• Title/Summary/Keyword: 현장 적용결과

Search Result 5,647, Processing Time 0.036 seconds

Estimation of Undrained Shear Strength of Clay under Failed Slope (사면파괴 하부 점토지반 비배수강도의 평가)

  • Lee, Seung-Hyun;Han, Jin-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.11
    • /
    • pp.5572-5577
    • /
    • 2012
  • Results of in-situ test, laboratory test and strength prediction method for the soft soil underlain by failed road embankment were compared each other. Comparing cone penetration test results with the field vane test results it can be seen that cone factor is 12. Undrained shear strengths determined from the cone factor which was predicted by prediction equation were smaller than those obtained from field vane tests. Among the prediction methods Jamiolkowsky's method gave close strengths to the measured undrained shear strengths by field vane tests and strength ratio were 0.88~1.23.

The study of Applicabilities for Sediment Yield Model in the Developing Area (개발지역에서의 토사발생규모와 모형의 적용성 연구)

  • Park, Mu-Jong;Kim, Yang-Su
    • Journal of Korea Water Resources Association
    • /
    • v.34 no.1
    • /
    • pp.3-17
    • /
    • 2001
  • The purpose of this study is to understand applicabilities of sediment yield estimation technique with observed data in the field accelerated by human activity. Commonly used equations such as Universal Soil Loss Equation and Transport Research Board etc. from foreign country is not validated. And analyzing affecting parameters and understanding limit of each estimation technique is not examined, either. To test the applicabilities of several models, a hot spring development site in Chunahn city, Chungnam province is selected. Sediment yield of catchment is determined using RVSLE, TRB, MUSLE, SLEMA, and Morgan & Finned method and compared to actual measurement. It is found that RUSLE and TRB are overestimated and MUSLE dives a rotatively resonable value.

  • PDF

Parameter Estimation of Chiu's Two Dimensional Velocity Distribution Equations (Chiu-2차원 유속분포식의 매개변수 추정)

  • Kim, Yongseok;Yang, Sungkee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.366-366
    • /
    • 2017
  • 하천의 유량관측 자료는 지표수자원의 확보와 수공구조물의 설계를 위해 가장 기초적인 수문자료로써 정밀하고 지속적인 관측을 요구한다. 최근 유량 관측법은 접촉식 유속측정 방법의 단점을 보완한 전자파 표면유속계나 영상분석기법을 적용한 표면영상유속계(SIV)가 활용되고 있다. 이들 관측장비는 표면유속 관측법에 의해 유량을 측정하므로 보다 정밀한 유량자료를 확보하기 위해서는 측정 영역의 표면유속과 단면의 평균유속에 대한 해석이 필요하다. 이 연구에서는 제주도 남부지역에 위치한 강정천을 대상으로 2011년 7월부터 2015년 6월 까지 월 1~2회 현장관측한 ADCP 자료를 활용하여 Chiu(1987)가 제안한 2차원 유속분포식의 매개변수를 추정하여 정밀한 유량을 산정하였다. 또한 표면영상유속계(SIV)로 산정된 표면유속을 Chiu-2 차원 유속분포식에서 평균유속으로 환산하여 기존의 표면유속을 일률적으로 적용한 수심평균유속 환산계수인 0.85의 적용 값과 비교 분석하였다. 대상하천의 현장에서 72회 관측된 ADCP 자료를 활용하여 각각의 최대유속과 평균유속을 분석하고 엔트로피 계수(M)를 산정한 결과와 유속의 공간적 분포를 모델링하기 위해 제시되는 $_{urf}$를 산정하였으며, 산정된 계수 값을 이용하여 표면유속을 계산한 결과와 ADCP의 관측된 표면유속의 $^2$는 0.874로 나타났다. 이러한 결과는 Chiu-2차원 유속분포식을 연구대상하천에 적용하는 과정에서 추정되는 매개변수의 평균값 사용에 대한 타당성을 보여준다. 이 후 추정된 하천매개변수를 하천현장에 적용성 확인을 위해 강정천의 동일 관측지점에서 표면영상유속계(SIV)를 사용한 표면유속과 유량을 산정함과 동시에 ADCP에 의한 유속 및 유량과 비교 분석하였다. 표면영상유속계(SIV)로 분석된 유속 벡터를 Chiu-2차원 유속분포식에 적용하여 산정된 유량과 기존의 수심평균유속환산계수 0.85를 적용한 유량은 각각 $0.7171m^3/s$과 0$0.5758m^3/s$였다. ADCP 평균유량 $0.6664m^3/s$과의 오차율은 각각 7.63%, 13.64%로 나타나 Chiu-2차원 유속분포식을 적용한 유량이 수심평균유속환산계수 0.85를 적용한 유량에 비해 작은 오차율을 보였다.

  • PDF

Advanced and Application of Onsite EEW Technology in Korea (국내에서의 지진현장경보 기술 고도화 및 적용)

  • Lee, Ho Jun;Jeon, Inchan;Seo, Jeong Beom;Lee, Jin Koo
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.4
    • /
    • pp.670-681
    • /
    • 2020
  • Purpose: This study aims to derive a PGV prediction equation and to enhance the application of the Onsite EEW technology which has developed through previous studies. Method: The prediction equation for the Onsite EEW derived from earthquake data M≥3.0 and MMI≥II over the past four years. Local seismic risk is estimated using M and PGV deduced from P wave properties. Result: The improved PGV prediction equation estimated the MMI with an average accuracy of 94.8% and the 𝜏c : Pd method also showed valid performance for alerting local seismic risks. Conclusion: Onsite EEW technology is successfully applied to Korea, and becomes to reduce the blind zone to about 14km.

A Field Evaluation of Calcium Carbonate Scale Prevention using Molecular Vibration in Subway Tunnels (분자진동을 이용한 스케일 방지 기술의 지하철 터널 내 현장적용성 평가)

  • Park, Eunhyung;Chu, Ickchan;Lee, Jonghwi;Kim, Hyungi;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.27-33
    • /
    • 2012
  • The purpose of this study is to evaluate the field applicability of Quantum Stick in scale deposit prevention for subway tunnels in Seoul. This technology was installed into drainpipes and its performance was monitored through occasional site visits. SEM and EDS were also performed on scale collected from these drain pipes. Results showed a decrease in scale deposits due to Quantum Stick treatment. In the field test, the device was found to be effective in preventing scale formation in new pipes as well as reducing existing scale in previously installed pipes. However, further investigations are necessary to account for various environmental conditions. In conclusion, the results indicate that molecular Vibration technology is effective in suppressing scale formation.

The Development of a System for Diagnosis and Fault Detection of Semiconductor Manufacturing Processes (반도체 제조 공정의 진단 및 고장 예측 시스템 개발)

  • 김수희;유성록;박희찬
    • Proceedings of the KAIS Fall Conference
    • /
    • 2000.10a
    • /
    • pp.124-127
    • /
    • 2000
  • 반도체 제조 공정의 진단 및 고장 예측 시스템을 개발하기 위해 PCA(Principal Component Analysis) 기법을 적용하여 데이터 분석을 하고자 하며, 이에 대한 이론적인 연구와 연구 수행 절차를 구체적으로 정립하였다. 비쥬얼 C++에서 MATLAB과 PLS_Toolbox 등을 연동하여 직관적이고 시각적이며 사용자가 효율적으로 공정 현장에 적용할 수 있는 시스템을 개발하고자 한다. 지금까지 PCA와 관련한 다양한 문헌 조사를 수행하였고, 이론적인 연구를 하였다. 비쥬얼 C++ 프로그램에서 MATLAB과 PLS_Toolbox 등을 연동하기 위해 필요한 환경 선정 등을 완료하였으며, 초기 단계의 간단한 모듈들을 개발하였다. 다음 단계의 모듈들은 좀 더 빠른 시간에 개발할 수 있을 것으로 기대한다. 이를 공정 현장에서 수집한 다양한 데이터에 적용하여 그 결과를 피드백하여 시스템을 수정하고 보완하고자 하며, 마지막으로 현장에 적용하고자 한다.

Evaluation of engineering characteristics and field applicability of inorganic thixotropic-grout for backfilling of shield TBM tail voids (쉴드 TBM 뒤채움용 무기계 가소성 그라우트의 공학적 특성 및 현장적용성 평가)

  • Kim, Dae-Hyeon;Jung, Du-Hwoe;Jeong, Gyeong-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.1
    • /
    • pp.75-85
    • /
    • 2010
  • The focus of this study is to evaluate the field applicability of the newly developed inorganic thixotropic-grout in various ways. In order to do this, the volume stability and the permeability of the inorganic thixotropic-grout have been measured and compared to the existing silica type grouts. In addition, the filling capability of the grout into the tail void has been evaluated through both an experiment with a miniature tail-void filling equipment and a test filling at the shield TBM construction site. The volume loss of the inorganic thixotropic-grout after a 14 day-curing under the atmosphere condition was appeared to be minimal. The excellent waterproofing ability of the inorganic thixotropic-grout was confirmed through a permeability test. The toxicity of the inorganic thixotropic-grout has been evaluated through a toxicity test of aquatic fishes (KS M 0111) and the pH value of the liquid eluviated from inorganic thixotropic-grout was measured as an average of 8.0 and a fatality rate of goldfish after 96 hours was 10% or so. The existence of harmful heavy metals in the liquid eluviated from the inorganic thixotropic-grout has been also examined through an atomic absorption spectroscopy (AAS) test. Any of harmful heavy metals were not detected and the detected level of $Cr^{6+}$ and Cd was far below the standard. Based on both an experiment with a miniature tail-void filling equipment and a test filling at the shield TBM construction site, the filling ability of inorganic thixotropic-grout into the tail void was proved to be excellent.

An Evaluation of Epoxy Asphalt Mixtures for Long-Span Steel Bridge Deck (장경간 강바닥판 교량용 에폭시 아스팔트 혼합물의 적용성 평가)

  • Baek, Yu Jin;Park, Chang Woo;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.579-586
    • /
    • 2012
  • The main objective of the research is to evaluate the laboratory performances of epoxy asphalt mixtures for long-span steel bridge decks. The aggregate gradations were recommended for field applications. The laboratory performance test results showed that the durability of epoxy asphalt mixtures was more noticeable than that of conventional ones. The structural analysis was conducted using resilient modulus and bond-shear test results. The analysis results revealed that just 9% out of total bond-shear stress was enough for the entire required bond-shear stress in the pavement system. The tensile stresses in the bridge decks were within limits compared to the laboratory test results from the Nanjing Grand Bridge in China. As a result, the laboratory performances of the epoxy asphalt mixtures for long-span steel bridge decks were better than those of conventional asphalt mixtures. However, the laboratory performance tests of epoxy asphalt mixtures for long-span steel bridge decks should be conducted precisely since the strengths of the mixtures are sensitive to the temperatures and curing times.

The Bearing Capacity Comparison of Drilled Shaft by the Static Load Test and the Suggested Bearing Capacity Formulas (현장타설말뚝의 정재하시험에 의한 지지력과 이론식에 의한 지지력과의 비교)

  • 천병식;김원철;최용규;서덕동
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.2
    • /
    • pp.237-246
    • /
    • 2003
  • The driven pile has environmental problems such as vibration and noise. Especially, if the site consists of gravel, cobble and weather rock, the driven pile can not be applied. Therefore, the application of the drilled shafts is increasing in Korea. However, the bearing capacity values by the suggested theoretical formulas are generally considered too conservative. In this paper, static load tests for the rock socketed drilled shaft at Gwangandaero and Suyeong3hogyo are performed and in order to estimate the side friction of the shaft, strain gauges are applied. The bearing capacities from the field test data and the bearing capacity values by the theoretical formula are compared. Even the static load tests didn't reach to the ultimate bearing capacity condition, and all the measured bearing capacity values were higher than those by the theoretical formulas. The field data also showed that the major bearing capacities were not due to end bearings but side friction resistances. Based on the above results, several suggestions are proposed for the drilled shaft design.

Efficient Productivity Evaluation System in Construction Site (건설현장 생산성 측정의 효율적 방안 제시)

  • Jang, Hyo-Won;Kim, Soo-Yong;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.666-669
    • /
    • 2007
  • 건설 공사에 있어서 생산성은 중요한 의미를 가지고 있다. 하지만 국내 건설현장에서의 샌산성에 대한 인식은 상당히 낮은 것으로 보이며, 건설현장에서의 생산성에 대한 인식변화 및 활성화를 위한 토대를 마련하는 연구는 드물었다고 판단된다. 기존의 생산성 측정에는 많은 방법들이 사용되어지고 있으며, 이러한 측정 기법들은 생산성 측정에 있어서 결과만을 모니터링하고 보다 나은 결과물을 획득하는데 그 목적이 있어왔다. 하지만, 해외의 경우 건설 생산성의 초기투입단계에서의 관리와 노력을 통해 생산성을 향상시키고자 하고 있다. 따라서 본 연구에서는 린 건설에 관련하여 기존의 생산성 측정보다 쉽게 생산성을 측정할수 있고 빠른 피드백을 얻을 수 있는 percent plan complete(PPC)의 기법을 적용한 새로운 생산성 관리가 어떠한 프로세스로 이루어지고 있는지 분석하고 국내 건설 현장의 새로운 생산성 관리 시스템 구축의 기반을 마련코자 한다. PPC는 계획되어진 작업계획의 신뢰성과 생산성을 측정 가능토록 해주며, 린 시스템의 적용이 필주적으로 수반되어야 한다. PPC 측정 후 작업이 실패되었을 경우 그 이유를 파악하고 원인 분석이 이루어져야 한다. 그렇게 된다면 어떤 공정에 대한 결과를 평가할 수 있고 그 과정에서 미래에 발생할수 있는 작업 실패를 예방할 수 있다.

  • PDF