• Title/Summary/Keyword: 2D 도면

Search Result 195, Processing Time 0.024 seconds

The Implementation of 3D Measurement System by Image Pointing Method (영상선점 기법에 의한 3차원 측위 시스템 구현)

  • 송승호;김용배;주영은;엄대용
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.2
    • /
    • pp.191-197
    • /
    • 2002
  • Recently, with the eye-opening progress in the related field of computer, the development of high resolution digital camera enables more precise positioning in digital photogrammetry, and a lot of interest has been concentrated on its application. In this study, the algorithm and system which enable the measurement of 3D point more easily was developed by image pointing method using digital image, when the digital map of the Cultural Properties of Architectures in Modern Ages is drawn by photogrammetry. As a result, we can reduce the limitation of surveying control point, exposure condition, and construct the digital map and 3D model of architecture more efficiently.

A Research on how to turn Object oriented Database of civil materials to practical use (객체지향 Data Base를 이용한 토목자재 정보의 이용방안 연구)

  • Kwon, Oh-Yong;Han, Chung-Han;Kim, Do-Keun;Jo, Chan-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.708-711
    • /
    • 2008
  • This study is intended to build research for ways to utilize material information in the design and working business for public works. The contents and results of this study can be classified into object-oriented DB application to bridge construction and object-oriented DB utilization of civil material information. First, application of object-oriented DB to bridge construction 1) constructs the work unit of classified work table as an object(Each object constructs material information on the statement of quantity calculation as data), 2) constructs object-oriented DB for superstructure and substructure of PSC Beam bridge, 3) leads to the research for ways to utilize materials by developing 3D bridge prototype with REVIT structure. Secondly, ways to utilize object-oriented DB for civil material information identified the possibility for utilizing it in making 2D drawings for design work, preparing materials list, analyzing structure for working businesses, selecting and purchasing materials, managing process and maintaining. It is suggested that the results of this study should be applied to all bridge constructions through test-bed and additional studies so as to secure the credibility of the results of this study.

  • PDF

A Study on Restoration and Utilization of Recorded Archaeological Data (기록화된 고고자료의 복원과 활용방안에 대한 연구)

  • Heo, Ui-Haeng
    • Journal of Digital Contents Society
    • /
    • v.18 no.4
    • /
    • pp.723-731
    • /
    • 2017
  • The restoration of archaeological data was carried out using photographs and drawings left as past records. It can be divided into ruins and artifacts. The restoration of the ruins was performed by modeling the individual parts and parts left by the photographs, aligning them and synthesizing them, and reconstructing them three-dimensionally as one object. Restoration of artifacts was performed on both photographs and drawings. After the modeling work is prioritized through the photographs, there is a method of restoring the original image by modifying the texture image of the damaged part of the modeled artifact, or restoring the original image by modeling and synthesizing the deleted part in the artifact. The restoration of the artifacts through the drawings was carried out by three - dimensional modeling and reconstruction through real mapping of images. The reconstructed archaeological data can be used in various directions. In particular, it is possible to verify and compare the results of the numerical analysis and interpretation of the past 2D data, and to provide a more accurate analysis plan in the future.

Developing a Drawing Template for BIM software to Improve BIM-based Drawing Work Efficiency in the Construction Document Phase (실시설계단계 BIM 기반 도면 작업 효율 향상을 위한 도면화 템플릿 개발)

  • Kim, Yi-Je;Kim, In-Chie;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.98-109
    • /
    • 2020
  • Based on the prior research which developed the consistency review checklist of the BIM model and 2D drawing through the drawing analysis of the construction documents phase, the apparent limits of the existing template and the template development items were derived. As well, the BIM-based drawing templates of the construction documentation phase were developed and verified using ArchiCAD BIM software. The developed template was then applied to the actual project model in the construction documents phase, and, as a result, 50% of existing work elements could be utilized as templates. This is an increase of more than 30% over the existing template utilization elements, and it is analyzed to be effective in practical application and utilization. Based on the results of this study, if the BIM model construction criteria matching the drawing's utilization purpose are presented, while at the same time the BIM data interlocking and drawing template development studies are conducted, the utilization of BIM data can be maximized and additional drawing work can be minimized to increase the percentage of template utilization elements. In addition, it is believed that this can employed to address functional and institutional problems of BIM-based drawing and make a contribution to the activation of BIM.

Survey on CAD Softwares Used in Small Contractors and Improvement to College CAD Education (중소규모 건설회사 CAD 활용현황과 대학교육 방안)

  • Choi, Heebok;Jang, Myung-Houn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.169-175
    • /
    • 2016
  • A survey of small-size contractors in Jeju was conducted to investigate college graduate's CAD (computer aided design) competence. Most of small-size contractors use CAD softwares to review and update drawings submitted from an architect. This research analyzed the curriculum of the architectural engineering in several national universities. The CAD classes have 4 or 6 hours per week and use AutoCAD primarily. This research proposes that a CAD class needs at least 6 hours per week, 2D drawing is the main theme in the curriculum, and exercises to make 3D models are also included in the CAD class. The improved methods, Internet cafe and real time feedbacks using a smartphone, to evaluate the reports and exercise results are necessary.

A Study on the 2D and 3D configuration management for Maintenance CALS system (유지보수체계 시스템구축을 위한 도면 및 3차원 형상관리 프로그램개발에 관한 연구)

  • Lee H. Y.;Park K. J.;Ahn T. K.;Yoon S. K.;Suh M. W.
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.819-825
    • /
    • 2004
  • The maintenance CALS system for car of urban transit is a part of standardization and development of urban transit system, and We have been performed the establishment of maintenance CALS system from 2001 to 2005. These 2D and 3D configuration management system are utilized in a variety of CALS system for user's convenience and safety in maintenance. In this paper, the 2D and 3D configuration system will be discussed for necessity and possibility. This system include RAMS(reliability, availability, maintainability and safety) of the vehicles shall be enhanced in the future.

  • PDF

A Study on the 2D and 3D configuration management for Maintenance CALS system for Car of Urban transit (도시철도 유지보수체계 정보화시스템 연구개발을 위한 도면 및 3차원 형상관리)

  • 이호용;박기준;안태기;한석윤;서명원;이승일
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.238-243
    • /
    • 2002
  • The maintenance CALS system for car of urban transit is a part of standardization and development of urban transit system, and We have been performed the establishment of maintenance CALS system from 2001 to 2005. These 2D and 3D configuration management system are utilized in a variety of CALS system for user's convenience and safety in maintenance. In this paper, the 2D and 3D configuration system will be discussed for necessity and possibility. This system include RAMS(reliability, availability, maintainability and safety) of the vehicles shall be enhanced in the future.

  • PDF

A Study on the Technique of Automated Mapping for Facility Management System (시설물 관리체계를 위한 도면자동화 기법에 관한 연구)

  • 박운용;차성렬;김진수
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.15 no.2
    • /
    • pp.149-156
    • /
    • 1997
  • This study extracts the several informations by computerizing the maps of the new city, i.e. Yang-San, MuI-Gum. This cities are being constructed by Land Coporation, and a map of province based on 1:50,000 scales were digitalized depending on topography by digitizer. Several information was taken, by computerizing a existing design maps, with digitalized maps used. Also, there is map number based on each scale, and measure a settlement of the foundation for constructing a facility in a study region, then intend to use information. This paper aims at using old data such as ancient writing books by computerization permanently.

  • PDF

Development of an Extension Model based on Three Dimensional Wireframe Model for KOSDIC Format in the Construction Field (건설 분야 도면정보 교환 표준을 위한 3차원 와이어프레임 기반의 확장 모델 개발에 관한 연구)

  • Kim I.H.;Seo J.C.;Won J.S.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.10 no.3
    • /
    • pp.179-187
    • /
    • 2005
  • The usage of mixed 2D and 3D CAD data of commercial CAD systems is required in the construction practice. Sometimes 3D wireframe model is required by end-users when 2D CAD data is delivered. However, current KOSDIC can not represent 3D CAD data, because it has been developed as a 2D drawing delivery standard. Therefore, this study is to provide exchange and sharing of mixed 2D and 3D CAD data that add 3D wireframe model in the KOSDIC. To achieve this purpose, the authors have investigated the 3D CAD entities of commercial CAD systems, and have analyzed STEP standards providing 3D wireframe model. The result, the authors have extracted 3D CAD common entities based wireframe model which shall be added in the KOSDIC. This study can be beneficial by using the developed data model for heterogeneous CAD systems, and by providing the representation of mixed 2D and 3D CAD data in construction practice such as GIS, piping system, and so forth.

A Study on the 3D Precise Modeling of Old Structures Using Merged Point Cloud from Drone Images and LiDAR Scanning Data (드론 화상 및 LiDAR 스캐닝의 정합처리 자료를 활용한 노후 구조물 3차원 정밀 모델링에 관한 연구)

  • Chan-hwi, Shin;Gyeong-jo, Min;Gyeong-Gyu, Kim;PuReun, Jeon;Hoon, Park;Sang-Ho, Cho
    • Explosives and Blasting
    • /
    • v.40 no.4
    • /
    • pp.15-26
    • /
    • 2022
  • With the recent increase in old and dangerous buildings, the demand for technology in the field of structure demolition is rapidly increasing. In particular, in the case of structures with severe deformation of damage, there is a risk of deterioration in stability and disaster due to changes in the load distribution characteristics in the structure, so rapid structure demolition technology that can be efficiently dismantled in a short period of time is drawing attention. However, structural deformation such as unauthorized extension or illegal remodeling occurs frequently in many old structures, which is not reflected in structural information such as building drawings, and acts as an obstacle in the demolition design process. In this study, as an effective way to overcome the discrepancy between the structural information of old structures and the actual structure, access to actual structures through 3D modeling was considered. 3D point cloud data inside and outside the building were obtained through LiDAR and drone photography for buildings scheduled to be blasting demolition, and precision matching between the two spatial data groups was performed using an open-source based spatial information construction system. The 3D structure model was completed by importing point cloud data matched with 3D modeling software to create structural drawings for each layer and forming each member along the structure slab, pillar, beam, and ceiling boundary. In addition, the modeling technique proposed in this study was verified by comparing it with the actual measurement value for selected structure member.