3-Dimensional FE Analysis of Construction Stages of The Cable-stayed Bridge with Steel-box Girder (강박스 사장교의 시공단계를 고려한 3D 상세 유한요소 해석)

  • Lee Tae-Yeol;Kim Young-Hoon;Shin Hyun-Yang;Kim Jae-Kwon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2005.04a
    • /
    • pp.249-256
    • /
    • 2005
  • Rigorous FE(Finite Element) analyses of the cable-stayed bridge with steel-box girder, the main construction method of which is FCM (Free Cantilever Method), are presented in this paper. The analysis and the checking of design for a derrick crane under several loading conditions are performed using the software MIDAS/Civil and the beam elements are used to model the main structure. Among all the construction stages, special construction stages are chosen and considered to ensure the safety of segments of box girder The stress analysis for lifting of a segment of box girder is performed using the software SAP2000 and the shell elements of which having 6 DOF(Degrees Of Freedom) per nodes are successfully used to model the segment of box girder for the purpose of capturing the detailed behaviors on the folded-plates in the segment. Finally, concluding remarks are given to improve a design of the derrick crane and the segment based on the results from this study.

  • PDF

Numerical Analysis of Flow and Bed Changes for Selecting Optimized Section of Buried Water Pipeline Crossing the River (하천을 횡단하는 도수관로의 최적 매설구간 선정을 위한 흐름 및 하상변동 수치모의)

  • Jang, Eun-Kyung;Ji, Un
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.3
    • /
    • pp.1756-1763
    • /
    • 2014
  • A water pipeline buried under the riverbed could be exposed by bed erosion, therefore safe crossing sections should be analyzed for preventing damages due to the exposure of pipelines. In this study, flow and bed changes have been simulated using a two-dimensional numerical model for selecting the optimized section of pipeline crossing in the Geum River. As a result of simulation with the 20-year recurrence flood, sediment deposition has been distributed overall in the channel and bed erosion over 2 m has occurred near bridge piers. For the extreme flood simulation, the channel bed near the bridge piers has been eroded down to the buried depth. Therefore, within 140 m upstream of the bridge piers, bed erosion affects a buried pipeline in safety due to bridge pier effects and the crossing section over 150 m upstream of bridge piers is selected as a safe zone of a water pipeline.

The Evaluation of Axial Stress in Continuous Welded Rails via Three-Dimensional Bridge-Track Interaction

  • Manovachirasan, Anaphat;Suthasupradit, Songsak;Choi, Jun-Hyeok;Kim, Bum-Joon;Kim, Ki-Du
    • International journal of steel structures
    • /
    • v.18 no.5
    • /
    • pp.1617-1630
    • /
    • 2018
  • The crucial differences between conventional rail with split-type connectors and continuous welded rails are axial stress in the longitudinal direction and stability, as well as other issues generated under the influence of loading effects. Longitudinal stresses generated in continuously welded rails on railway bridges are strongly influenced by the nonlinear behavior of the supporting system comprising sleepers and ballasts. Thus, the track structure interaction cannot be neglected. The rail-support system mentioned above has properties of non-uniform material distribution and uncertainty of construction quality. The linear elastic hypothesis therefore cannot correctly evaluate the stress distribution within the rails. The aim of this study is to apply the nonlinear finite element method using the nonlinear coupling interface between the track and structural model and to illustrate the welded rail behavior under the loading effect and uncertain factors of the ballast. Numerical results of nonlinear finite analysis with a three-dimensional solid and frame element model are presented for a typical track-bridge system. A composite plate girder, modeled by solid and shell elements, is also analyzed to consider the behavior of the welded rail. The analysis result showed buckling under the independent calculations of load cases, including 'temperature change', 'bending of the supporting structure', and 'braking' of the railway vehicle. A parametric study of the load combination method and the loading sequence is also included in this analysis.

A Case Study of Stability of Bridge Abutment Using the Light Banking Material(EPS) (경량성토재(EPS)를 이용한 교량 교대의 안정성 검토)

  • Chang, Yong-Chai
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.5
    • /
    • pp.80-90
    • /
    • 1998
  • The EPS construction method-one kind of the load reducing methods-utilizes the EPS blocks, ultra-light materials whose unit weight is about 1/100 of soils and has been applied to many soft ground sites. It needed 3,000 days to get the 90% degree of the consolidation for the case of 12m high soil embankments on the 30m thick soft clayey foundations. The N value of SPT at this deposit was less than 5. The pack drain was installed to promote the radial consolidations. Although staged embankments were planned, designers failed to get a sufficient stability of the foundation ground. Therefore, the EPS fill method was selected to reduce the load and the construction period. EPS blocks(D-20 model) replaced the upper part of the soil embankments. These complex embankments reduced the ground settlement and the construction period. The possibility of lateral movements of the bridge abutments was checked and the design scheme was reviewed.

  • PDF

Calculation of Electrodynamic Repulsion Force in Molded Case Circuit Breakers Using the 3-D Finite Element Analysis (3차원 유한요소 해석을 이용한 배선용 차단기의 전자반발력 계산)

  • Kim, Yong-Gi;Park, Hong-Tae;Song, Jung-Chun;Seo, Jung-Min;Degui, Chen
    • Proceedings of the KIEE Conference
    • /
    • 2003.10b
    • /
    • pp.137-140
    • /
    • 2003
  • To the optimization design of molded case circuit breakers(MCCBs), it is necessary and important to calculate the electro-dynamic repulsion force acting on the movable conductor. With 3-D finite element nonlinear analysis, according to the equations among current-magnetic field-repulsion force and taking into account the ferromagnet, contact bridge model is introduced to simulate the current constriction between contacts, so Lorentz and Holm force acting on the movable conductor and contact, respectively, can be integrated to calculate. Coupled with circuit equations, the opening time of movable contact also can be obtained using iteration with the restriction of contact force. Simulation and experiment for repulsion forte and opening time of five different configuration models have been investigated. The results indicate that the proposed method is effective and capable of evaluating new design of contact systems in MCCBs.

  • PDF

A Study on the Dynamic Response of Highway Bridges by 4-Axles Single Truck (4축 단일차량에 의한 도로교의 동적응답에 관한 연구)

  • Chung, Tae-Ju
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.3
    • /
    • pp.397-404
    • /
    • 2011
  • In this paper, a research for the dynamic wheel loads of a 3D vehicle model, which relates to a tire-enveloping model, is carried out. A single truck with four axles is modeled as a 10-D.O.F. vehicle by modeling both contact length of tires and pitching of tandem spring axles. The dynamic equations of the vehicle are obtained using the Lagrange's equation, the solution of the equations is calculated by Newmark-${\beta}$ method. The validity of the developed 3D vehicle model is demonstrated by comparing results obtained from the proposed method with those from experimental data. The maximum impact factors of tire force are evaluated according to the various step bumps on which a 24-ton dump truck is running.

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.

Marginal and internal discrepancy of 3-unit fixed dental prostheses fabricated by subtractive and additive manufacturing (절삭 및 적층 가공법으로 제작된 3본 고정성 국소의치의 변연 및 내면 적합도에 관한 연구)

  • Choi, Jae-Won
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.58 no.1
    • /
    • pp.7-13
    • /
    • 2020
  • Purpose: This study was to evaluate marginal and internal discrepancy of 3-unit fixed dental prostheses (FDP) fabricated by subtractive manufacturing and additive manufacturing. Materials and methods: 3-unit bridge abutments without the maxillary left second premolar were prepared (reference model) and the reference model scan data was obtained using an intraoral scanner. 3-unit fixed dental prostheses were fabricated in the following three ways: Milled 3-unit FDP (MIL), digital light processing (DLP) 3D printed 3-unit FDP (D3P), stereolithography apparatus (SLA) 3D printed 3-unit FDP (S3P). To evaluate the marginal/internal discrepancy and precision of the prosthesis, scan data were superimposed by the triple-scan protocol and the combinations calculator, respectively. Quantitative and qualitative analysis was performed using root mean square (RMS) value and color difference map in 3D analysis program (Geomagic control X). Statistical analysis was performed using the Kruskal-Wallis test (α=.05), MannWhitney U test and Bonferroni correction (α=.05/3=.017). Results: The marginal discrepancy of S3P group was superior to MIL and D3P groups, and MIL and D3P groups were similar. The D3P and S3P groups showed better internal discrepancy than the MIL group, and there was no significant difference between the D3P and S3P groups. The precision was excellent in the order of MIL, S3P, and D3P groups. Conclusion: Within the limitation of this study, the 3-unit fixed dental prostheses fabricated by additive manufacturing showed better marginal and internal discrepancy than the those of fabricated by subtractive manufacturing, but the precision was poor.

A Study on Fatigue Safety Estimation of Cross Frame of Suspension Bridge(I) - Estimation by Nominal Stress - (현수교 횡프레임의 피로안전성 평가에 관한 연구(I) - 공칭응력에 의한 평가 -)

  • Kyung, Kab Soo;Jeon, Jun Chang;Su, Seok Ku;Yong, Hwan Sun
    • Journal of Korean Society of Steel Construction
    • /
    • v.11 no.4 s.41
    • /
    • pp.397-407
    • /
    • 1999
  • In this paper, the fatigue safety in the suspension bridge is investigated by using nominal and variable stress, respectively. The technique on structural modeling and the fatigue evaluation using nominal stress are mainly dealt with in this paper. To make the finite element analysis model reflecting the actual structural behavior of the suspension bridge with cross frame, the parametric study is carried out. In this study, the influence of supporting condition. the difference of the results of 2- and 3-D analysis and the number of cross frames modelled in are considered. The nominal stress under the real traffic flow of the bridge is calculated by the combination of the stresses due to the unit DB-24 loading. The nominal stresses for details under consideration are compared with allowable stress ranges specified in the codes and the results are discussed.

  • PDF

Response evaluation and vibration control of a transmission tower-line system in mountain areas subjected to cable rupture

  • Chen, Bo;Wu, Jingbo;Ouyang, Yiqin;Yang, Deng
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.1
    • /
    • pp.151-171
    • /
    • 2018
  • Transmission tower-line systems are commonly slender and generally possess a small stiffness and low structural damping. They are prone to impulsive excitations induced by cable rupture and may experience strong vibration. Excessive deformation and vibration of a transmission tower-line system subjected to cable rupture may induce a local destruction and even failure event. A little work has yet been carried out to evaluate the performance of transmission tower-line systems in mountain areas subjected to cable rupture. In addition, the control for cable rupture induced vibration of a transmission tower-line system has not been systematically conducted. In this regard, the dynamic response analysis of a transmission tower-line system in mountain areas subjected to cable rupture is conducted. Furthermore, the feasibility of using viscous fluid dampers to suppress the cable rupture-induced vibration is also investigated. The three dimensional (3D) finite element (FE) model of a transmission tower-line system is first established and the mathematical model of a mountain is developed to describe the equivalent scale and configuration of a mountain. The model of a tower-line-mountain system is developed by taking a real transmission tower-line system constructed in China as an example. The mechanical model for the dynamic interaction between the ground and transmission lines is proposed and the mechanical model of a viscous fluid damper is also presented. The equations of motion of the transmission tower-line system subjected to cable rupture without/with viscous fluid dampers are established. The field measurement is carried out to verify the analytical FE model and determine the damping ratios of the example transmission tower-line system. The dynamic analysis of the tower-line system is carried out to investigate structural performance under cable rupture and the validity of the proposed control approach based on viscous fluid dampers is examined. The made observations demonstrate that cable rupture may induce strong structural vibration and the implementation of viscous fluid dampers with optimal parameters can effectively suppress structural responses.