• Title/Summary/Keyword: 1 step protection

Search Result 136, Processing Time 0.022 seconds

A Study on the Transient Phenomenon Protection System Development for Fire Alarm System Control Unit (화재 수신기용 과도현상 보호시스템 개발에 관한 연구)

  • Lee, Dong-Myung
    • Fire Science and Engineering
    • /
    • v.23 no.2
    • /
    • pp.55-61
    • /
    • 2009
  • This study has been carried on the transient phenomenon protection system to become fire alarm system control unit of high reliance which can be protected from transient phenomena for surge or transient overvoltage, and constructed engineering base that can develop transient phenomenon protection system by proving performance of protection system in a experimental. This study developed 1 step and 2 step protection system that can be protected from transient phenomenon with process thesis and theory for development of transient phenomenon protection system. It established engineering data construction and a source technology that can develop transient phenomenon protection system as gets satisfied result and test with all performance condition that present in fire protection law and connection regulation.

Design of Daily Training Protocol for Field Crews Wearing Chemical Protective Clothing for Firefighting and Analysis of Activity (소방용 화학보호복 착용 현장대원의 일상 훈련용 프로토콜 설계 및 활동성 분석)

  • Kim, Si-Kuk;Lim, Woo-Sub;Hong, SungChul
    • Fire Science and Engineering
    • /
    • v.32 no.4
    • /
    • pp.110-121
    • /
    • 2018
  • The present article is concerned with a study on the daily training protocol for field crews wearing chemical protection clothing for firefighting and the analysis of activity. To improve coping ability of & secure safety for firefighting crews initially incorporated in the fields of chemical accident & chemical terror, 10 steps in total of daily training protocol have been designed. The designed protocol is largely composed of the extensive activity protocol for daily adaptation of firefighting chemical protection clothing (steps 1, 2, 6, 7 & 9), the precision operation protocol utilizing hands (steps 3, 4 & 5), and the protocol requiring strong physical burdens (steps 8 & 10). According to the measurement results for activity as a result of the protocol, the average maximum heart rate upon wearing the firefighting chemical protection clothing was shown to increase by step 1 20.32%, step 2 18.69%, step 3 25.23%, step 4 34.77%, step 5 27.44%, step 6 30.24%, step 7 25.33%, step 8 22.25%, step 9 22.80% and step 10 20.85% compared with the time of not wearing them. The average maximum breathing rate was shown to increase by step 3 1.92%, step 4 4.11%, step 5 1.24%, step 6 3.95%, step 7 0.93%, step 8 10.23%, step 9 3.36% and step 10 15.10%, except for steps 1 & 2.

Improved Coordination Method for Back-up Protection Schemes Based on IEC 61850 (IEC 61850 기반 후비보호계전시스템 보호협조 개선방안)

  • Kim, Hyung-Kyu;Kang, Sang-Hee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.1
    • /
    • pp.43-49
    • /
    • 2011
  • A distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, Zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome this problem clearly, this paper describes an improved backup protection coordination scheme using an IEC 61850-based distance relay for transformer backup protection. IEC 61850-based IED(Intelligent Electronic Device) and the network system based on the kernel 2.6 LINUX are realized to verify the proposed method. And laboratory tests to estimate the communication time show that the proposed coordination method is reliable enough for the improved backup protection scheme.

Evaluation of Pressure Effects on Blast Valves for Facility Protection of Underground Computing Center (지하 전산센터의 시설보호를 위한 방폭밸브에 미치는 폭압 평가)

  • Pang, Seung-Ki;Shin, Jin-Won;Kim, Wae-deuk
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.14 no.3
    • /
    • pp.21-28
    • /
    • 2018
  • This paper presents two-step simulations to calculate the influence of blast-induced pressures on explosion-protection valves installed at the boundary between a protection facility and a tunnel entering the facility. The first step is to calculate the respective overpressure on the entrance and exit of the tunnel when an explosion occurs near the tunnel entrance and exit to approach the protection facility. Secondly, the blast pressures on the explosion-protection valves mounted to walls located near the tunnel inside approaching the protection facility are analyzed with a 0.1 ms time variation using the results obtained from the first-step calculations. The following conclusions could be derived as a results: (1) The analysis of the entrance tunnel scenario, P1, leads to the maximum overpressure of 47 kPa, approximately a half of the ambient pressure, at the inner entrance due to the effect of blast barrier. For the scenario, P2, the case not blocked by the barrier, the maximum overpressure is 628 kPa, which is relatively high, namely, 5.2 times the ambient pressure. (2) It is observed that the pressure for the entrance tunnel is effectively mitigated because the initial blast pressures are partially offset from each other according to the geometry of the entrance and a portion of the pressures is discharged to the outside.

Analysis of Step-Down Converter with Low Ripple for Smart IoT Devices (스마트 사물인터넷 기기용 저리플 방식의 스텝다운 컨버터 분석)

  • Kim, Da-Sol;Al-Shidaifat, AlaaDdin;Gu, Jin-Seon;Kumar, Sandeep;Song, Han-Jung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.5
    • /
    • pp.641-644
    • /
    • 2021
  • Wearable devices and IoT are being utilized in various fields, where all systems are developing in the direction of multi-functionality, low power consumption, and high speed. In this paper, we propose a DC -DC Step-down C onverter for IoT smart devices. The proposed DC -DC Step-down converter is composed of a control block of the power supply stage. It also consists of an overheat protection circuit, under-voltage protection circuit, an overvoltage protection circuit, a soft start circuit, a reference voltage circuit, a lamp generator, an error amplifier, and a hysteresis comparator. The proposed DC-DC converter was designed and fabricated using a Magnachip / Hynix 180nm CMOS process, 1-poly 6-metal, the measured results showed a good match with the simulation results.

Microscope Examination of Attached Biofilm under Anaerobic Conditions (혐기성 조건에서 담체에 부착된 미생물의 관찰)

  • 박성열;김도한;나영수;박영식;송승구
    • Journal of Environmental Health Sciences
    • /
    • v.27 no.1
    • /
    • pp.100-105
    • /
    • 2001
  • Microstructural examinations were performed on the anaerobic biofilm from reactor filled with PE support media. Optical microscope, SEM and fluorescent microscope were used for qualitative and morphological studies on the attached microorganism under anaerobic condition. Microorganisms were attached in crevices where protection from shear forces of surfaces where easy to contact with support media surface. A hypothesis for biofilm accumulation occurs on a surface such as polymer support media is presented schematically : 1st step ; cell-support media attachment, 2nd step ; cell-support media attachment and cell-cell attachment, 3rd step ; attached biofilm from neighboring crevices joins together and growing, 4th step ; mature and irregualar biofilm was formed. In SEM photographs, shape and structures of biofilm were observed, but microorganism species and methanogens were not identified. A large number of methanogenic bacteria were identified on the surface of PE substratum by fluorescence under 480nm of radiation and it was estimated that methanogenic bacteria was related to initial attachment of bacteria under anaerobic condition.

  • PDF

A Study on the Evaluation Consulting Methodology of Important Information Communication Base Facility (주요 정보통신기반시설의 평가컨설팅 방법론에 대한 연구)

  • Lee, Young-Ro;Cho, Jae-Wan
    • Journal of Digital Convergence
    • /
    • v.5 no.1
    • /
    • pp.55-68
    • /
    • 2007
  • It soaks but 2001 July information communication base step law enforcement and the Enforcement Ordinance are published to follow, in order to support the establishment of evaluation and protective measure in order the vulnerability analysis against the facility of the agency which manages an important information communication base hour opinion to designate information protection specialty enterprise. As information protection specialty enterprise being revealed evacuation laboratory back 12 enterprises from information communication department become designation as the consulting enterprise and they do an enterprise activity actively. It follows in diffusion of the IT and information reconciliation level the other side where our country belongs in the world-wide first group, the research against the disfunction plan of preparation comparison the fact that law it is come negligently all actuality. The network as it will give management coat fatal effect even at obstacle occurrence hour of instant for of case and IT facility of the cyber transactions which leads, in the future there to be to corporate management, there is a possibility the stable civil official of information Facilities for communications very seeing in the portion which is important. Present condition and important propulsion contents of information communication base step law enforcement after, against a vulnerability analysis of information protection relation field and evaluation consulting methodological application situation to sleep it researches from the dissertation which it sees consequently and it does.

  • PDF

Total Synthesis of Azasugar 1,4-Dideoxy-1,4-imino-D-galacitol

  • Sadhu, Partha Sarathi;Santhoshi, Amlipur;Rao, Vaidya Jayathirtha
    • Bulletin of the Korean Chemical Society
    • /
    • v.33 no.11
    • /
    • pp.3554-3558
    • /
    • 2012
  • A new highly stereoselective synthesis of pyrrolidine azasugar 1,4-dideoxy-1,4-imino-D-galacitol is being reported herein. The synthesis was achieved in a linear sequence and inexpensive chiral source (+)-diethyl tartarate was used as the starting material. The key step involved during the synthesis was Pd catalysed amino cyclization of alkenylamine, Bose modified Mitsunobu reaction and Sharpless asymmetric dihydroxylation.

The Design of low voltage step-down DC-DC Converter with ESD protection device of low voltage triggering characteristics (저 전압 트리거형 ESD 보호회로를 탑재한 저 전압 Step-down DC-DC Converter 설계)

  • Yuk, Seung-Bum;Lee, KJae-Hyun;Koo, Yong-Seo
    • Journal of IKEEE
    • /
    • v.10 no.2 s.19
    • /
    • pp.149-155
    • /
    • 2006
  • In this study, the design of low voltage DC-DC converter with low triggering ESD (Electro-Static Discharge) protection circuit was investigated. The purpose of this paper is design optimization for low voltage(2.5V to 5.5V input range) DC-DC converter using CMOS switch. In CMOS switch environment, a dominant loss component is not switching loss but conduction loss at 1.2MHz switching frequency. In this study a constant frequency PWM converter with synchronous rectifier is used. And zener Triggered SCR device to protect the ESD phenomenon was designed. This structure reduces the trigger voltage by making the zener junction between the lateral PNP and base of lateral NPN in SCR structure. The triggering voltage was simulated to 8V.

  • PDF