PSMA/Mastic bridge deck pavement and the deflection of bridge deck and horizontal tensile strain on top of pavement were measured under the loading condition. Three-dimensional finite element analysis was conducted to predict the behavior of bridge deck pavement and the predicted deflection and tensile strain values are compared with measured values from the wheel loading testing. RESULTS: Test results showed that the predicted deflections are 10% lower than measured ones and the error between predicted and measured horizontal tensile strain values is less than 2% in the critical location. CONCLUSIONS: The fact indicates that the proposed the analysis is found to be accurate for estimating the behavior of bridge deck pavements.

Comparison with Load Transfer Efficiency for Joint Types in Airport Concrete Pavements (줄눈형식에 따른 공항 콘크리트 포장 하중전달율 비교)

  • An, Ji-Hwan;Jeon, Sung-Il;Kwon, Soo-Ahn;Kim, Min-Woo
    • International Journal of Highway Engineering
    • /
    • v.16 no.3
    • /
    • pp.9-20
    • /
    • 2014
  • PURPOSES : This study is to compare load transfer efficiency of key joint and dowel joint for airport concrete pavement. METHODS : As AC150/5320-6D of FAA's [Advisory Circular] was changed into AC150/5320-6E, Key joint type of rigid pavement were excluded from Construction Joints. LTE(Load Transfer Efficiency) of dowel joint and key joint were compared by times and seasons through pavement temperature measurement, ocular investigation and HWD measurement. RESULTS : For the joint performance grade of No. 2(The second) runway of airport, 12% of poor rate was observed in key joint and 2% of poor rate in dowel joint. Poor rate of key joint was increased to 17%, if only No. 3~No. 6 slabs, which are mostly loaded from the airplanes, were applied for the study. In apron area, LTE poor rate of key joint was high in winter, and LTE poor rate of dowel joint was at least above 'Fair' grade. In summer, 'Fair' for key joint, 'Acceptable' for dowel joint appeared. CONCLUSIONS : As results, dowel joint was superior than key joint for LTE. Deviations of seasons and times were smaller in dowel joint's result. And LTE in winter was lower than LTE in summer.

An Experiment Study on the Structure-borne Noise Reduction of Building Nearby the Road by Using Ballast Mat Pavement Method (도상 매트 공법 도로포장에 의한 자동차 도로 인근 건축물의 고체전파음 저감효과에 관한 실험적 연구)

  • 이익주;유제남
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.14 no.11
    • /
    • pp.1153-1160
    • /
    • 2004
  • In contemporary society, vibration and noise in the road nearby buildings have become social problems as vehicles operation has increased. Especially. in the case of the building used to art performance, available suitability of the building is tested by the indoor noise class. Therefore, the Purpose of this paper is the measurement of the structure-borne noise of Seoul Art Center nearby Umyeonsan tunnel and analyzing the effects of countermeasure to it. To measure the effects of countermeasure, not only structure-borne noise is measured, but also the vibration is measured, before and after the construction of Pavement using pad and porous asphalt. Consequently, the sound pressure level in art center 1st floor is reduced after mat pavement method, structure-borne noise that was high In 25Hz wide-band before pavement decreased regardless of experimental vehicle's velocity Using porous asphalt pavement the noise was reduced about 3 dB(A).

Noise Reduction of Concrete Pavement by Texture Design (콘크리트 포장 표면처리 방법에 따른 소음 감소 방안 연구)

  • Mun, Jun-Beom;Park, Jin-Whoy;Kwon, Soon-Min;Han, Seung-Hwan;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.6 no.4 s.22
    • /
    • pp.123-136
    • /
    • 2004
  • This study tries to compare the noise difference by various surface treatments and to propose appropriate tinning methods. As literature reviews, longitudinally tined pavement is effective to reduce noise made between tire and pavement surface. Various surface treatments were applied to some sections of test road. In case of car, about 2$\sim$3dB(A) was reduced in the section of uniform space 18mm longitudinal tinning. The peak frequency point for truck case happened between 200 and 600 Hz. The maximum noise of car was measured at about 1000Hz. Therefore, it Is proved that surface treatment methods can have a large affect on noise generation. With a result that friction test, the transverse tined pavement showed better frictional characteristics than the longitudinally tined pavement, but as a whole it came out satisfactory result. Results from this study are of early age, so it is required to check the performance continuously.

  • PDF

Noise Evaluation of the Rumble Strips Constructed at Tall Gate of Highway (고속도로 영업소 광장의 럼블스트립 관련 소음평가)

  • Lee, Jae-Jun;Mun, Sung-Ho;An, Deok-Soon;Kwon, Soo-Ahn
    • International Journal of Highway Engineering
    • /
    • v.14 no.5
    • /
    • pp.201-206
    • /
    • 2012
  • PURPOSES: This study evaluated a measuring technique for tire-pavement interaction noise that uses a noble close proximity (NCPX) method as well as for noise level measured inside of a car (e.g., Inside Noise Level) in term of rumble strips constructed at a tall gate. METHODS: According to the measurements of NCPX and inside noise level (INL), 1/3 octave band frequency analysis and overall noise level calculation were conducted in order to evaluate noise levels of NCPX and INL, depending on types of rumble strips. RESULTS: The tested sections of general concrete pavement surface and two different types of rumble strips were evaluated, using 1/3 octave band frequency analysis and overall noise level. From the analyzed results, it can be concluded that rumble strips generate a relatively huge noise levels when compared to the concrete pavement surface. CONCLUSIONS: Noting that above 3 dBA different noise levels can let drivers know that they are getting close to toll gate; therefore, they should apply their brakes. Thus, the noise levels of rumble strips are required to be reduced, based on considering the neighbors living near toll gates.

The Response Prediction of Flexible Pavements Considering Nonlinear Pavement Foundation Behavior (비선형 포장 하부 거동을 고려한 연성 포장의 해석)

  • Kim, Min-Kwan
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.165-175
    • /
    • 2009
  • With the current move towards adopting mechanistic-empirical concepts in the design of pavement structures, state-of-the-art mechanistic analysis methodologies are needed to determine accurate pavement responses, such as stress, strain, and deformation. Previous laboratory studies of pavement foundation geomaterials, i.e., unbound granular materials used in base/subbase layers and fine-grained soils of a prepared subgrade, have shown that the resilient responses followed by nonlinear, stress-dependent behavior under repeated wheel loading. This nonlinear behavior is commonly characterized by stress-dependent resilient modulus material models that need to be incorporated into finite element (FE) based mechanistic pavement analysis methods to predict more realistically predict pavement responses for a mechanistic pavement analysis. Developed user material subroutine using aforementioned resilient model with nonlinear solution technique and convergence scheme with proven performance were successfully employed in general-purpose FE program, ABAQUS. This numerical analysis was investigated in predicted critical responses and domain selection with specific mesh generation was implemented to evaluate better prediction of pavement responses. Results obtained from both axisymmetric and three-dimensional (3D) nonlinear FE analyses were compared and remarkable findings were described for nonlinear FE analysis. The UMAT subroutine performance was also validated with the instrumented full scale pavement test section study results from the Federal Aviation Administration's National Airport Pavement Test Facility (FAA's NAPTF).

  • PDF

Study on Dowel-Bar Optimum Position of Jointed Concrete Pavement Using 3-D FEM Analysis (3차원 유한요소해석을 이용한 줄눈콘크리트 포장의 다웰바 최적배치에 대한 연구)

  • Chon, Beom Jun;Hong, Seong Jae;Lee, Seung Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.135-141
    • /
    • 2010
  • Dowel bar in the jointed concrete pavement has been designed and constructed by Foreign standard and experience in Korea. The behavior of dowel bar is explored based in analyze of 3-Dimension Finite Element Method. To evaluate behavior of dowel bar compared Timoshenko theory and 3-Dimensional Finite Element Method. Based on the 3-Dimension Finite Element Method analyze the dowel-bar optimum position that can reduce deflections of slabs by considering wheel path distributions was suggest in this study.

Effect of Tire Contact Stresses on Tensile Strains in the Surface of Thin Asphalt Pavement (접지압력이 앎은 아스팔트포장 표층 인장 변형률에 미치는 영향 분석)

  • Park, Dae-Wook;Park, Joon-Kyu
    • International Journal of Highway Engineering
    • /
    • v.10 no.2
    • /
    • pp.47-55
    • /
    • 2008
  • In this paper, comparisons are presented on the predicted tensile strains which can affect the fatigue life of a thin asphalt concrete (AC) pavement near the surface of pavement from three-dimensional (3D) finite element (FE) using 3D measured tire contact stresses of a radial tire and a bias ply tire and a layered linear elastic program (BISAR). The objective was to analyze the stress distributions for a 11R22.5 radial tire and a $10{\times}20$ bias ply tire, and to compare the predicted tensile strains at the top and bottom of AC surface using different analysis methods. The results show that the stress distributions of two tires are similar but the 11R22.5 radial tire has much higher vertical contact stress than that of the $10{\times}20$ bias ply tire. The predicted tensile strains at the bottom of AC layer under the center of tire showed higher value by BM (BISAR with the measured contact area) method, which the measured tire contact area is used in a layered elastic program, while the tensile strain at the top of AC surface of 3.5cm offset distance from tire edge by 3D FE analysis showed the highest values among three analysis methods.

  • PDF

Pavement Response in Flexible Pavements using Nonlinear Tire Contact Pressure and Measured Tire Contact Area (타이어의 접지 면적과 비선형 접지압력을 고려한 연성포장내의 거동 분석)

  • Jo, Myoung Hwan;Kim, Nakseok;Jeong, Jin-Hoon;Seo, Youngguk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.601-608
    • /
    • 2006
  • The important elements in pavement design criteria are the stress and strain distributions. To obtain reasonable stress and strain distribution, tire contact area and tire pressures are very important. In this study, finite element analysis was used to identify the three-dimension states using nonlinear tire contact pressure and measured tire contact area. Measured tire contact area was quite different from the assumed tire contact area, and it resulted in different strain states under the tire. At the surface course, considering tire rib and nonlinear tire pressure, the pavement response presented accurate data compared to the predicted one. However, at the binder course, tire effects were generally negligible and it showed that the predicted pavement response was different compared to the measured one.