• Title/Summary/Keyword: 3D building model

Search Result 706, Processing Time 0.024 seconds

Development of BIM-based CPLM System for Civil Project Management (토목 프로젝트 관리를 위한 BIM 기반 CPLM 시스템 개발)

  • Lee, Kwang-Myong;Lee, Chang-Woo;Han, Song-Yi;Kang, Hyoung-Seok;Noh, Sang-Do
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.24-29
    • /
    • 2011
  • BIM technology, based on 3D model of civil engineering structures, creates and manages information of the structures throughout four stages: Planning, design, construction, and maintenance. BIM is now used around the globe for improvement of the construction productivity. However, in order to expect the efficient engineering work, collaboration system between participants in a construction project is necessary. Therefore, in this paper BIM based CPLM (Construction project lifecycle management) system was designed and developed by analyzing the requirements of participants of a construction project. CPLM system offers an environment which enables the sharing and management of information according to the each stage of construction. CPLM is expected to aid cooperative decision-making during the overall construction process through the process innovation and the efficient data management.

Numerical Analysis on Offshore Wind Power System Foundation (해상풍력단지 기초에 관한 수치해석적 연구)

  • Kim, Dong-Ho;Jang, Won-Yil;Kim, Seong-Yun;Shin, Sung-Ryul;Lim, Jong-Se;Yoon, Ji-Ho
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.33 no.2
    • /
    • pp.355-361
    • /
    • 2009
  • Onshore wind farms having several problems, difficult to secure a building site and incur the enmity of the people. Therefore, offshore wind farms are increasingly expected, because there are huge resource and large site in offshore. If huge wind turbines are constructed, the offshore wind power base is concerned about subsidence. In order to confirm the ground stability, estimation of subsidence is necessary. In this paper, the subsidence is predicted by continuity model when the gravity and the mono-pile base are constructed on soft ground. The FLAC 3D, three dimensional FDM program, was adopted to analysis subsidence. Input factors are yielded by geological information at the yeompo quay in ulsan and the results of laboratory experiments. It has been compared that the original ground with improved ground under the gravity base, and constructed mono-pile under the mono-pile base.

A Study on the Trends Analysis Program Module of Interior Design Based on Apartment (실내디자인의 기호분석 프로그램 모듈에 관한 연구 - 아파트 주거공간을 중심으로 -)

  • Han, Young-Ho;Jang, Jung-Sik
    • Korean Institute of Interior Design Journal
    • /
    • no.34
    • /
    • pp.157-164
    • /
    • 2002
  • Online business these days prone to approach their costumers with improved module and various interface via Internet. This is more than just an act of providing enhancement, but a mean of finding out the customer's demand by enlarging their selection. This, however, is related to the bits per second of supplemental service network.For example, supplemental services that were not possible in the 56K modem era are now possible due to the information super highway network. To grope for new means of approaching, the best way will be by developing media that will collect customer's demands. Until now, customer's demands were evaluated by miniatures of apartment building, model houses or rendered images produced by 3D graphic softwares and pictures. Analyses were not available until evaluation were produced.Nowadays, utilizing the advanced Internet interface tools and various new media, customers are sought before the construction thus various studies to full fill the customer's demands are in process. This study is on development of a virtual module utilizing activated web environment. Analysis modules repeating the changes in customers are expected to deliver us a new trend.

Design and Construction of a 1:5 Scale 10-Story R.C. Apartment Building Model for Earthquake Simulation Tests (지진모의실험을 위한 10층 R.C. 공동주택의 1:5 축소모델 설계 및 시공)

  • Hwang, Seong-Jun;Lee, Kyung-Bo;Kang, Chang-Bum;Lee, Han-Seon;Lee, Sang-Ho;Oh, Sang-Hoon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.15 no.6
    • /
    • pp.55-66
    • /
    • 2011
  • The purpose of this study was to develop an efficient process in the design and construction of a 1:5 scale 10-story R.C. apartment building model for an earthquake simulation test. The reduction ratio of the specimen was determined by the size ($5m{\times}5m$) and pay load (600kN) of the available shaking table and the availability of model reinforcements. For efficiency and quality control of the reinforcement work, prefabrication was used. Construction was conducted in two steps, the wall in one step, and another step for the slab, because it was impossible to remove the formwork of a wall if the walls and slabs in a story were constructed in one step. The slip form construction method was used repetitively for walls. The formwork of a wall was made with veneer and acryl plate on each side, so it was possible to check the quality of the concrete placing. To construct this model, it took roughly six months with five full-time research assistants, for a total of 602 man days of labor in construction.

Evaluating Applicability of Hunt's Analytical Solution for Groundwater Pumping from a Leaky Aquifer (누수대수층 지하수 양수에 관한 Hunt 해석해의 적용성 평가)

  • Lee, Jeongwoo;Chung, Il-Moon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.6
    • /
    • pp.555-561
    • /
    • 2020
  • In this study, the applicability of Hunt's analytical solution for a two-layered leaky aquifer system, which was developed to estimate stream depletion due to the groundwater pumping of the upper shallow aquifer, was evaluated. The 5-year averaged stream depletions were estimated using Hunt's analytical solution for various combinations of hydraulic characteristic values such as transmissivity, storage coefficient of the two aquifers, interlayer leakage coefficient, stream-well distance, hydraulic conductivity of the streambed, and stream width. Through comparison with the numerical solution accurately simulated with a MODFLOW groundwater flow model, the analytical solution derived by regarding the stream width as a point was evaluated. It was found that the error in the stream depletion calculated by the analytical solution can be reduced to less than 0.05 when the stream-well distance is greater than the stream width or when the stream depletion factor (SDF) is more than about 3,000 days. In addition, when the streambed hydraulic conductivity is less than 1 m/d, the hydraulic diffusion coefficient of the lower aquifer layer is less than 100 ㎡/d, the hydraulic diffusion coefficient ratio of the upper and lower aquifer layers is 5 or more, and the leakage coefficient between the layers is less than 0.0004 m/d, the overall analytical solutions were overestimated compared with the numerical solutions.

DEM generation from an IKONOS stereo pair using EpiMatch and Graph-Cut algorithms

  • Kim, Tae-Jung;Im, Yong-Jo;Kim, Ho-Won;Kweon, In-So
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.524-529
    • /
    • 2002
  • In this paper, we report the development of two DEM (digital elevation model) generation algorithms over urban areas from an IKONOS stereo pair. One ("EpiMatch") is originally developed for SPOT images and modified for IKONOS images. It uses epipolar geometry for accurate DEM generation. The other is based on graph-cut algorithm in 3D voxel space. This algorithm is believed to work better on height discontinuities than EpiMatch. An IKONOS image pair over Taejon city area was used for tests. Using ground control points obtained from differential GPS, camera model was set up and stereo matching applied. As a result, two DEMs over urban areas were produced. Within a DEM from EpiMatch small houses appear as small "cloudy" patches and large apartment and industrial buildings are visually identifiable. Within the DEM from graph-cut we could achieve better height information on building boundaries. The results show that both algorithms can generate DEMs from IKONOS images although more research is required on handling height discontinuities (for "EpiMatch") and on faster computation (for "Graph-cut").

  • PDF

Behavior of composite CFST beam-steel column joints

  • Eom, Soon-Sub;Vu, Quang-Viet;Choi, Ji-Hun;Papazafeiropoulos, George;Kim, Seung-Eock
    • Steel and Composite Structures
    • /
    • v.32 no.5
    • /
    • pp.583-594
    • /
    • 2019
  • In recent years, composite concrete-filled steel tubular (CFST) members have been widely utilized in framed building structures like beams, columns, and beam-columns since they have significant advantages such as reducing construction time, improving the seismic performance, and possessing high ductility, strength, and energy absorbing capacity. This paper presents a new composite joint - the composite CFST beam-column joint in which the CFST member is used as the beam. The main components of the proposed composite joint are steel H-beams, CFST beams welded with the steel H-column, and a reinforced concrete slab. The steel H-beams and CFST beams are connected with the concrete slab using shear connectors to ensure composite action between them. The structural performance of the proposed composite joint was evaluated through an experimental investigation. A three-dimensional (3D) finite element (FE) model was developed to simulate this composite joint using the ABAQUS/Explicit software, and the accuracy of the FE model was verified with the relevant experimental results. In addition, a number of parametric studies were made to examine the effects of the steel box beam thickness, concrete compressive strength, steel yield strength, and reinforcement ratio in the concrete slab on the proposed joint performance.

The Study for Improvement Method of Landscape Simulation Program (경관시뮬레이션 프로그램 개선방안에 관한 연구)

  • Lee, Dong-Hwa;Kim, Jae-Myeong
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.89-97
    • /
    • 2020
  • The purpose of this study is to identify the problems of the currently used 3D spatial information utilization system to realize a more accurate landscape and to establish a user-oriented environment to improve the utilization plan for future landscape evaluation. As citizens' interest in urban landscapes with strong public characteristics increases and the speed of urban development also increases, more suitable simulation methods for landscape management are required. Nevertheless, there are many cases of inconvenient correction according to development changes along with many errors in various steps for creating landscape simulation. Therefore, in performing landscape deliberation according to development, it is necessary to create more accurate and efficient landscape simulation, and if changes occur after the initial deliberation, a process that can quickly and conveniently correct and supplement data is needed. In addition, it is necessary to create landscape simulation so that the created modeling source can be used by being compatible with other application programs. In this study, a method of constructing a more accurate and efficient simulation at the time of initial deliberation and a method of creating a landscape simulation model for rapid response to a plan that is changed at the time of re-deliberation are described.

Investigation of crack growth in a brick masonry wall due to twin perpendicular excavations

  • Mukhtiar Ali Soomro;Dildar Ali Mangnejo;Naeem Mangi
    • Geomechanics and Engineering
    • /
    • v.34 no.3
    • /
    • pp.251-265
    • /
    • 2023
  • In urban construction projects, it is crucial to evaluate the impacts of excavation-induced ground movements in order to protect surrounding structures. These ground movements resulting in damages to the neighboring structures and facilities (i.e., parking basement) are of main concern for the geotechnical engineers. Even more, the danger exists if the nearby structure is an ancient or masonry brick building. The formations of cracks are indicators of structural damage caused by excavation-induced ground disturbances, which pose issues for excavation-related projects. Although the effects of deep excavations on existing brick masonry walls have been thoroughly researched, the impact of twin excavations on a brick masonry wall is rarely described in the literature. This work presents a 3D parametric analysis using an advanced hypoplastic model to investigate the responses of an existing isolated brick masonry wall to twin perpendicular excavations in dry sand. One after the other, twin perpendicular excavations are simulated. This article also looks at how varying sand relative densities (Dr = 30%, 50%, 70%, and 90%) affect the masonry wall. The cracks at the top of the wall were caused by the hogging deformation profile caused by the twin excavations. By raising the relative density from 30% to 90%, excavation-induced footing settlement is greatly minimized. The crack width at the top of the wall reduces as a result of the second excavation in very loose to loose sand (Dr = 30% and 50%). While the crack width on the top of the wall increases owing to the second excavation in medium to very dense sand (Dr = 70% and 90%).

Development of AAB (Algorithm-Aided BIM) Based 3D Design Bases Management System in Nuclear Power Plant (Algorithm-Aided BIM 기반 원전 3차원 설계기준 관리시스템 개발)

  • Shin, Jaeseop
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.28-36
    • /
    • 2019
  • The APR1400 (Advanced Power Reactor 1400MW) nuclear power plant is a large-scale national infrastructure facility with a total project cost of 8.6 trillion won and a project period of 10 years or more. The total project area is about 2.17 million square meters and consists of more than 20 buildings and structures. And the total number of drawings required for construction is about 65,000. In order to design such a large facility, it is important to establish a design standard that reflects the design intent and can increase conformity between documents (drawings). To this end, a design bases document (DBD) reflecting the design bases that extracted in regulatory requirements (e.g. 10CFR50, Korean Law, etc.) is created. However, although the design bases are important concepts that are a big framework for the whole design of the nuclear power plant, they are managed in 2-dimensional by the experts in each field fragmentarily. Therefore, in order to improve the usability of building information, we developed BIM(Building Information Model) based 3-dimensional design bases management system. For this purpose, the concept of design bases information layer (DBIL) was introduced. Through the simulation of developed system, design bases attribute and element data extraction for each DBIL was confirmed, and walls, floors, doors, and penetrations with DBIL were successfully extracted.