• Title/Summary/Keyword: 호남고속철도

Search Result 96, Processing Time 0.032 seconds

LTE-R(철도무선통신망) 실용화 및 국가철도통신망 구축 계획

  • Yun, Hak-Seon;Park, Jong-Won;Yun, Yu-Sin;Seong, Dong-Il
    • Information and Communications Magazine
    • /
    • v.33 no.3
    • /
    • pp.66-73
    • /
    • 2016
  • 본고에서는 미래창조과학부 공공통합망 주파수 (700MHz대역)를 사용하는 철도통합 무선통신망 (LTE-R)의 호남고속철도 익산~정읍간 시험선 구축을 통한 실용화 계획과 함께 국가 철도망 적용을 위한 노선별, 지역별 중장기 구축 계획과 최초로 사업화를 준비중인 원주-강릉 복선전철 시범사업에 대한 내용을 소개한다.

A New Approach of Modal Split Model Based on The Trip length (Gyeongbu High-Speed Railway) (통행거리에 따른 합리적인 통행수단선택 모형 구축방안 연구 (경부고속철도 대상))

  • Cho, Hang-Ung;Lee, Seung-Yeung;Kim, Kang-Seob
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.773-790
    • /
    • 2009
  • The Korea high speed train was launched from Seoul to Busan of 1st construction phase at 1st April, 2004. This huge project will be lead to a great change in korean society such as existing mode choice behavior change and the concentrating on KTX station zone lifestyle pattern's change. With the result to opening high speed train railway was diminished train journey time between Seoul to Busan from 4 hours 10 minute to 2 hours 40 minutes, and has been change population movement, favorite location of corporation headquarters, existing metropolitan transportation pattern and so on. In the middle of this study, I choose to analyse Seoul-Cheonan/Asan stations, Seoul-Deajeon stations, Seoul-Deagu stations, Seoul-Pusan stations. This study have a information to analyse among as like movement of population, status of employee structure, usage of land, movement inland transportation mode. I sure that this study will lead to helpful prediction both 2nd phase of Kyoung-bu high-speed railway and Ho-nam high-speed railway in advance.

  • PDF

Performance Assessment of High-Speed Transponder System for Rail Transport on High-Speed Line (철도교통용 고속 트랜스폰더시스템 고속선 실차 성능평가)

  • Park, Sungsoo;Lee, Jae-Ho;Kim, Seong Jin
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.3
    • /
    • pp.304-313
    • /
    • 2016
  • It is necessary to receive telegrams transmitted by transponder tags installed along the track in order to detect the exact position of a high-speed train. In a high-speed railway environment, telegrams can be corrupted by the electromagnetic interference that comes from onboard electric train power equipment or wayside devices. In this study, we verified the railway environment compatibility of a high-speed transponder system developed as a train position detection system. We installed transponder tags on the Honam high-speed line and measured the number of error-free telegrams received from the transponder tag while the HEMU-430X was running at 268km/h~334km/h. Based on the measurement, we estimated the length of the contact zone formed between the transponder reader and tag. Field test results allow us to estimate how many error-free telegrams can be received when HEMU-430X is at speeds up to 400km/h.

Calibration and Application of Direct Demand Models for Kyungbu${\cdot}$Honam Line After KTX Commissioning (고속철도 수송실적 자료를 활용한 경부${\cdot}$호남선의 철도직접수요모형의 작성과 적용)

  • Song, Sun-Ah;Yoo, Hyun-Sun;Suh, Sun-Duck
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.386-391
    • /
    • 2004
  • 일반적으로 철도수요를 추정할 때에는 매표실적에 근거한 직접수요모형(Direct Demand Model)을 많이 사용하여왔다. 고속철도가 2004년 4월 개통됨으로써 실행된 수요가 나옴에 따라 이를 이용하여 KTX와 일반철도를 고려한 직접수요모형의 작성이 가능하게 되었다. 따라서 본 논문에서는 고속철도 운행 전${\cdot}$후의 실제수요를 이용하여 고속철도 개통 전${\cdot}$후의 직접수요모형을 추정하여보았다. 모형에 사용되는 변수로는 철도서비스, 사회경제지표 등을 사용하였다. 그 중 철도서비스, 즉 운행시간, 운행빈도, 운임 등을 집중적으로 사용하여 모형을 작성하였다. 이렇게 작성된 모형은 KTX와 일반철도, 일반철도 등급간에서 철도서비스 변수의 기여를 명시적으로 제시해준다. 개발된 모형을 이용하여 KTX 및 일반철도의 운행방향에 대하여 검토하였다.

  • PDF

A study on the characteristics of Micro Pressure wave for the optimum cross-section design in Honam high speed railway (호남고속철도 터널 단면선정을 위한 미기압파 특성 분석에 관한 연구)

  • Kim, Seon-Hong;Mun, Yeon-O;Seok, Jin-Ho;Kim, Gi-Rim;Kim, Chan-Dong;Yu, Ho-Sik
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2008.03a
    • /
    • pp.51-68
    • /
    • 2008
  • When the train enters into a tunnel a high speed, pressure waves are generated inside the tunnel. The pressure waves at propagate in a form of compression wave toward the tunnel exit and a fraction of the compression waves that arrives at the exit of the tunnel are discharged to outside of the tunnel and the remainder is reflected into the tunnel as expansion waves. The compression waves emitted from the tunnel does not radiate in a specific direction but in all directions. If the amplitude of the compression wave is great, it causes noise and vibration, and it is called "Micro-Pressure Wave." "Micro-Pressure Wave" must be considered as a decision for the optimum tunnel cross-section as the amplitude of the compression wave depends on train speed, tunnel length, area of tunnel and train. Therefore, this paper introduces the case study of Micro-Pressure Wave characteristics for determination of tunnel cross section in Honam high speed railway, the pressure inside the tunnel and the micro-pressure waves at tunnel exit were measured at Hwashin 5 tunnel in Kyungbu HSR line. At the same time. a test of train operation model was performed and then the measurement results and test results were compared to verify that the various parameters used as input conditions for the numerical simulations, which were appropriate. Also a model test was performed, in order to analysis of the Micro-Pressure Wave Mitigation Performance by Type of Hood at Entrance Portal.

  • PDF

Method for increasing rail operation capacity of capital high speed rail with expanding the high speed railway service (고속철도 서비스 확대를 위한 수도권 고속철도 확충 방안 고찰)

  • Roh, Beung-Guk;Kim, Young-Bea;Shin, Dong-Won
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1254-1268
    • /
    • 2009
  • In 1998, because of the economic crisis called IMF Crisis in Korea, Kyungbu high speed railway project could run by modifying the original plan to open it as a 1st phase only by utilizing the existing railway lines from Seoul to Siheung and the other one from Daegu to Pusan. The modified plan includes that the line from Daegu to Pusan will be constructed as a second phase in next time. Starting railway operation with the changed plan, the combined application operation of high speed rail, passenger rail and freight rail was caused partly from Seoul to Siheung to run into capital area. As a result, the opinion for additional railway line construction is insisted continuously because the operation volume of passenger rail was forced to be reduced, the service quality of it was decreased and it became difficult to add new high speed services. Moreover, with regard to Honam high speed rail, the new construction plan of station in Kangnam metro area as a basement station for starting from Suseo was changed to the plan of turning out at Osong because of the economic effectiveness and this kept resident people in Kangnam metro area and southern Kyungki area unable to get the opportunity of high speed rail service benefit. After beginning of Kyungbu high speed railway operation, national transportation system developments are focused on high speed rail, and when the second phase construction of Kyungbu high speed rail, beginning operation of Kyungjeon line, Jeolla line double track construction, Honam high speed rail in 2014, is completed, the demand for high speed rail will be increased and it is unavoidable to make Kwangmyung station as a basement station and to reduce the number of passenger rail operation. At this moment, it is valuable to consider adding the railway line capacity in capital area to improve the transferring service for citizen who live in area without Kyungbu high speed rail station and to expand the service area from Kangbuk to Kangnam and southern Kyungki area. Accordingly, in this paper, the effective rail operation method, facility plan and the other issue to be reviewed for increasing capital high speed railway lines will be mentioned.

  • PDF

Geoid Height Estimation Using Rail-road Reference Points (철도기준점을 활용한 지오이드고의 추정)

  • Heo, Joon;Song, Yeong-Sun;Kim, Sung-hoon;Moon, Cheung-Kyun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.4
    • /
    • pp.499-505
    • /
    • 2009
  • This paper evaluated applicability of railroad reference points for determinating geoid heights. For this research, reference points on the Honam express raildroad which contain ellipsoid heights estimated by GPS/Leveling and orthometric heights by leveling were used. Geoid heights were calculated uisng orthometric and ellipsoid heights of 360 railroad reference points, and the RMSE's with respect to different intervals of reference points were analysed which were induced by interpolation methods. The results showed that no significant difference of RMSE's among interpolation. methods. RMSE's of 0-4km interval of reference points were determined within 2cm and 5-8km were within 3cm. Also, this research confirmed that GPS leveling with Geoid model is not auurate enough to be used for railroad surveying as yet.

Study on Coordinate Transformation of Railroad Central Linear-line Using the Railroad Reference Points (철도기준점을 이용한 철도중심선형 좌표변환에 관한 연구)

  • Moon, Cheung-Kyun;Heo, Joon;Kang, Sang-Gu;Kim, Il-Joo;Park, Jae-Hong;Kim, Sung-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.685-691
    • /
    • 2007
  • In this paper through Honan high-speed railroad which is planned with the north and south axis, we will verify the feasibility of the coordinate conversion using railroad control points after regarding current planned-railroad as the linear central axises. From analysis, distortion of Y axis varies 21 cm to 40 cm diminishing to a gentle straight line, distortion of X axis varies 14 cm to 29 cm. Through a revision, the deviation value between the coordinates were 6 mm to 9 mm and it satisfied the allowable error of national geographic information institute which is following ITRF (International Terrestrial Reference Frame) and cadastral boundary survey (10 cm). consequently the coordinate conversion is possible using railroad control points as common control points.

Deflection Limit based on Vibration Serviceability of Railway Bridges Considering the Correlation between Train Speed and Vertical Acceleration on Coach (열차의 주행속도와 차체연직가속도의 상관관계를 고려한 철도교량의 진동사용성 처짐 한계)

  • Jeon, Bub-Gyu;Kim, Nam-Sik;Kim, Sung-Il
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.6
    • /
    • pp.545-554
    • /
    • 2011
  • In order to get dynamic serviceability of a train travelling on a railway bridge, comfort limits with the deflection of bridge and vertical acceleration on car body are proposed in Eurocode, Shinkansen design criteria, The design guideline of the Honam High-speed railway. The design guideline of the Honam High-speed railway has quoted Eurocode. Therefore it is expected that supplementation of comfort limit of railway bridge according to expansion of span length and the improvement traveling speed of trains in the future would relatively fall behind developed countries in railway. Therefore, in order to secure technological competitiveness in world market, the study was conducted to propose the deflection limit based on vibration serviceability of railway bridges that can consider bridge-train interaction and travelling speed increase. The parameter study and bridge-train dynamic interaction analysis was conducted to figure out the correlation of vertical acceleration on car body and bridge displacement according to the increase in travelling speed. Also, the trend of increasing vertical acceleration on car body according to the increase in travelling speed was confirmed, and the amplification coefficient of vertical acceleration on car body was suggested. And the deflection form and vibration of the bridge were assumed to be in harmonic motion, and transfer function and the amplification coefficient were used to develop the dynamic serviceability deflection limit of the high-speed railway bridge as a formula.