• Title/Summary/Keyword: 환승정거장

Search Result 8, Processing Time 0.02 seconds

Analysis of User Satisfaction by Types of Subway Platforms and Transit Stations (지하철 승강장 및 환승정거장 유형에 따른 이용자 만족도 분석)

  • Kim, Hwang Bae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.437-445
    • /
    • 2015
  • The layout of facilities, in relation to information and navigational displays, has great influence on subway satisfaction, and tend to vary depending on the types of subway platform and transit station. However, until now, few studies have covered such aspects as of yet. Starting from this viewpoint, the purpose of this study was to use an IPA analysis technique to analyze that satisfaction on the importance of facilities to aid in accessibility, such as elevators and escalators, transit amenities and information and navigational displays depending on the types of platform and transit station. To do so, we've classified 15 metropolitan stations according to types of platform and transit station and analyzed differences in user importance and satisfaction as well as improvements for platforms and transit stations of similar type. By the analysis results of this study, we've concluded that the proper selection and positioning of elevator and escalator facilities and information and navigational displays was important when designing the subway station according to platform type (separate platform) and or according to the transit station type (cross, L, T types) where pedestrian flow heavily intersected. We considered that such analysis results would be helpful in the design of new stations and the enhancement of existing stations pursuant to a new direction that minimizes user inconvenience, and that improvement items should be developed first according to the platform and transit station types, which would be helpful in enhancing the efficiency of the subway improvement cost.

An Investigation of Rider Behavior to Transfer Seoul Metropolitan Transit Using Public Transport Card Data (교통카드 데이터를 이용한 수도권 광역급행철도 환승행태에 관한 연구)

  • Gun ki Jung;Dong min Lee;Sun hoon Kim
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.6
    • /
    • pp.146-164
    • /
    • 2022
  • Recently, the Korean government promoted the construction of metropolitan express subway to connect major transportation hub in the metropolitan area within 30 minutes. Most stations of the metropolitan express subway are connected to existing subway stations, so the importance of transfer increased. Although many studies have been conducted on the effect of transfer penalty on route choice, there are few studies on the transfer behavior of the metropolitan express subway. Therefore, in this study, a transfer behavior analysis was conducted on the Shinbundang Line, a representative metropolitan express subway. To analyze the transfer behavior according to the degree of traffic congestion and the presence of fare payment, route choice models were made using transport card data divided according to week, time, and user characteristics. As a result of the analysis, users of the metropolitan express subway had greater disutility to the transfer waiting time compared to the transfer moving time. Furthermore, especially during the peak time, EIVM(Equivalent in-vehicle minutes) of the transfer waiting time was 3.51. In this study, EIVM for metropolitan express subway users were analyzed to be 2.6 minutes, which is significantly lower than the results of previous studies on subways. This suggests that there is a difference in the transfer penalty between subways and metropolitan express subway, and that it is necessary to apply the transfer penalty between subways and express subway differently when forecasting subway traffic demand.

The Improvement of the Area Estimation of the Metropolitan Railway Station Platforms (도시철도 및 광역철도 승강장 면적산정식의 개선방안 연구)

  • Kim, Jinho;Shin, Minjung;You, Soyoung;Kim, Taewan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.6
    • /
    • pp.991-999
    • /
    • 2018
  • In urban areas, the proportion of railway traffic in public transport is increasing. The congestion situation is repeated as the passengers concentrate on station and transfer facilities and the inconvenience of the passengers is increasing in terms of safety and convenience. Therefore, the importance of estimating the appropriate area of the station has been emphasized. The area estimation formula used in the metropolitan railway stations currently is a partial modification of the area estimation formula of Japan in the 1970s. It does not reflect changes in the social and cultural environment and patterns of passengers. The technical basis for major decision variables is insufficient. Therefore, the theoretical basis of the area estimation formula and the pedestrian environment satisfaction of the design guideline of metropolitan railway stations were analyzed in order to suggest improvement formula. The improved area estimation formula was verified by conducting field surveys on 5 stations of metropolitan railways and 15 stations of urban railways. The existing area estimation formula is LOS E grade for the main space. However, the LOS D grade is implemented when the improved area estimation formula is applied. Based on the results, the design factors for the area estimation formula are suggested.

Comparison of Egress Modeling for the Connected Space from Subway Car to Platform (지하철 차량과 승강장의 연계공간에 대한 피난모델링 적용비교)

  • Kim, Jong-Hoon;Seo, Dong-Hoon;Eo, Deuk-Gang;Kim, Woon-Hyung;Lee, Duck-Hee;Jung, Woo-Sung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.870-873
    • /
    • 2011
  • The circumstance as platform and tunnel is very important in evacuation from passenger train car on fire. The comparison of egress modeling by SIMULEX, PATHFINDER, STEPS was conducted in order to analyze for the influence of platform to egress from subway car. Model subway car is seoul metro subway car. Model platform was designed by code 'Complementary design guide for connecting and convenience facilities, and urban subway station'.

  • PDF

Railway Undercrossing Construction Method for the Shindorim Station Platform Extension (신도림 역사 확장을 위한 철도횡단 건설공법 검토)

  • Yoo, Je-Nam;Koo, Ja-Kap;Lee, Hee-Yung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.887-890
    • /
    • 2008
  • Shindorim Station is the most important transfer station which is crossed Seoul Metro Line-2 and national rail traffic Kyungbu, Honam and Kyungin Line etc.. There is the lagest transfer passengers and the greatest rail traffic. Therefore to solve the congeted station problem, Shindorim station extension project has been planned. This project has very difficult many problems. One of them is undercrossing the national rail traffic ground without open-cut excavation. There are many undercrossing construction methods in our country. But this project is required the best safety. So the best applicable methods are investigated, which are Front-Jacking, NTR and TRcM. In Design stage Front-Jacking with PRS method which is gound reinforcing is applied.

  • PDF

A Study of the Proper Sizing of a Subway Station Waiting Area (도시철도 대기공간의 적정규모 산정에 관한 연구)

  • Kim, Jonghwang;Baek, Sungjoon;Nam, Doohee
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.262-269
    • /
    • 2016
  • Subway station scales are determined by peak predictions. In this study, the purpose behind the installation of a subway is public transportation convenience and public interest, but economic validity is also important. By proving that the scale of the station is excessive with regard to the target station size for Seoul subway Line 5-8, a reasonable plan. can be sought. According to station installation standards, the area of the station under investigation here is out of the service levels by six stages (A~F), and it must be four or more levels (D). The Actual level for the B level is a two-step design. The Actual ratio for over- Peak predictions is only 17.8% on average. The results of measurements of the excess area and determination of the excessive costs were analyzed by subdividing the area and by calculating it based on the B level, finding that it is possible to provide benefits for customers only in the current design, with an area ratio of 16.3%. Given the weight, it was estimated that current conditions can meet the needs of only 18.6% of the current area. Simplifying the scale calculation method of the station, it is convenient, safe, and advantageous to move citizens only if the scale can be streamlined. Then, with a reduced initial investment, maintenance costs during the operation can be reduced.

A Study on the Construction for Transfer System between Tram and Public Traffic System - In the Place of Changwon Area - (노면전철과 대중교통수단 간의 환승체계 구축에 관한 연구 - 창원 지역을 중심으로 -)

  • Choi, Yang-Won;Park, Do-Yun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.273-286
    • /
    • 2013
  • Recently, due to problems with subway and bus operations, a need has emerged for a solution such as the introduction of an Advanced Transit System. In several municipalities, systems have been introduced using light rail as AGT urban aesthetics construction. There is high inhibition and civil cases are delayed by more environmentally friendly and accessible remedies. For the purpose of this study, Changwon city would be transformed to have an environmentally friendly transportation system such as a tram with an overview. Features, advantages, and disadvantages are analyzed, and systems are established the existing public transport routes by transfer system. Changwon city's tram plan is first step in open in year 2018, and second step with the opening goal of the year 2021, and the total line length of 33.9 km, the station will be built in the 38 locations. and also in 2011 a feasibility study, evaluated a low economic as B/C to 0.88, but it evaluated the high value of the policy analysis as AHP to 0.502. However, introduction of a tram project that should precede the as following condition. The first step in Changwon city's tram plan would be as follows : The introduction of the tram system would demand traffic management along with a restructuring of the bus system, and the tram system would be selected for domestic realities. Secondly, the introduction of trams would comprehend the advanced traffic composition in accordance with the consensus of the citizenship, and a legal system should be established for the introduction of the trams.