• Title/Summary/Keyword: 횡단터널

Search Result 38, Processing Time 0.024 seconds

Characteristics of Subsidence above a Shallow Tunnel Excavated in Weathered Rock Mass (풍화암반 저심도 터널 굴착 중 발생한 지표침하의 특성)

  • Kim, Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.23 no.5
    • /
    • pp.337-346
    • /
    • 2013
  • The characteristics of subsidence above a shallow tunnel excavated in weathered rock mass is analyzed. The tunnel is excavated minimum about 11m beneath some buildings and the width of the tunnel is 11m, too. Subsidence pins are installed at 23 locations on surface along the tunnel, 180m long, adjacent to the buildings. Subsidences are measured for about 2 years and they are optimized to analyze three dimensional deformed ground surface, trough width parameter K and sectional volume loss of unit tunnel length Vs of the surface deformation profile.

The development of a back analysis program for subsea tunnel stability under operation: transversal tunnel section (운영 중 해저 터널의 안정성 평가를 위한 역해석 프로그램 개발: 횡단방향)

  • An, Joon-Sang;Kim, Byung-Chan;Lee, Sang-Hyun;Song, Ki-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.195-212
    • /
    • 2017
  • When back analysis is used for the assessment of an operating subsea tunnel safety in various measurement information such as stress, water pressure and tunnel lining and ground stiffness degradation, the reliable results within tolerable error rate can be obtained. By utilizing a commercial geotechnical analysis program FLAC3D, back analysis can be performed with a DEA which has already been successfully validated in previous studies. However, relative more time-consumption is the drawback of this approach. For this reason, this study introduced beam-spring model-based on FEM solver which uses less analysis time relatively. Beam-spring program capable of structural analysis of a circular tunnel section was developed by using Python language and combined with the built-DEA. From the measurement datum, expected to estimate the stability of an operation tunnel close to real-time.

Security Interpretation of the Restriction Boundary of Building for Antiquated Tunnel using 3 Dimensional Surveying (3차원 측량에 의한 노후 터널의 건축한계 확보 해석)

  • Bae Sang-Ho;Lee Hyung-Seok
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.24 no.3
    • /
    • pp.251-259
    • /
    • 2006
  • For the electrification of the existing railways, the security of the restriction boundary of building with mechanistic stability research on the antiquated tunnel must be accomplished essentially. If the tunnel don't secure its restriction boundary of building, the reconstruction based on improvement of tunnel alignment are generated and its surveying data are required. The precise surveying was conducted with the same coordinate system for three tunnels of Youngdong tramline, and the restriction boundary of building of the straight and curve section were analyzed effectively by acquiring the data of profile and cross section, profile rail-height, rail-grade, cross tunnel height, and restriction boundary of building. This study is presented for valuation data of the stability of the electrification design to construct and analyze restriction boundary of building, which compared with the drawing and its existing design using profile and cross section. After this, it is interoperable to increase the development of real-time monitoring system on the tunnel structures.

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.509-514
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok. Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented.

  • PDF