Journal of Korean Association for Spatial Structures
/
v.6
no.3
s.21
/
pp.51-57
/
2006
The object of this study is to examine the managerial characteristics of the Korean building projects. The study in this paperproposes to investigate the factors that affect process quality not only in the construction phase but also in all three phases (design, construction, and operation) of the whole life cycle of a building project. A questionnaire survey is conducted to investigate the differences in the perceptions of graduate students, professors, designers and practitioners with regard to process quality in building projects. Analyzing these factors helps in revising and improving the Korean existing quality control system and programs. The findings indicate that cooperation of designer's professionals, level of management leadership in promoting quality, ability to operate the facility within design limits are important factors. Theparticipation percentage of "quality" treated in any course/seminar shows only 45%. It is recommended that college programs include courses that treat the administrative aspects involved in the building project and that continuing education programs rover quality training.
This theory focuses on the Enterprise Portal and researches and analyzes the user requirement on as-is system. The UI Checklist Matrix is made based on the result of user analysis and evaluation of checklist. The horizontal axis of the Matrix is composed of 6 results(Layout, Navigation, Information, Function, Visibility and Interaction) of user requirement analysis. The vertical axis of the Matrix is composed of 10 subjects, Learnability, Efficiency, Accuracy, Accessibility, Consistency, Agility, Convergence, Personalization, Technology, and Standardization. At the point of vertical and horizontal items meet, indicates the graded of importance and defines a details item. The Guideline in which Matrix is reflected is set and according to the guideline, designing the business screen and assessing the Matrix.
한전의 신배전정보시스템(NDIS)은 지리정보시스템(GIS)을 활용하여 전국에 시설되어 있는 방대한 배전설비를 데이터베이스로 구축한 후 배전계획, 배전설계, 공사관리, 준공정산, 자산취득, 유지보수 등 배전분야 전반의 업무를 수행하고 고객정보시스템과 연계하여 영업업무를 지원하는 시스템으로 저압공급방안검토, 고압계통분석, 보호협조검토, Simulation 등 배전분야에서 필요한 다양한 기술지원 기능과 경제적인 투자계획, 효율적인 유지보수 등을 위한 배전통계 및 자원정보 등 장기적 관점의 경영정보 인프라를 구축하여 배전설계에서 준공까지 업무흐름 표준화, 업무처리 절차, 방법 등을 시스템에서 자동 지원토록하여 반복적인 배전정보 관리업무의 정확도 향상을 목적으로 만들어진 시스템이다. 신배전 정보시스템의 배전설비는 모두 위치값을 가지고 있는데 지중배전설비는 위치에 대한 측량 및 탐사를 시행하여 신배전정보시스템에 DB입력하여 사용하고 있으며 이 입력 좌표체계는 한정된 일부지역에서만 사용할 수 있는 동경측지계를 사용하고 있다. 2010년 부터는 이동 경측지계를 전 세계적으로 GPS측량값을 그대로 적용할 수 있는 세계 측지계로 사용토록 측량법에 명시되어 있어 신배전정보시스템의 배전설비를 전환 프로그램을 개발하여 전환하고자 한다.
In the research and development processes of new product, the design objects are frequently redesigned on the basis of experimental results. Most of the conventional CAD systems are based on the computer simulation to reduce the number of redesign. However, these types of CAD systems do not have the functions to infer the cause of trouble in experiments of mock-up and the redesign counterplan of new product. This paper proposes a methodology to establish the DESYR ver. 1(Design Expert SYstem for Research and development) system, which possesses the engineering model of design object in the model database, and refines the model on the basis of experimental results of the prototype. The blackboard inference model has been applied to infer the redesign counterplan. And the validity of DESYR ver. 1 system has been verified by developing the new type of magnetic bearing.
Transactions of the Korean Society of Mechanical Engineers A
/
v.37
no.11
/
pp.1429-1436
/
2013
This study presents an approach for designing a vehicle rollover prevention controller using differential game theory and multi-level programming. The rollover prevention problem can be modeled as a non-cooperative zero-sum two-player differential game. A controller as an equilibrium solution of the differential game guarantees the worst-case performance against every possible steering input. To obtain an equilibrium solution to the differential game with a small amount of computational effort, a multi-level programming approach with a relaxation procedure is used. To cope with the loss of maneuverability caused by the active suspension, an electronic stability program (ESP) is adopted. Through simulations, the proposed method is shown to be effective in obtaining an equilibrium solution of the differential game.
The Journal of the Korea institute of electronic communication sciences
/
v.12
no.2
/
pp.315-324
/
2017
The smart grid with distributed power supply introduces a number of problems including not only the problems of the existing power grid but also the problem of protection co-operation due to new electric phenomenon because it has a mixed operation structure combining the existing radial operation structure and the new loop operation structure. The EMTP based power system analysis method has flexibility and convenience from the view of system configuration but it requires another experimental verification because of uncertainty of design and analysis results. On the other hand, the real demonstration system has difficulties in observing accurate fault on large scale system due to considerable economical and spatial construction cost, system configuration constraint, and it is difficult to demonstrate the distributed, autonomous and adaptive control strategy of smart grid. In this paper, a basic theory for a micro smart grid simulator design using MEMS(Micro Electro-Mechanical Systems) miniaturization technology is studied which can safely and freely experiment and observe electrical phenomena, and distribution, autonomous adaptive control strategy for disturbances on 22.9kV smart grid under minimum economic and spatial cost.
Korean Journal of Construction Engineering and Management
/
v.13
no.5
/
pp.113-124
/
2012
TACT process reengineering is applied to the finish work of apartment buildings and extra tall buildings to conduct efficient process control in Korea. Non-systemized information on the performances, however, causes difficulties in building a database for such records and it takes long time to find the relevant information. In order to solve such problems, scientific and quantitative understanding on the construction information and data is required to perform TACT process reengineering satisfactorily and also proper management plan should be provided for the working level staff to understand the required information and data more easily. In this regard, this paper reorganizes the TACT process reengineering based on the general process control and classifies the items of required information to redesign. Redesigned process was verified by specialists making use of work-information matrix. As a result, paper contributed to increasing comprehension level of the working level people and when the persons in charge are transferred to other duty, it makes them understand all the working procedure faster, which enables the departments involved to carry out their cooperation and adjustment more efficiently.
A plan of construction of subsea tunnels connecting Korea-Japan and Korea-China have been discussing over the past several ten years. This paper were wrote about the present capacity of our engineer, the cooperation plan of politics and economy. Especially we examined and studied resolution method and technical problem in the construction of Sub-sea tunnel. In terms of excavation technology, Blasting and water resistance technology should be cared considering the status of rock such as fault in the deep sea. After of a construction work, it should be carefully designed and constructed for the fire and leakage management in Tunnel, It should be applied to High Construction Management Professional and Value Management(CVS) etc.
Journal of Institute of Control, Robotics and Systems
/
v.16
no.9
/
pp.891-897
/
2010
This paper proposes a cooperative control algorithm for a dual-arms robot which is carrying an object to the desired location. When the dual-arms robot is carrying an object from the start to the goal point, the optimal path in terms of safety, energy, and time needs to be selected among the numerous possible paths. In order to quantify the carrying efficiency of dual-arms, DAMM (Dual Arm Manipulability Measure) has been defined and applied for the decision of the optimal path. The DAMM is defined as the intersection of the manipulability ellipsoids of the dual-arms, while the manipulability measure indicates a relationship between the joint velocity and the Cartesian velocity for each arm. The cost function for achieving the optimal path is defined as the summation of the distance to the goal and inverse of this DAMM, which aims to generate the efficient motion to the goal. It is confirmed that the optimal path planning keeps higher manipulability through the short distance path by using computer simulation. To show the effectiveness of this cooperative control algorithm experimentally, a 5-DOF dual-arm robot with distributed controllers for synchronization control has been developed and used for the experiments.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.406-409
/
2003
The procedure of present military facility remodeling has many problems at the stage of evaluating the priorities in various remodeling projects which have been caused from lots of corps. These problems have usually happened not only because of the shortage of the cooperation system in the related divisions but also because of the nonexistence of the effective process and method for evaluating the priorities. I've reviewed the study of remodeling and military facility business and applied the AHP(Analytic Hierarchy Process) method which is effective to evaluate the priorities in various groups' decision.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.