• Title/Summary/Keyword: 2nd Construction

Search Result 263, Processing Time 0.028 seconds

Experimental Research on 2nd generation of Cyanobacteria Living Building Material (2세대 남세균 혼입 생체 건축 자재 생산을 위한 잔골재-젤라틴 복합체의 실험적 연구)

  • Park, Jiyoon;Son, Dasom;Yi, Chongku
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.197-198
    • /
    • 2023
  • Construction waste takes about 50% of total industrial waste. Researchers focuses to decrease the amount of construction waste by recycling the waste during the construction site. However, research about recycling the gelatin-sand composite is not yet been studied. This research is an experimental research on recycling the total specimen of gelatin-sand composite. Two methods were held when making the 2nd generation of the gelatin-sand specimen. As a result, there was no difference in flexural strenght between two different method of 2nd generation of specimen. However, the second method of 2nd generation showed about 20% higher compressive strength than the first method.

  • PDF

A Study on the Buildings of 2nd Construction of Silla Bunhwangsa temple in the mid-8th century (8세기 중반 신라 분황사 중건가람 건축 연구)

  • Kim, Sookyung
    • Journal of architectural history
    • /
    • v.30 no.6
    • /
    • pp.71-80
    • /
    • 2021
  • This study tries to shed light on character and architectural features of the 2nd construction of Bunhwangsa temple in the mid-8th century. The site of Bunhwangsa Temple is divided into upper and lower areas based on retaining walls running from northwest to southeast, and the main area of the temple centered on Geumdang(the main hall) is located in the upper area. Space composition of the lower area including Wonji(a garden pond) and Gangdang(a lecture hall), is noteworthy in that Bunhwangsa Temple was constructed in a deviating way from rigorous constructional disciplines and used their space efficiently. The Geumdang in the 2nd construction was the largest worship hall with 7×6 bays. The hall was designed to divide its space into two ; the core space was surrounded by outer space. Each gap between columns in the hall was narrowed from center to outer. The main construction of the Geumdang was built as a stable structure with lead-to corridors. This was a much-advanced style than Geumdang at Hwangnyongsa Temple. The Gangdang is presumed to be a large building site as a typical Gangdang style in the Silla era. It was built in the late 9th century and was located in the northern part of the retaining walls. The composition of the middle gate and southern corridors were in double and long corridor style and they were located in front of the 2nd construction. This style coincided in the form of the architectural style of the Hwangnongsa Temple. The 2nd construction of the Bunhwangsa Temple was smaller than the Hwangnongsa Temple. However, it was a prestigious architecture.

A Study on the Layout of the 2nd construction in Hwangnyongsa Buddhist Temple Site (황룡사 중건가람배치 연구)

  • Kim, Sookyung
    • Journal of architectural history
    • /
    • v.23 no.4
    • /
    • pp.81-90
    • /
    • 2014
  • This paper aimed to identify the variation of layout in Hwangnyoungsa buddhist temple site based on studying published the excavation research paper and texts related to layout. According to earlier studies, in 1st construction period(553~569) of Hwangnyoungsa, there were trisection spaces with one main hall and two corridors in inner part and then in 2nd period(584~645), unified one. But actually trisection spaces had been maintained until the middle part of 8th century. And in each space there was the main hall with large yard. That is the 2nd period layout of Hwangnyoungsa. For the attainment this result, each building remains are judged under duplicated situation which one was the previous and next by consideration of the construction condition and special features of foundation. Although the meaning of trisection system of Hwangnyoungsa is similar with the layout of ancient palace, it could be said to derive from accumulation excavation research in Silla's archeological site and such studies.

Numerical Analysis of Utility Tunnel Movement under Reclamation Ground (매립지반 지하공동구의 수평이동원인에 대한 수치해석적 분석)

  • Yoon, Woo Hyun;Hwang, Chulsung
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.5
    • /
    • pp.35-40
    • /
    • 2013
  • Recently reclamation land is largely developed to utilize the land according to economic growth. The soil of landfill is soft, low shear strength, which makes it difficult to use the equipment. A large movement is occurred on the utility tunnel under construction. The inclined land with high water level and underground facilities are widely distributed and the excess pore water pressure may occur under construction similarly to this study. Some different conditions are made to design result, such as 4m of soil piling near the construction area, heavy rainfall during 2nd excavation that may cause flow liquefaction. To analyze the cause of transverse lateral movement, Three dimensional analysis are performed to four load cases, which is original design condition, flow liquefaction by heavy rainfall, unsymmetric lateral soil pressure, and both of them simultaneously. Ten steps of full construction stage, 1st excavation for utility tunnel, construction of utility tunnel, 1st refill, piling soil from 1m to 4 m, 2nd excavation for drainage culvert, liquefaction around the utility tunnel, construction of drainage culvert and 2nd refill, are take into account to investigate the cause of movement.

Study on Asymmetric Settlement Trough induced by the 2nd Tunneling of Twin Shield Tunnels in Clay (점토지반 병설쉴드터널에서 후행터널 굴착에 의한 비대칭 침하형상 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.10
    • /
    • pp.55-63
    • /
    • 2021
  • The construction of shield tunnels is being expanded from the small-bore tunnels such as power, telecommunications, water supply, and sewerage pipes to the large bore tunnels such as road and railway tunnels with the advancement of the shield TBM (Tunnel Boring Machine) manufacturing technology. Accordingly, the construction of twin shield tunnels is increasing. Peck (1969) reported that the surface settlement trough is well described by a Gaussian distribution on a single shield tunnel. Hereafter, many studies about the surface settlement trough were performed by the field measurement, laboratory model test, and numerical analysis. This study confirmed that the additional surface settlement trough induced by the 2nd tunneling were well described by using each Gaussian curve for the right and left sides of the settlement trough.

Interdisciplinary Procedure for Scour Estimation at Inchon 2nd Bridge Piers (인천 제2연육교 세굴문제 해결을 위한 학제간 공동연구 방안)

  • Yeo, Woon-Kwang;Kim, Jeong-Hwan;Lee, Yang-Ku;Kim, Tae-In;Kim, Jong-In;Kwak, Ki-Seok;Lee, Jong-Kook;Kwak, Moon-Soo;Kim, Moon-Mo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.71-80
    • /
    • 2005
  • More than 100 bridges have been annually collapsed or seriously damaged by scouring in Korea. It is extremely hard to understand the complicated scour mechanism and estimate the scour depth with accuracy in fields, however since scouring is a very complex manifestation of sediment transport unable to describe with a simple mathematical tool. In order to obtain the reasonable solution to bridge scouring, therefore, the interdisciplinary co-operation is strongly recommended. In this study the special task force team for the scour problems around Incheon 2nd bridge piers is made, in which all kinds of scour oriented researches such as oceangraphic survey, hydraulic model test, numerical simulation, scour rate test, real-time scour monitoring, etc will be carried out. This paper provides this interdisciplinary procedure in details.

  • PDF

A Relative Study on the Displacement of Earth Retaining Wall by 2 and 3 Dimentional Analysis (2차원 및 3차원 해석에 의한 토류벽의 변위에 관한 비교 연구)

  • Park, Chun-Sik;Park, Hae-Chan;Kim, Jong-Hwan;Park, Young-Jun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.801-810
    • /
    • 2010
  • Until now, design of Earth Retaining is practiced by 2nd dimensional analysis for convenience of analysis and time saving. However, the construction field is 3rd dimension, in this study, practised the 3rd dimensional analysis which can reflect the field condition more exactly the scope of earth retaining wall, and researched about the effective and economical way of design, compared and reviewed with the results, by practising both the 2nd and 3rd dimensional analysis. existing 2nd dimension. the depth of excavation, depth of embedded and soil condition. As result, under the whole conditions, more displacement came to appear to the value as result of 3rd dimensional analysis more than the result of 2nd dimensional analysis. Accordingly, the displacement by the 2nd dimension analysis is underestimated. Moreover, results of 2nd and 3rd dimensional analysis, there is no difference at displacement, when the depth of embedded is 0.5H, 1.0H and 1.5H, but Displacement of 1.5H is smaller than 0.5H, 1.0H. That is, the bigger the depth of embedded becomes, the displacement of Earth Retaining Wall appeared smaller. The displacement of earth retaining wall according to depth of excavation appeared bigger, when the depth of excavation is increased. In the meantime, when the soil condition is different, in the 2nd dimensional analysis, the displacement appeared biggest, in case of the clay layer, but in the 3rd dimensional analysis, in the beginning of excavating, the displacement of earth retaining wall appeared bigger in case of clay layer, but as excavating is in progress, the displacement of both compound soil layer and sand layer appeared big.

  • PDF

A Study on Application Methods of Satellite Images for the Construction Projects over Extreme Cold Regions -Focus on the Construction Case of 2nd Antarctic Base- (극한지 건설사업 진출을 위한 위성영상 활용방안 연구 -남극 제2기지 건설 사례를 중심으로-)

  • Hong, Chang-Hee;Kim, Tae-Hoon;Bae, Gyu-Jin
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.13 no.4
    • /
    • pp.148-156
    • /
    • 2010
  • For the reasons such as resource development, an interest in the extreme cold regions has been increasing in recent years. Therefore, this study aims to suggest the application methods of satellite images for the construction projects over extreme cold regions. Because extreme cold regions including the Antarctic is generally far and difficult to access, the satellite images are useful to monitor the extreme cold regions. In this study, satellite images can be used in the overall construction process and the application methods presented through the review of the case studies and the related literature.