서울지하철 6호선 건설계획 (Planning and Design of Seoul Subway Line 6)

  • 박계병;이인근
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1993년도 지하공간 건설기술에 관한 서울 심포지움 논문집
    • /
    • pp.3-30
    • /
    • 1993
  • To ease traffic congestion Seoul Metropolitan Government formulated the 2nd Phase of Seoul Subway Construction Scheme in 1989. The scheme calls for the construction of %60 km of subway which includes addition of 4 more subway lines and extension of 3 existing subway lines in addition to the existing 118 km of subway. As a final stage of the scheme subway line 6 is under planning and design. The line 6 is 36.1 km-long route connecting Ungam-Samgakchi-Changsin-Sinnae. Except for the depot main line wilts be underground and major construction methods are cut and cover and tunnelling. As a tunnelling method New Austrian Tunnelling Method will be adapted. The line will be opened by the end of 1997. With the completion of the line Seoul will have 278 km of subway network and the transport share by subway will be increased from 25% in 1992 to 50% in 1997.

  • PDF

전동차용 IGBT형 추진제어장치의 6호선 본선 만차 시험에 관한 연구 (A Study On Full Load Test of IGBT Type Propulsion System for Electric Railway in SMG 6 Line)

  • 박건태;정만규;고영철;방이석;서광덕
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 추계학술대회 논문집
    • /
    • pp.666-673
    • /
    • 2000
  • This paper describes the full load test results of IGBT VVVF inverter for the railway propulsion system. The 1,650kVA IGBT VVVF inverter has been developed. Therefore, the field test is performed in SMG 6 Line to confirm its the reliability and performance. The train consists of 4M4T(4 Motor car 4 Trailer Car) and the electrical equipment for field test are as follows VVVF inverter 4 sets, 16 traction motors and 2 SIVs. The propulsion system is composed with IC4M(1-Controller 4-Motors). The results of propulsion system which have the excellent acceleration/deceleration and the jerk characteristics as well as starting ability on slope are taken through the field test.

  • PDF

열정! 건설현장 - (주)포스코건설

  • 정태영
    • 안전기술
    • /
    • 제203호
    • /
    • pp.21-23
    • /
    • 2014
  • 지난 1984년 개통된 88올림픽 고속도로는 '전라남도 담양군'과 '대구시 달성군'을 연결하는 고속도로로 동서교류를 확대하는 큰 역할을 하고 있다. 하지만 현재는 국내에서 유일한 왕복 2차선 고속도로인 것은 물론 중앙분리대가 없는 유일한 고속도로로 유명하다. 즉 늘어나는 교통량을 감당하지 못하고, 안전성에도 문제가 있는 것이다. 때문에 현재 88올림픽 고속도로가 포함된 제12호선 고속국도에서는 왕복 4차선으로의 확장공사가 한창 진행 중이다. 오늘의 주인공인 (주)포스코건설은 고속국도 제12호선의 담양~성산 간 확장공사 제3공구 현장을 책임지고 있다. 확장공사가 이뤄지는 목적이 고속도로 운전자들의 안전성 제고에 있는 만큼 이곳에서는 그 취지가 무색해지지 않게 근로자들의 안전을 최우선 가치로 여기고 있다. 이곳 현장에서 어떤 안전활동이 전개되고 있는 지 찾아가 봤다.

  • PDF

천부 터널 굴착에 따른 지하수 유동체계 변화 모사 - 현장 적용 사례

  • 차장환;나한나;구민호
    • 한국지하수토양환경학회:학술대회논문집
    • /
    • 한국지하수토양환경학회 2005년도 총회 및 춘계학술발표회
    • /
    • pp.389-392
    • /
    • 2005
  • Visual MODFLOW를 이용하여 서울지하철 7호선 706공구에 계획된 터널 굴착에 따른 지하수 유동계의 변화를 모사하였다. 경계조건은 모델 영역 내 하천(굴포천)의 경우 일정수두경계, 터널 굴착 구간의 경우 $0.39{\sim}0.58m^2/day$의 전도계수를 갖는 배수경계(Drain), 터널 개착구간은 Inactive cell이 존재하는 일정수두경계 조건으로 설정하였다. 모델 보정은 현장시험을 통해 구해진 수리상수는 일정하게 유지하고 함양률을 변화시키면서 실시하였으며, 정류모사를 반복 수행하여 최적의 함양률(150 mm/yr)을 결정하였다. 모사 결과 터널 구간으로의 지하수 유입량은 굴착 및 개착 완료 시 $623m^3/day$, 터널 완공 후 정류상태의 경우 $584m^3/day$인 것으로 나타났다. Zone Budget을 이용한 유출입량 분석 결과 정류 상태 시 터널 내로 유입되는 지하수의 69%는 터널 인근 하천수의 유입에 기인하며, 나머지 31%는 주변 지역에서 함양된 지하수에 의한 것으로 나타났다.

  • PDF

건설공사의 용지경계 불부합에 관한 비교분석 (Comparative Analysis of a Boundary Discordant of Land at Construction Work Survey)

  • 한성만;박태식
    • 한국측량학회:학술대회논문집
    • /
    • 한국측량학회 2010년 춘계학술발표회 논문집
    • /
    • pp.327-332
    • /
    • 2010
  • 용지경계의 불부합은 공사 현장의 용지 보상 때마다 발생되는 커다란 문제점으로 대두대고 있으며 이로 인한 공사비증액, 재설계, 공사지연등 많은 국가적 예산을 소모하고 있는 실정이다. 이에 금번 연구에서는 "광명시대로 3-15호선 외 2개도로 개설공사"에 대하여 용지 불부합에 대하여 그 원인을 분석 하였다. 그 결과 연속지적도와 지형의 불일치로 인하여 공사용지보상선이 3m-4m 좌측으로 편측되어 있음을 알 수 있었으며 이로 인한 추가 용지보상과 재설계가 불가피 하게 되었다. 향후 연속지적도의 좌표체계의 정확도 개선 및 수정 그리고 지형 지적도의 일치하는 작업이 시급한 것으로 나타났다.

  • PDF

서울시 지하철 3, 4호선 건설에 따른 개발리익 산정에 관한 연구 (A Study on Value Capture Using the Data of Subway Line#3 and Line#4 in Seoul.)

  • 원제무;박용훈
    • 대한교통학회지
    • /
    • 제7권2호
    • /
    • pp.53-69
    • /
    • 1989
  • The management of subway business in large cities has recently become more difficult because of increased construction and operation costs. To cope with this situation, it is necessary to examine the methods of obtaining returns on development profits of land value rises that occur due to subway construction along subway lines, For this purpose, we examined the actual situation of rises in land values brought about by the construction of subway line #3 and line #4 in Seoul with application of three methods. In this research, we have calculated a basis of the development profits produced by the construction of subway line. According to the results, development profits produced by the subway construction differ depending on the method adopted. If, however, we accept line comparison analysis method, the total development profits amount to 557,3 billion won that is equivalent to 37 percent construction cost.

  • PDF

건설안전리포트: 소통과 배려로 새로운 안전을 창출하는 현장 - 계룡건설 대전도안지구 동서대로(광로2-10호선) 건설공사 현장

  • 최종덕
    • 안전기술
    • /
    • 제160호
    • /
    • pp.12-14
    • /
    • 2011
  • 대전 서남부 지역 주거환경 개선을 위해 도안신도시가 한창 개발주인 가운데 일부 아파트는 벌써 입주가 완료되면서 신도시로서의 면모가 차츰 갖춰지고 있다. 이 시기에 맞춰 교통의 흐름을 원활히 하기 위한 터널공사와 교야 공사도 함께 분주히 진행되고 있다. 오늘 찾은 현장이 바로 터널공사와 교량고사를 담당하고 있는 계룡건설 대전도안지구 동서대로 건설현장(현장소장 이기욱)이다. 총 연장 1.82km의 편도 4차선터널과 3백여미터의 교량 건설이 한창인 이 곳은 중장비가 연신 들락거리는 가운데 각종 차량과 인력이 유기적으로 들어가며 안전시공, 무재해 시공에 연염이 없다. "신바람 나게 즐기면서 재미있게" 일을 하고 있는 계룡건설 대전도안지구 동서대로 건설현장(이하 동서대로 현장)을 찾아 이들만의 안전 이야기를 들어 봤다.

  • PDF

서울시 대중교통 이용자의 통행패턴 분석 (Travel Patterns of Transit Users in the Metropolitan Seoul)

  • 이금숙;박종수
    • 한국경제지리학회지
    • /
    • 제9권3호
    • /
    • pp.379-395
    • /
    • 2006
  • 본 연구의 목적은 도시성장과 함께 통행거리와 교통량이 크게 늘어나 심각한 교통체증현상을 보이고 있는 서울을 대상으로 교통흐름의 공간적 특징을 파악하고, 이를 수도권 지역의 토지이용 및 시설 분포와 연결시켜 수도권 지역의 기능적 연계의 공간구조를 밝히는 것이다. 이를 위해 본 연구에서는 교통카드를 이용하여 이동하는 대중교통 이용자들이 만들어 내는 통행 거래 자료를 바탕으로 통행행태와 통행흐름의 공간적 특징을 분석하였다. 교통카드 데이터는 하루 천만 건이 넘으며, 각 통행거래자료 마다 승 하차 및 환승의 위치와 시간, 이용 교통수단 등 방대한 정보를 담고 있어 이의 효율적 분석을 위하여 데이터마이닝 기법을 도입하였다. 특히 대중교통이용자의 통행행태를 파악하고 각 지점의 통행 수요를 파악하기 위한 새로운 알고리즘 개발하여 적용하였다. 분석결과의 공간적 특성을 파악하기위하여 지리정보체계를 이용하여 시각화시키고, 그에 입각하여 공간적 특성을 분석하였다. 또한 출발 교통량, 도착교통량, 총 지지도들 간의 관계성을 파악하기 위하여 상관관계분석을 시도하였다. 통행수요에 있어 강남의 2호선 지하철역을 따라 가장 많은 통행 수요가 나타나고 있으며, 그 다음으로 강북의 구도심지역이 또 하나의 중심축을 이룬다. 그밖에도 대단위 고층 아파트가 밀집되어 있는 주거지역들이 부수적인 중심축을 형성한다. 기 종점 수요와 함께 통과 수송량 까지 나타내는 총지지도는 강남의 구로-신도림 역이 가장 놓게 나타나며 강남지역에 위치한 지하철 2호선 역들과 환승역들에서 높게 나타나고 있다. 이러한 통행패턴 분석은 일차적으로는 교통망 상의 교통흐름과 각 지점의 통행수요를 나타나며 지역 내에서 지점 간의 기능적 연계를 반영하고 있기 때문에 도시의 교통계획은 물론 지역의 토지이용 및 시설 입지 계획 수립에 필수적이다.

  • PDF

모노레일형식 경전철 차량 표준규격 연구(기본 구성 및 성능) (Standard Specification Research for Monorail Type LRT)

  • 홍재성;류상환;이호용;황현철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.436-440
    • /
    • 2008
  • 모노레일 형식의 차량은 단일 궤도를 이용하여 주행하는 형식으로서 보통 2량${\sim}$4량을 한편성으로 하여 운행하고 있는 경전철 차량이다. 모노레일은 궤도 위를 주행하는 과좌식과 궤도에 매달려서 주행하는 현수식 2종류가 있다. 세계에서 가장 오래된 독일 뷔퍼탈 모노레일을 시작으로 호주, 미국, 일본 등에서 많은 모노레일이 현재 운행되고 있다. 우리나라에서도 대구시 3호선이 모노레일 형식의 차량을 도입하기로 결정하였다. 대구시 3호선은 국가제정사업으로서 중앙정부 예산이 총 사업비의 60% 지원이 된다. 국가에서는 고무차륜형식 경전철 차량 및 철제차륜형식 경전철 차량에 대해서는 표준규격을 고시하여 이 차량 형식을 도입하려고 하는 지자체에서는 많은 참고를 하고 있으며 그에 따른 유지보수 효과등 많은 혜택을 받고 있다. 그러나 모노레일 형식의 차량에 대한 표준규격은 아직까지 국가에서 고시하지 않아 이에 대한 연구의 필요성이 제기되었다. 한국철도기술연구원에서는 이러한 목적으로 국토해양부의 의뢰를 받아 한국의 실정에 맞는 모노레일 형식의 표준규격에 대한 연구를 진행하고 있으며 본 논문에서는 차량의 기본 구성 및 성능에 대한 연구내용을 담고 있다. 본 표준규격에 대한 내용이 국가의 표준으로 고시되어 모노레일을 계획하고 있는 지방자치단체에서 많이 활용을 하기를 희망한다.

  • PDF

퇴적암 지역에서의 교각 기초 하중을 받는 기존터널의 안정성에 대한 해석적 고찰 (Stability Analysis of Existing Tunnel in Stratified Sedimentary Rocks Subjected to Bridge Pier Load)

  • 김교원
    • 지질공학
    • /
    • 제8권2호
    • /
    • pp.153-161
    • /
    • 1998
  • 경상계 퇴적암은 층리가 잘 발달하고 있어 강도 및 변위 특성은 이방성을 띄기 때문에 터널 등 지반 특성과 밀접하게 관계되는 건설공사 시에 지반의 이방성 특성을 고려한 설계가 필요하다. 경상계 퇴적암을 기반암으로 하여 건설 중인 대구 지하철 2호선은 운영 중에 지하철 노선 상부에 건설되는 것으로 계획된 동서고가도로의 하중을 추가로 받게 된다. 교각 기초에 작용하는 76.2 MN의 고가도로 하중이 하부의 지하철 터널에 미치는 영향을 수치해석으로 검토하였다. 검토결과 지하철 터널 주변 지반은 추가 하중으로 인하여 5∼6 MPa의 응력을 받게되며 콘크리트 라이닝은 8∼10mm의 추가 변위를 받게되어 라이닝의 손상 가능성이 큰 것으로 나타났다. 따라서, 지하철 운영시의 안전을 위하여 고가도로 교각 기초 부근의 터널은 지하철 공사 시에 적절히 보강되어야 할 것으로 판단된다.

  • PDF