• Title/Summary/Keyword: 히트펌프 시스템 설계

Search Result 42, Processing Time 0.029 seconds

Sensitivity Analysis on Design Factor of Ground Heat Exchanger for Optimum Design of Vertical Ground Source Heat Pump System (수직밀폐형 지중열교환기의 최적설계를 위한 설계인자 영향도 분석)

  • Bae, Sangmu;Kim, Hongkyo;Nam, Yujin
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.87-93
    • /
    • 2018
  • Ground source heat pump(GSHP) system is one of the high efficiency heat source systems which utilizes the constant geothermal energy of a underground water or soil. However, the design of conventional GSHP system in the domestic market is dependent on the experience of the designer and the installer, and it causes increase of initial installation cost or degradation of system performance. Therefore, it is necessary to develop a guideline and the optimal design method to maintain stable performance of the system and reduce installation cost. In this study, in order to optimize the GSHP system, design factors according to ground heat exchanger(GHX) type have been examine by simulation tool. Furthermore, the design factors and the correlation of a single U-tube and a double U-tube were analyzed quantitatively through sensitivity analysis. Results indicated that, the length of the ground heat exchanger was greatly influenced by grout thermal conductivity for single U-tube and pipe spacing for double U-tube.

A Study on Building Integrated Design and Commissioning of GHP System (지열히트펌프 시스템의 건물통합설계 및 커미셔닝에 관한 연구)

  • Kim, Ji-Young;Jang, Jea-Chul;Kang, Eun-Chul;Chang, Ki-Chang;Lee, Euy-Joon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.169.1-169.1
    • /
    • 2010
  • Geothermal heat pump(GHP)system has been extensively disseminated due to the recent increasing demand over new and renewable energy. However, the economics and system reliability has been key issues and barriers to insure a better system performance as designed originally. The building integrated designs of geothermal heat pump system are test and optimize GHP system by evaluating its performance in virtual reality. System design is an iterative process that will help optimize the cost efficiency of the system. One of the primary goals is to minimize the energy imbalance between the amount of energy extracted from the ground and the energy reject to it. This will reduce the land area required to install the GHX, reduce the cost of installing it and ensure the long-term efficiency of the system. Commissioning is the process of ensuring that are designed, installed, functionally tested, and capable of being operated and maintained to performance in conformity with design intent. In this paper, Study on introduction of Initial commissioning method of Geothermal Heat Pump(GHP) system using ISO performance data has been introduced. Also KIER GHP Simulator is used to simulate actual heat pimp operating condition and test commissioning method. Result should that the experiment data base could verify the applicability of the commissioning method, and also were able to suggest a better ways to GHP commissioning.

  • PDF

Impact of Design Parameters on Length and Application Effect of Surface Water Heat Exchanger(SWHE) (지표수 열교환기의 용량과 적용 효과에 대한 설계 인자의 영향)

  • Sohn, Byonghu;Min, Kyong-Chon
    • Transactions of the KSME C: Technology and Education
    • /
    • v.4 no.1
    • /
    • pp.49-56
    • /
    • 2016
  • Commercial buildings are generally cooling-dominated and therefore reject more heat to a vertical ground heat exchanger(GHE) than they extract over the annual cycle. Shallow ponds can provide a cost-effective means to balance the thermal loads to the ground and to reduce the length of GHE. The objective of this work has been to develop a design tool for surface water heat exchanger(SWHE) submerged in shallow pond. This paper presents the analysis results of the impact of design parameters on the length of SWHE and its application effect on geothermal heat pump(GHP) system using vertical GHE. In order to analysis, We applied ${\epsilon}-NTU$ method on designing the length of SWHE. Analysis results show that the required pipe length of SWHE was decreased with the increase of approach temperature difference and with the decrease of pipe wall thickness. In addition, when the SWHE was applied to the GHP system, the temperature of vertical GHE was more stable than that of standalone GHE system.

Design and Energy Performance Evaluation of Plus Energy House (플러스에너지하우스 설계 및 에너지 성능 평가)

  • Kim, Min-Hwi;Lim, Hee-Won;Shin, U-Cheul;Kim, Hyo-Jung;Kim, Hyun-Ki;Kim, Jong-Kyu
    • Journal of the Korean Solar Energy Society
    • /
    • v.38 no.2
    • /
    • pp.55-66
    • /
    • 2018
  • South Korea aims to shift the 20 percent of electricity supplement from the fossil fuel including the nuclear to renewable energy systems by 2030. In order to realize this agenda in the buildings, the plus energy house is necessary to increase the renewable energy supplement beyond the zero energy house. This paper suggested KePSH (KIER Energy-Plus Solar House) and energy performance of house and renewable energy systems was investigated. The KePSH has the target of generating 40% surplus energy than the conventional house energy consumption. The plus energy house is the house that generates surplus energy from the renewable energy sources than that consumes. In order to minimize the cooling and heating load of the house, the shape design and passive parameters design were conducted. Based on the experimental data of the plug load in the typical house, the total energy consumption of the house was estimated. This paper also suggested renewable energy sources integrated HVAC system using air-source heat pump system. Two cases of renewable energy system integration methods were suggested, and energy performance of the cases was investigated using TRNSYS 17 program. The results showed that the BIPV (building integrated photovoltaic) system (i.e., CASE 1) and BIPV and BIST system (i.e., CASE 2) shows 42% and 29% of plus energy rate, respectivey. Also, CASE 1 can generate 59% more surplus energy compared with the CASE 2 under the same installation area.

Design method of heat storage type ground source heat pump system considering energy load pattern of greenhouse (원예시설의 에너지 부하패턴을 고려한 축열식 지열시스템 설계법에 관한 연구)

  • Yu, Min-Gyung;Nam, Yujin;Lee, Kwang Ho
    • KIEAE Journal
    • /
    • v.15 no.3
    • /
    • pp.57-63
    • /
    • 2015
  • Purpose: Ground source heat pump system has been attracted in the horticulture industry for the reduction of energy costs and the increasing of farm income. Even though it has higher initial costs, if it uses in combination with heat storage, it is able to reduce the initial costs and operate efficiently. In order to have significant effect of heat storage type ground source heat pump system, it is required to design the capacity considering various conditions such as energy load pattern and operating schedule. Method: In this study, we have designed heat storage type ground source heat pump system in 5 cases by the operating schedule, and examined the system to find the most economic and having superb performance regarding the system COP(Coefficient of Performance) and energy consumption, using dynamic energy simulation, TRNSYS 17. Result: Conventional ground source heat pump system has lower energy consumption than heat storage type, but following the result of LCC(Life Cycle Cost) analysis, the heat storage type was more economic due to the initial costs. In addition, it has the most efficient performance and energy costs in the case of the smallest heat storage time.

Prediction of Ground Thermal Properties from Thermal Response Test (현장 열응답 시험을 통한 지중 열물성 추정)

  • Yoon, Seok;Lee, Seung-Rae;Kim, Young-Sang;Kim, Geon-Young;Kim, Kyungsu
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.7
    • /
    • pp.5-14
    • /
    • 2016
  • The use of geothermal energy has increased for economically and environmentally friendly utilization, and a geothermal heat pump (GSHP) system for space heating and cooling is being used widely. As ground thermal properties such as ground thermal conductivity and ground thermal diffusivity are substantial parameters in the design of geothermal heat pump system, ground thermal conductivity should be obtained from in-situ thermal response test (TRT). This paper presents an experimental study of ground thermal properties of U and 2U type ground heat exchangers (GHEs) measured by TRTs. The U and 2U type GHEs were installed in a partially saturated dredged soil deposit, and TRTs were conducted for 48 hours. A method to derive the thermal diffusivity as well as thermal conductivity was proposed from a non-linear regression analysis. In addition, remolded soil samples from different layers were collected from the field, and soil specimens were reconstructed according to the field ground condition. Then equivalent ground thermal conductivity and ground thermal diffusivity were calculated from the lab test results and they were compared with the in-situ TRT results.

Evaluation of Borehole Thermal Resistance in Ground Heat Exchanger (지중 열교환기의 보어홀 열저항 산정에 관한 연구)

  • Yoon, Seok;Lee, Seung-Rae;Kang, Han-Byul;Go, Gyu-Hyun;Kim, Min-Jun;Shin, Ho-Sung
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.10
    • /
    • pp.49-56
    • /
    • 2013
  • The use of geothermal energy has been increased for economic and environmental friendly utilization. Ground thermal conductivity and borehole thermal resistance are very important parameters in the design of geothermal heat pump system. This paper presents an experimental study of heat exchange rate of U and W type ground heat exchangers (GHEs) measured by thermal performance tests (TPTs). U and W type GHEs were installed in a partially saturated dredged soil deposit, and TPTs were conducted to evaluate heat exchange rates under 100-hr continuous operation condition. The heat exchange rates were also calculated by analytical models to estimate borehole thermal resistances and were compared with experimental results. It comes out that multi-pole and equivalent diameter (EQD) models resulted in more accurate agreement than shape factor (SF) model which is currently more often used.

Evaluation of Conventional Prediction Models for Soil Thermal Conductivity to Design Horizontal Ground Heat Exchangers (수평형 지중열교환기 설계를 위한 토양 열전도도 예측 모델 평가)

  • Sohn, Byonghu;Wi, Jihae;Park, Sangwoo;Lim, Jeehee;Choi, Hangseok
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.2
    • /
    • pp.5-14
    • /
    • 2013
  • Among the various thermal properties, thermal conductivity of soils is one of the most important parameters to design a horizontal ground heat exchanger for ground-coupled heat pump systems. It is well known that the thermal conductivity of soil is strongly influenced by its density and water content because of its particulate structure. This paper evaluates some of the well-known prediction models for the thermal conductivity of particulate media such as soils along with the experimental results. The semi-theoretical models for two-component materials were found inappropriate to estimate the thermal conductivity of dry soils. It comes out that the model developed by Cote and Konrad provides the best overall prediction for unsaturated sands available in the literature. Also, a parametric analysis is conducted to investigate the effect of thermal conductivity, water content and soil type on the horizontal ground heat exchanger design. The results show that a design pipe length for the horizontal ground heat exchanger can be reduced with an increase in soil thermal conductivity. The current research concludes that the dimension of the horizontal ground heat exchanger can be reduced to a certain extent by backfilling materials with a higher thermal conductivity of solid particles.

The Outlet Temperature Prediction of In-Situ Thermal Response Test using CFD Analysis (CFD 해석을 이용한 현장 열응답 시험의 출구온도 예측)

  • Sim, Yong-Sub;Lee, Hee-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.1
    • /
    • pp.28-35
    • /
    • 2016
  • The in-situ thermal response test for the design of a ground heat exchanger of geothermal heat pumps have difficulty in predicting the outlet temperature according to the variation of conditions due to the expense and time. This paper suggests a 3-D CFD analysis method to predict the heat transfer performance of vertical type ground heat exchanger, which is mostly used in national, and the outlet temperature and the slope of two in-situ thermal response tests were compared to test the proposed CFD reliability. The results of CFD analysis showed that the outlet temperature was predicted to within $0.5^{\circ}C$ of the actual value and the slope was predicted to within 1.6%. The reliability of the CFD analysis method was confirmed using this process, and the outlet temperature prediction of the two in-situ thermal response tests was obtained by changing ${\pm}20%$ of the flow rate and the effective thermal conductivity conditions, respectively. The results of CFD analysis showed that the outlet temperature of Case 1 was 28.0 (-20%) and $29.6^{\circ}C$ (+20%) for the flow rate variation and $29.6^{\circ}C$ (-20%) and $28.0^{\circ}C$ (+20%) for the effective thermal conductivity variation, and the outlet temperature of Case 2 was 28.4 (-20%) and $29.8^{\circ}C$ (+20%) for the flow rate variation and $29.7^{\circ}C$(-20%) and $28.4^{\circ}C$(+20%) for the effective thermal conductivity variation.

Field Survey on Smart Greenhouse (스마트 온실의 현장조사 분석)

  • Lee, Jong Goo;Jeong, Young Kyun;Yun, Sung Wook;Choi, Man Kwon;Kim, Hyeon Tae;Yoon, Yong Cheol
    • Journal of Bio-Environment Control
    • /
    • v.27 no.2
    • /
    • pp.166-172
    • /
    • 2018
  • This study set out to conduct a field survey with smart greenhouse-based farms in seven types to figure out the actual state of smart greenhouses distributed across the nation before selecting a system to implement an optimal greenhouse environment and doing a research on higher productivity based on data related to crop growth, development, and environment. The findings show that the farms were close to an intelligent or advanced smart farm, given the main purposes of leading cases across the smart farm types found in the field. As for the age of farmers, those who were in their forties and sixties accounted for the biggest percentage, but those who were in their fifties or younger ran 21 farms that accounted for approximately 70.0%. The biggest number of farmers had a cultivation career of ten years or less. As for the greenhouse type, the 1-2W type accounted for 50.0%, and the multispan type accounted for 80.0% at 24 farms. As for crops they cultivated, only three farms cultivated flowers with the remaining farms growing only fruit vegetables, of which the tomato and paprika accounted for approximately 63.6%. As for control systems, approximately 77.4% (24 farms) used a domestic control system. As for the control method of a control system, three farms regulated temperature and humidity only with a control panel with the remaining farms adopting a digital control method to combine a panel with a computer. There were total nine environmental factors to measure and control including temperature. While all the surveyed farms measured temperature, the number of farms installing a ventilation or air flow fan or measuring the concentration of carbon dioxide was relatively small. As for a heating system, 46.7% of the farms used an electric boiler. In addition, hot water boilers, heat pumps, and lamp oil boilers were used. As for investment into a control system, there was a difference in the investment scale among the farms from 10 million won to 100 million won. As for difficulties with greenhouse management, the farmers complained about difficulties with using a smart phone and digital control system due to their old age and the utter absence of education and materials about smart greenhouse management. Those difficulties were followed by high fees paid to a consultant and system malfunction in the order.