• Title/Summary/Keyword: 3D BIM

Search Result 404, Processing Time 0.03 seconds

A Study on the Link of Building Information and Cadastral Information as Spatial Information (공간정보로서의 지적정보와 건물정보의 연계에 관한 연구)

  • Kim, Chang-Hwan;Lee, Won-Hui
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.17 no.3
    • /
    • pp.93-103
    • /
    • 2014
  • Regarding to the cadastral information and building information as a spatial information, studies on linking between cadastral records and building information, or integration methodology on 2D based building map and land information were proposed. Cadastral information has grown its values by cadastral resurvey project and cadastral confirmation survey. There is a tendency of BIM in the design stage which is not just simple 3D dataset and BIM is spreading in public and private sectors. However, studies on the linkage between building information and cadastral information is relatively weak comparing to the BIM spreading. One of the main features that have been improved in IFC4 is the interoperability with GIS. In this regards, the researcher propose several revision methods to link cadastral information to building information. Cadastral information needs to improve the quality of the dataset's such as unifying the different coordinate systems and preparing continuous cadastral map. For buildings, standardization of BIM in the public and private sectors is urgent task. IFC4 and upcoming IFC5 are international standards which need to be considered and BIM reverse engineering for the existing buildings is necessary for the public utilization in the near future.

Study on Substitution Effect caused by Application of BIM Simulation System to Mock-up Site (시공단계 현장 Mock-up의 BIM 기반 시뮬레이션 기법 적용에 의한 기대효과 분석 연구)

  • Jang, Se-Jun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.147-151
    • /
    • 2008
  • Construction project is completed through several stages and problems of each stage affect directly not only now but also next. Defect of 2D drawings influence in construction phase, and it make many loss on project. Nowadays we practically use real Mock-up test in construction sites to solve the problems. But it also has many problems which are waste much money and time. Therefore, this study tries to analyze effect that is occurred by appling BIM Mock-up simulation instead of real Mock-up execution. These analysis is conducted by comparing two construction building site. These have same shape but one is made for BIM Mock-up, and another is real Mock-up. Comparison points of view are cost, time and operator's satisfaction. It is expect that BIM Mock-up is more effective at low cost and on shorter time. But our analysis show that each are conducted different part of function. So new Mock-up type is required. Hybrid Mock-up is combine real mock-up with BIM simulation and it can minimize risk of project.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Interview - "BIM, Fits well with small and medium-sized architect offices!" (인터뷰 - "BIM, 중소규모 건축사사무소에도 잘 맞는다!")

  • Yuk, Hye-Min
    • Korean Architects
    • /
    • s.615
    • /
    • pp.32-35
    • /
    • 2020
  • 코로나19 이후 건축사업계 비대면 작업 등의 필요성이 대두되면서, 스마트건설 플랫폼 기술인 BIM(Building Information Modeling, 건설정보모델링) 활성화에 관한 목소리도 높아지고 있다. 최근 한국건설기술연구원에서는 공공분야 BIM 기술의 성숙도를 4단계(레벨1~4)로 봤을 때, 우리나라의 평가치는 '레벨1' 초보 수준에 머물러 있다는 진단을 냈다. 이미 '레벨3' 수준에 진입한 영국 등 선진국보다 뒤처져 있다는 분석인데, 이는 2D 환경을 기반으로 설계 또는 시공업무에 대해 제한적으로 BIM을 적용하면서, 일정 규모 이상의 설계BIM만 의무화한 수준이기 때문이다. BIM 트렌드가 '기술개발'에서 '활용' 단계로 넘어가는 과정 가운데 건축분야에서의 활성화 방안은 무엇일까. 월간 '건축사'가 'WBIM(주.더블유빔)'사(社)의 이재환 대표를 만나 BIM의 현장 활용성, 그리고 적용 측면에서의 현실문제 등에 대한 현장 이야기를 들어봤다. 각종 개발사업과 설계파트를 지원하며 BIM전문가로 활동해 온 이재환 대표는 "기획단계부터 BIM을 활용하면 사업 진행 전 과정에서 실시간 검증이 가능하고 동시에 각종 아이디어를 효과적으로 적용할 수 있다"면서도 "활용성을 확보하려면 업계뿐 아니라 발주처, 감독 등도 BIM에 대한 이해도를 높여야 한다"고 말했다.

  • PDF

A Study on the Evaluation Management of Public Housing Architectural Competition using BIM (공공 공동주택의 BIM적용 설계 경기 평가관리에 한 연구 - BIM적용 가능 평가항목 선정을 중심으로 -)

  • Min, Byoung-Jik;Lim, Jae-Bok;Kim, Ju-Hyung;Seo, Jong-Won;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.1-9
    • /
    • 2012
  • In Korea, recently, efforts have been made to introduce BIM(Building Information Modeling) to housing complex projects. However, there have been several problems including excessive competition for building design and outcome-oriented evaluation due to a lack of clear evaluation criteria and poorly organized management process. Under this circumstance, the study surveyed opinions of project managers and conducted a pilot test to improve evaluation criteria of BIM-based design for housing complexes. The objective is to assess the level of BIM technology and its applicability, and to propose a list of reasonable evaluation criteria for better project management. First, the study examined the current condition of evaluation on the BIM-based housing complexes, and identified 15 preliminary items that might be suitable for application of BIM. Second, the study conducted a pilot test for the 15 items to determine their suitability for the level of BIM technology, clarity of the calculation process, and the extent of fulfilling information quality, and short-listed eight items for application of BIM. In particular, in the design concept stage, mostly 3D visual images and area-related items are suitable for BIM-based evaluation. Accordingly, formerly used items such as project cost, energy and environmental analysis, building structure, and facilities were deemed more relevant to the subsequent stages of basic design and its implementation.

Effectiveness Analysis of BIM-based Architectural Facility Management Scenario (BIM 기반 건축 시설물 유지관리 시나리오 효과 분석)

  • Kang, Tae-Wook;Kim, Ji-Eun;Choi, Hyun-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.11
    • /
    • pp.10-19
    • /
    • 2016
  • Recently, according to a public order with BIM regulations, various technologies of facility management (FM) have been studied to use BIM data effectively. The technology for BIM-based FM, such as BIM data standard, BIM modeling, BIM server, and BIM-GIS platform, reverse engineering based on 3D image scans is developing constantly. On the other hand, there has been little research on the range of FM based on BIM, the role of actors by management works, the difference, and difference in effects between original FM and BIM-based FM. This study examined the scenario of architectural FM based on BIM and confirmed the effect. For this, after analyzing the research trends, the range of FM applications and the role of actors by management works were defined, and the effectiveness analysis of a BIM-based architectural FM scenario was deduced.

A Study on Analysis of the Template Component for the Development of BIM Template (BIM 템플릿 개발을 위한 템플릿 구성요소 분석에 관한 연구)

  • Lee, Sang Heon;Kim, Mi Kyoung;Choi, Hyun Ah;Jun, Han Jong
    • KIEAE Journal
    • /
    • v.11 no.2
    • /
    • pp.123-130
    • /
    • 2011
  • BIM based design methodology requires more information than traditional design methodology in order to insure efficiency throughout the project. BIM based design not only requires all building data in the form of 3D shapes, but also all other relevant data regarding building components. Information is typically grouped in a standard classification system such as by standardized material names. The development of a domestic BIM based standard classification system is yet to be created and deployed in the industry. Each designer is specifying their own building information classification systems which is causing inconsistency in the industry. Therefore BIM based designs, are causing confusion in the industry as each designer follow no guidelines for material standardization classification. The lack of information regarding this in the BIM template will continue to cause confusion about a projects building information data consistently. This study is that of preliminary research to develop a BIM template. First, overseas BIM templates were analyzed regarding BIM standards and documentation. Examination then followed regarding the element and characteristics needed for the development of a BIM template, a suggested hierarchy of elements required for a BIM template were then made. The result of this research is that it will be used to develop a "BIM template prototype", to support the generation of building information data regarding neighborhood facilities.

The Application of Geospatial Information Acquisition Technique and Civil-BIM for Site Selection (지형공간정보취득기술과 토목BIM을 활용한 부지선정 연구)

  • Moon, Su-Jung;Pyeon, Mu-Wook;Park, Hong-Gi;Ji, Jang-Hun;Jo, Jun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.6
    • /
    • pp.579-586
    • /
    • 2010
  • Due to the recent development of measuring technology and 3D programs, it has become possible to obtain various spatial data. This study utilizes the 2-dimensional data and 3-dimensional data extraction technology based on the existing empirical and statistical DB. The data obtained from geospatial data technology are integrated with civil engineering BIM to conduct the modeling of the topography of the target region and select the optimum location condition by using the cut and fill balance of the volume of earth. The target area is the land around Tamjin River, Jangheong-gun, Jeolla-do. The 3-dimensional topology linked with 3-dimensional mapping technology by using the orth-image and aerial LiDAR that uses aerial photo of the target area is visualized with Civil3D of AutoDesk. By using Civil3D program, the Thanks to the recent development of measuring technology and 3D programs, target area is analyzed through visualization and related data can be obtained for analysis. The method of using civil engineering BIM enables to obtain various and accurate information about the target area which is helpful for addressing the issues risen from the existing methodology. In this regard, it aims at searching for the alternatives and provides suggestions to utilize the information.

Analysis of BIM Utilization for On-site Construction Planning in Modular Construction Project (모듈러 건축공사의 현장시공계획수립을 위한 BIM 활용성 분석)

  • Lee, Myung-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.3
    • /
    • pp.263-272
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that have contributed to advancements in the construction industry. However, the utilization of BIM in current modular construction projects is limited; moreover, there are no specific guidelines pertaining the applications of BIM in modular construction projects. Therefore, this study aims to analyze the utilization of BIM for onsite construction planning in modular construction projects. First, a realistic BIM application was selected through literature review and expert interviews. Then, the construction plan of the modular projects was analyzed to classify the BIM application items into five different categories. The utilization of BIM in each category was then analyzed in terms of necessity and efficiency using a questionnaire. Finally, the BIM Utilization Index (BIM UI) was suggested based on the findings of the survey. As a results, the BIM UI for module point details, lifting plan, other installation details, site layout plan, and schedule plan was 0.811, 0.787, 0.770, 0.729, and 0.699, in the descending order of usability. In addition, through the findings of the study and interviews with experts, a case study for implementation of BIM in modular construction plan was conducted. The results of this study can be used as application guidelines for BIM in future modular construction projects.

The Development of Automated Building Equipment Design Process System Using 3D CAD (3차원 CAD정보를 활용한 건축설비설계 프로세스 시스템 개발방향)

  • Lee, Dong-Hyun;Jung, Woo-Shin;Kim, Young-Don;Song, Kyoo-Dong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.269-274
    • /
    • 2008
  • It is attempted that the standardization of the construction, globalization of the engineering construction and an information oriented construction spread by setting a goal of the advanced construction industry and productivity increase of human resources within the country. Hence, it has been brought in the information oriented construction of BIM based technology for the field of construction and equipment of Korea. The current study that examines the possibility of application of 3D ; that is BIM based programs of building equipment, and make better the problems of 3D building equipment system through the Pilot Test, indicates the way of growth development about the construction of building equipment process system.

  • PDF