• Title/Summary/Keyword: 호남고속철도

Search Result 96, Processing Time 0.045 seconds

Analysis of Socio-economic Factors for Predition of Railrolad Trip Generation by Principal Component Analysis (주성분해석을 통한 철도이용객수요에 미치는 사회경제지표 분석)

  • Jung, Chan-Mook;Kim, Hyo-Jong
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.7
    • /
    • pp.437-444
    • /
    • 2012
  • This study features an analysis of the socio-economic factors of ten cities on the Honam-line that affect the number of train passengers. The 3 main factors based on the principal component analysis were the population, the distance between two regions, and the area size of each region while the number of automobiles has been conventionally used instead of the area size of each region. A formula to predict the train passengers by the regression analysis was developed and showed a good agreement to the number of real passengers. When Honam highspeed railway is opened, the traveling time between two regions as well as the area size of each regions should be more precisely considered.

A Study on the Loss and Damage Ratio of Railroad Tunnel Maintenance Monitoring Sensor (철도터널 유지관리 계측센서의 손망실율 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.262-270
    • /
    • 2018
  • Purpose: This paper investigates and analyzes the loss and damage ratio of maintenance monitoring sensor in metropolitan and high speed railroad tunnel in Korea and abroad. Method: After 5~6 years from the installation, the maintenance monitoring sensor on metropolitan transit tunnels showed the loss and damage ratio from 14.2% to 14.8% in Seoul metro line no. 5, 6, 7, 9, and 13.9% in UK channel tunnel. Based on the result, 15% is thought to be a proper set for the elapsed years, which is 5 years from the installation. Results: The maintenance monitoring sensor on high speed railroad tunnels showed the loss and damage ratio of 60.9% in Ho-Nam high speed railroad on 1 stage after 3 ~ 5 years from the installation, which was approximately 4 times as high as that of Seoul metro line no. 5, 6, 7, 9. Conclusion: Kyung-Bu high speed railroad on 2 stage, after 8~10 years from the installation, showed the loss and damage ratio of 66.8%. Based on the result, it can be inferred that the loss and damage ratio increases drastically after 5~10 years from the installation. Therefore, it is necessary to study on the loss and damage ratio of long term elapsed years, especially more than 10 years from the installation.

The Study for System Specification of Rolling Stock of Honam High Speed Railroad (호남고속철도 차량 시스템 사양에 관한 연구)

  • 주인환;박광복
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.104-112
    • /
    • 2002
  • The Honam conventional railroad was already exceseed the limit capacity of transportal ion at some sect ion. Therefore Honam railroad axis needs new high speed railroad line for increasing of transportal ion capacity now. This report was studied about the system technical specification of rolling stock based on new technology or high speed train or advenced countries, KHST and KTX for Honam high speed railroad.

  • PDF

A Suggestion of Blasting Patterns of a Mine closed to Railway Line for Securing Safety of High Speed Train (고속철도 안전확보를 위한 노선 인접 광산의 발파패턴 제안)

  • Kim, Hyun-Ki;Lee, Sung-Hyeok;Lee, Jin-Wook;Choi, Chan-Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.5
    • /
    • pp.1-9
    • /
    • 2015
  • Recently Honam high-speed railroad line is constructed in southern part of Korea. This line is for next generation HST named HEMU-430X. But there is a limestone mine near this line and this mine will make a process to dig a passageway under the railway line. In this case, safety of railroad system and stability of mine are crucial problems on both sides. By measuring mine blasting vibration and calculating regression equation, effect of mine blasting to train running is investigated quantitatively. 0.5 kine (cm/sec) is applied as a management specification of vibration based on field measurement. In this study, changes of blasting patterns are suggested to control vibration of mine blasting. And the effect of train vibration to mine is also invesitigated by numerical analysis.

Experimental Study to Measure the Characteristics of KTX Train Wind Pressure by using Field Test (KTX 열차풍압 특성을 측정하기 위한 선로변 현장 실험 연구)

  • Nam, Seong-Won;Kwon, Hyeok-Bin;Nam, Yoon-Su
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.6
    • /
    • pp.575-580
    • /
    • 2008
  • When constructing a high-speed railroad, the reduction of the distance between track centers and the width of track bed will save the construction cost. However the shortening the distance between track centers may cause the stability problems due to higher wind pressure. Therefore the extensive technical review and aerodynamical study should be performed to determine the adequate distance between track centers. In this study, the impact that the increase in wind pressure due to the change of aerodynamic phenomena with the change of the distance between track centers may have on two trains passing by each other was predicted, and the stability of train operation was analyzed in order to review the distance between track centers suitable to Honam HSR trains. And we estimated the aerodynamical effects by the results of the field test.

Analysis of Return Current Effect for Track Circuit on Ho-Nam high Speed Line (고속열차 운행에 따른 호남고속철도 궤도회로 귀선전류 영향 분석)

  • Baek, Jong-hyen
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.42 no.5
    • /
    • pp.1110-1116
    • /
    • 2017
  • Depending on the operating characteristics, track circuit is installed for the purpose of direct or indirect control of the signal device, point switch machine and other security device. These are mainly used for train detection, transmission of information, broken rail detection and transmission of return current. Especially, the return current is related to signal system, power system and catenary line, and track circuit systems. It is one of the most important component shall be dealt for the safety of track side staff and for the protection of railway-related electrical system according to electrification. Therefore, an accurate analysis of the return current is needed to prevent the return current unbalance and the system induced disorder and failure due to an over current condition. Also, if the malfunction occurred by the return current harmonics, it can cause problems including train operation interruption. In this paper, we presented measurement and analysis method at return current and it's harmonics by high speed train operation on the honam high speed line.

Considering combined operation method with the wide area rapid-transit and high speed-transit for wide area traffic service offer at high speed track section (고속선구에 광역교통서비스 제공을 위한 고속철도와 급행전철 혼용운용 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Cha, Ki-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1900-1906
    • /
    • 2008
  • According as zone of life of big city is expanded by new city development etc.., need special skill master plan compensation which can be systematic for wide area traffic problem solution and confusion expense minimization in the metropolitan area because wide area of capital region traffic is gone continuously and continues. Accordingly, Kyonggi Province suggested rapid-transit railway achievement that can connect Seoul Gangnam in 20 minutes with Dongtan new city recently. MLTM(Ministry of Land Transport and Maritime Affaris) announced "Capital region railway network improvement plan research services (2007.12)" result that Gangnam High-speed railway route (Suse $\sim$ Dongtan $\sim$ Pyeongtaek) construction for offer High-speed railway service to capital region and Kyonggi southern part area inhabitantses and need to line capacity tribe solution by Seoul-Busan high-speed railway second-stage and Honam high speed railroad completion. Is judged that need examination about wide area rapid-transit railway combined application operation that take advantage of rail track reserve capacity of High-speed railway for utilization efficiency elevation of country and efficient investment of national finance according as High-speed railway and Gangnam rapid-transit railway route that is suggested in Kyonggi Province are overlaped. Therefore, in this research, I wish to quote investment efficiency plan of railroad business by that different kind's train is run in uniformity track by presenting combined application operation plan and working expenses curtailment effect etc. that is optimized through analysis of roadbed and E & M technology condition, intermediate station plan, train operation planning etc. in case of wide area rapid-transit railway and high-speed railway run combined application.

  • PDF

Priority Decision Making for Planning A Long-term Sustainable High-speed Rail Network using Multi-Attribute Utility Theory (지속가능한 고속철도망 계획을 위한 투자우선순위 선정에 관한 연구 : 다원-속성 효용이론을 이용하여)

  • Park, Jin-Kyung;Eom, Jin-Ki;Lee, Jun
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.1
    • /
    • pp.45-53
    • /
    • 2008
  • With the growing international consensus regarding sustainable development of transportation, the plan of transportation infrastructure needs to meet various requirements toward enhancing environmental conditions. Accordingly, the upcoming long-term plan of high-speed rail network has to be reflecting the sustainability of transportation systems. In this paper, we demonstrate an application of methodologies based on multi-attribute utility theory for determining priorities of sustainable high-speed rail investment. The proposed methodologies identify indicators for sustainable transportation systems such as economic, environmental, and social ones and then, evaluate priority for planning a long-term sustainable high-speed rail network by comparing the relative importance among indicators. This will help transportation agencies to prioritize high-speed rail investment toward sustainable transportation systems.

Parametric Study of the Effects of Train Wind on Turnover Safety (차량 전복 안전성에 끼치는 열차 풍압의 파라메타 연구)

  • Nam, Seong-Won
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.961-966
    • /
    • 2009
  • When constructing a high-speed railroad, the reduction of the distance between track centers and the width of track bed will save the construction cost. However the shortening the distance between track centers may cause the stability problems due to higher wind pressure. Therefore the extensive technical review and aerodynamical study should be performed to determine the adequate distance between track centers. In this study, the impact that the increase in wind pressure due to the change of aerodynamic phenomena with the change of the distance between track centers may have on two trains passing by each other was predicted, and the stability of train operation was analyzed in order to review the distance between track centers suitable to Honam HSR trains. We conducted the parametric study of the effects of train wind on the running stability.

철도기준점을 이용한 철도중심선형 좌표변환에 관한연구 - 호남고속철도 계획노선을 중심으로 -

  • Moon, Cheung-Kyun;Heo, Joon;Kang, Sang-Du;Kim, Sang-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1141-1151
    • /
    • 2007
  • In this paper through Honam high-speed railroad which is planned with the north and south axis, we will verify the feasibility of the coordinate conversion using railroad control points after regarding current planned-railroad as the linear central axises. From analysis, distortion of Y axis varies 21cm to 40cm diminishing to a gentle straight line, distortion of X axis varies 14cm to 29cm. Through a revision, the deviation value between the coordinates were 6mm to 9mm and it satisfied the allowable error of national geographic information institute which is following ITRF (International Terrestrial Reference Frame) and cadastral boundary survey(10cm). consequently the coordinate conversion is possible using railroad control points as common control points.

  • PDF