• Title/Summary/Keyword: 3D BIM

Search Result 401, Processing Time 0.024 seconds

Improved Method for Increasing Maintenance Efficiency of Construction Structure Using Augmented Reality by Marker-Less Method (비마커기반 증강현실을 이용한 건설 구조물 유지관리 효율화 방안)

  • Moon, So Yeong;Yun, Su Young;Kim, Hyeon Seung;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.961-968
    • /
    • 2015
  • As BIM has been increasingly applied to building project recently, its application to civil engineering project is also on the rise. As construction structures have been expanded and complicated in a size and type, the information for handling maintenance process has also increased. Thus, to actively utilize the BIM information created at the design stage, this study has been carried out to establish a maintenance system using a marker-less based augmented reality method, by presenting a maintenance system for the construction structures using augmented reality. A SURF algorithm is used to link the 3D objects in the design and construction phases to the maintenance phase. The presented method in this study can increase the utilization of 3D information created at the design stage, by offering an augmented reality technology at the maintenance stage. The method could also improve the efficiency of visual inspection on construction structures by augmenting 3D model of a bridge structure.

A System Development of Quantity Data Type Analysis for BIM based Automation of Estimation Framework (BIM기반 견적자동화 체계구축을 위한 물량 데이터 유형 분석 체계 개발)

  • Lee, Jae-Joon;Shin, Tae-Hong;Kim, Seong-Ah;Kang, Myung-ku;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.744-747
    • /
    • 2008
  • Quantity information focused on a design drawing plays a critical role in a decision making related to cost for project participants during project life cycles. Related participants absolutely depend on quantity take-off working which produces the quantity information by hand, and then a worker's mistake often causes many errors. The difference of quantity by the know-how of the person in charge of the estimation also occurs. In addition, the worker passes through the whole quantity take-off processes again in case of re-working for quantity take-off produced by a change order. The requirements about the automated estimation increase because of the needs for the accurate quantity take-off and dealing with the change order and recently, the studies about the automated estimation working process based on 34 cad model from 3d cad modeler are attempted in various viewpoints. However, the existing studies reach the limits such as common quantity data type framework for getting Quantity information. Focused on a certain 34 cad modeler and BIM based automation of estimation using it Therefore, the objective of this study is to develop the a series of system which can extract, analyze, and verify Quantity Data Type in modeler to automate quantity take-off originated from various 3d cad modelers as a foundation study for BIM based automation of estimation framework.

  • PDF

A Study of BIM-based Furniture Libraries for Interior Planning (실내공간계획을 위한 BIM기반의 가구 라이브러리 기초연구)

  • Choi, Gil Dong
    • Journal of the Korea Furniture Society
    • /
    • v.27 no.3
    • /
    • pp.220-225
    • /
    • 2016
  • Recently, As the construction industry has been growing in size and complexity, the utilization of BIM is increased to improve effective management and integration of information. BIM (Building Information Modeling) has been focused on architecture, engineering, construction and maintenance field. However, There is a lack of BIM research on Interior Architecture fields. So It needs more research in this area. Through a previous study that review on BIM applicability of building interior design, this study propose a process of Plan and utilization planning for building Interior design based on BIM. As a result of this, BIM library, 3D simulation, automation for quantity estimation and information management can improve efficiency of business and help decision making for plan.

Rule-based Review and Automated Quality Management Process of BIM deliverables for Railway Infrastructures (철도인프라 BIM 성과물의 품질검토 절차 및 룰 기반 적용성 검토)

  • Kang, Jeon-Yong;Hasan, Syed Mobeen;Min, Ji-Sun;An, Joon-Sang;Choi, Jae-Woong
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.23-34
    • /
    • 2022
  • In the current 2D-based design, design reliability is lowered due to interference and inconsistency between plans, errors in drawings and quantities, etc. At the time of transition to BIM-based 3D design, it is necessary to expand the reliability and usability of BIM by eliminating these errors from the design stage through securing the quality of the BIM digital model. Therefore, in the railway infrastructure design stage, the quality management process and standards of the BIM digital model were defined and quality management index were developed. Based on the rule extracted from the quality management index, a pilot quality management was conducted in connection with the commercial Model-Checker rule, problems and improvement plans were derived, and a rule-based automated quality management plan was prepared.

A Case Study on Construction Management Based on BIM Data (BIM 데이터 기반 현장 시공관리 사례 분석 연구)

  • Lee, Dong-Jun;Hyun, Jin-Oh;Min, Sung Gyu;Lim, Ji-Yong;Shin, Min Cheol;Kwon, Suk Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.2
    • /
    • pp.223-229
    • /
    • 2024
  • The Ministry of Land, Infrastructure and Transport presented the "Construction Industry BIM Enforcement Guidelines Constructors Edition" to reflect the design BIM data in the construction stage. The enforcement guidelines were prepared with the aim of providing guidelines for detailed common implementation plans such as minimum BIM business methods and procedures necessary for ordering, designing, and construction stages for the full-scale BIM application in all fields of the construction industry. In this study, interference and design errors were examined based on the enforcement guidelines, and the application effects were grasped for various sites where equipment placement and operation plans were established. As a result, intuitive examination was possible by comparing the digital field 3D model and the planned model in one space, and the optimum equipment arrangement and operation plan were derived through simulation examination according to the execution stage.

A Study on the Utilization of BIM Model using Vertex Data-based Division Method (정점데이터기반 분할기법을 활용한 BIM모델의 활용 방안 연구)

  • Jae-Yeong, Hwang;Jae-Hee, Lee;Leen-Seok, Kang
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.123-134
    • /
    • 2023
  • The BIM (Building Information Modeling) model created in the design stage can be used for prior review and schedule management for the construction stage. However, in the case of actual BIM application cases, additional work is required, such as creating a new model suitable for the construction stage, rather than using the 3D model in the design stage, due to the difference in the purpose of use between the design stage and the construction stage. Therefore, in this study, a division function of BIM model is proposed as a method of recycling it in the construction stage without a remodeling process. In addition, the application to the actual BIM model and the 4D CAD system linkage of the divided object and the comparison with the existing division method are used to verify the usability.

A study on the Practical Adaptation of BIM Programs for Architectural Education (건축교육에서 BIM 프로그램 적용에 관한 연구)

  • Shin, Dong-Chul
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.11 no.4
    • /
    • pp.57-66
    • /
    • 2011
  • The advent of BIM(Building Information Modeling) design process based on the digital media has brought innovation to the production and management of AEC industry. Accordingly the need for educating BIM professionals has been radically increased both in the real world practice and in academia. Some developed countries have already been studying and establishing the optimized curriculum in the academic architecture courses for BIM based education with multi_efforts using the digital media as design processing tools focused on educating architectural professionals with creativity and productivity. However in the domestic education systems, it is hardly found that researches and curriculums deal with the BIM education in the academia. Thus the objective of this paper is to investigate the architectural design pedagogy in the advanced digital media setting in response to the urgent need for BIM education. This study focuses on developing the curriculum based on practical adaptation of BIM programs for architectural education. It aims to provide students with the basic understanding of BIM theory and the practice of BIM tools as an instrument enhancing the creativity for architectural design. Thus this study proposes an BIM curriculum for the students who first encounter the notion and knowledge of BIM during their academic years. And the education result after the application of this curriculum has been analysed through the students questionnaires before and after the lecture.

Development of a Prototype for an Earthwork BIM Environment (건설현장 굴착작업을 위한 토공 BIM 프로토타입 개발)

  • Moon, Sungwoo;Son, Jihong;Hong, Soonheon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.3
    • /
    • pp.707-714
    • /
    • 2015
  • The national government is pushing hard the adoption of the BIM (Building Information Modeling) technology in the construction industry. The BIM application provides a visualized environment where the construction manager can inspect the structure of buidling structures. The application also provides information on activity progresses as well as earned values. However, BIM is mostly applied to visualize a structural object with definite forms. The BIM technology needs to be extended to include an object with non-definite forms such as earthwork operations. The objective of this study is to present a prototype of earthwork BIM in the construction operation. The prototype has been built on the attributes of geological information, construction equipment and positioning. The prototype of earthwork BIM shows a 3D graphic simulation of construction equipment moving around for digging and loading.

A Study on the Link of Building Information and Cadastral Information as Spatial Information (공간정보로서의 지적정보와 건물정보의 연계에 관한 연구)

  • Kim, Chang-Hwan;Lee, Won-Hui
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.17 no.3
    • /
    • pp.93-103
    • /
    • 2014
  • Regarding to the cadastral information and building information as a spatial information, studies on linking between cadastral records and building information, or integration methodology on 2D based building map and land information were proposed. Cadastral information has grown its values by cadastral resurvey project and cadastral confirmation survey. There is a tendency of BIM in the design stage which is not just simple 3D dataset and BIM is spreading in public and private sectors. However, studies on the linkage between building information and cadastral information is relatively weak comparing to the BIM spreading. One of the main features that have been improved in IFC4 is the interoperability with GIS. In this regards, the researcher propose several revision methods to link cadastral information to building information. Cadastral information needs to improve the quality of the dataset's such as unifying the different coordinate systems and preparing continuous cadastral map. For buildings, standardization of BIM in the public and private sectors is urgent task. IFC4 and upcoming IFC5 are international standards which need to be considered and BIM reverse engineering for the existing buildings is necessary for the public utilization in the near future.

Study on Substitution Effect caused by Application of BIM Simulation System to Mock-up Site (시공단계 현장 Mock-up의 BIM 기반 시뮬레이션 기법 적용에 의한 기대효과 분석 연구)

  • Jang, Se-Jun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.147-151
    • /
    • 2008
  • Construction project is completed through several stages and problems of each stage affect directly not only now but also next. Defect of 2D drawings influence in construction phase, and it make many loss on project. Nowadays we practically use real Mock-up test in construction sites to solve the problems. But it also has many problems which are waste much money and time. Therefore, this study tries to analyze effect that is occurred by appling BIM Mock-up simulation instead of real Mock-up execution. These analysis is conducted by comparing two construction building site. These have same shape but one is made for BIM Mock-up, and another is real Mock-up. Comparison points of view are cost, time and operator's satisfaction. It is expect that BIM Mock-up is more effective at low cost and on shorter time. But our analysis show that each are conducted different part of function. So new Mock-up type is required. Hybrid Mock-up is combine real mock-up with BIM simulation and it can minimize risk of project.

  • PDF