• Title/Summary/Keyword: 현장용접

Search Result 235, Processing Time 0.029 seconds

Test research of Structural Safety for Steel Wire-Integrated Deck Plate System (철선일체형 데크 플레이트 구조성능평가를 위한 실험적 연구)

  • Lee, Yong-Jae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.6
    • /
    • pp.220-228
    • /
    • 2010
  • A steel wire-integrated deck plate that welds integrated triangle truss steel wires on a galvanized steel sheet is developed to reduce construction costs of a slab or formwork such as shores and supports, and it is already widely applied in many construction fields. This study selected upper and lower steel wires, lattice steel wires, span, and cutting methods of ends as variables, and conducted an experimental test by manufacturing a total of 32 full scale test bodies. According to the result, changes in final destruction types of the test bodies and cutting methods of ends didn't affect structural performance of test bodies, and for a 3.2m-span test body, there was no big problems in using ${\Phi}4.5$ of lattice steel wires.

A Study on the Productivity Analysis of Slab Construction Methods - Focused on Conventional Slab, Form Deckplate, Ferro Deckplate, and Kem Deckplate - (슬래브 공법간의 생산성 분석$\cdot$비교에 관한 연구 - 재래식 슬래브, 골형 데크플레이트, 철근트러스 데크플레이트, 그리고 내화구조용 뎨크플레이트를 중심으로 -)

  • Yoo Jin-Ho;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.401-405
    • /
    • 2001
  • The purpose of this study is to provide productivity analysis of conventional slab method productivity and deckplate methods in building construction. Productivity analysis was performed on the data in construction sites and a interview survey. The results of this study are as follow: 1. Kem deckplate is analyzed to the most economic in a view of the cost. 2. Kem deckplate is analyzed to the most economic and order Ferro deckplate, Form deckplate and conventional slab method in a view of the productivity. 3. Kem deckplate is analyzed to the superior slab method in a view of the quality. 4. Conventional slab method is investigated disaster of precipitation and Deckplate method is hazard of an eletric shock. Therefore, Kem deckplate method is analyzed to the superior productivity

  • PDF

Bending Fatigue Life Assessment of Aged CWR using the Field Test (현장측정을 통한 노후레일의 휨 피로수명 평가)

  • Park, Yong-Gul;Sung, Deok-Yong;Park, Hong-Kee;Kong, Sun-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.317-325
    • /
    • 2008
  • As a result of recent research, it is reported that the periodic replacements criterion of rails is able to extend as grinding rail surface and using the continuous welded rail (CWR). This study evaluated correlation between conditions of track and load capacity of rail by analysing the dynamic response of track while the metro train is running. Also, it was converted the measured stress waveform into stress frequency histogram by the rain-flow counting methods, and then accumulated fatigue damage ratio and remaining service life of laid rail were calculated so as the apply the equivalence of stress to S-N curve of a new welded rail. Finally, this study suggests a revision of the periodic replacements criterion of CWR, which was based on accumulated passing tonnage, classified by the types and conditions of track system.

Development of wall climbing robot using vacuum adsorption with legged type movement (진공 흡착과 보행형 이동에 의한 벽면이동 로봇의 개발)

  • Park, Soo-Hyun;Seo, Kyeong-Jun;Kim, Sung-Gaun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.8
    • /
    • pp.344-349
    • /
    • 2017
  • Wall-climbing robots have been developed for various purposes, such as cleaning skyscraper windows, maintaining large structures, and welding vessels. Conventional wall-climbing robots use movement systems based on wheels or legs. However, wheeled robots suffer from slipping effects, while legged systems require many actuators and control systems for the complex linkage structure, which also increases the weight of the robot. To overcome these disadvantages, we propose a new wall-climbing robot that walks based on gorilla locomotion. The proposed robot consists of a DC drive motor, a vacuum pump for adsorption, and a micro controller for controlling the system. The performance of the robot was experimentally verified on vertical and horizontal flat surfaces. The robot could be used for various functions in industrial sites or disaster areas.

Development of Steel Wire-Integrated Deck Plate Applicable to Slab with 180mm Thickness (두께 180mm 슬래브에 적용 가능한 철선일체형 데크 플레이트 개발)

  • Lee, Yong Jae;Yoon, Sang Chun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.1
    • /
    • pp.89-98
    • /
    • 2012
  • A steel wire-integrated deck plate that welds integrated triangle truss steel wires on a galvanized steel sheet is developed to reduce construction costs of slabs or formworks such as shores and supports, and it is already widely applied in many construction fields. In this research, experimental tests for 14 full scale specimens, which are in the same field conditions, are conducted on several parameters such as the diameter of top, bottom and lattice steel wire, cutting methods of ends. According to the result, changes in final destruction types of the test bodies and cutting methods of ends didn't affect structural performance of test specimens, and for a 4.0m-span test specimen, there was no big problems in using bottom bar D7 or D8.

An Intelligent Tutoring System for Nondestructive Testing Training (비파괴검사를 위한 지능형 교육 시스템 개발)

  • Kim, J.K.;Koh, S.N.;Kim, M.K.;Shim, Y.J.
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.18 no.1
    • /
    • pp.27-32
    • /
    • 1998
  • This paper is written to introduce a multimedia tutoring system for nondestructive testing using personal computer. Nondestructive testing, one of the chief methods for inspecting welds and many other components, is very difficult for the NDT inspectors to understand its technical basis without a wide experience. And it is necessary for considerable repeated education and training for keeping their knowledge. The tutoring system that can simulate NDT works is suggested to solve the above problem based on reasonable condition. The tutoring system shows basic theories of nondestructive testing in a book-style with video images and hyper-links, and it offers practices, in which users can simulate the testing equipment. The book-style and simulation practices provide effective and individual environments for learning nondestructive testing.

  • PDF

Development of Split Tees for Gas Steel Pipelines (강재 가스배관용 분기티의 개발 연구)

  • Kim Young Gyu;Noh Ou Sun;Kim Ji Yoon
    • Journal of the Korean Institute of Gas
    • /
    • v.4 no.4 s.12
    • /
    • pp.6-12
    • /
    • 2000
  • We have developed a new split tee which can be used to effectively branch into a main gas steel pipelines without losing any gas pressure or having to shut down a line. The split tee has been designed considering the locations of branch connection to the pipelines. Therefore, we could keep the depth of buried pipelines which used to be the problem of the conventional split tees. Test results of the developed split tee showed that the performance of the tightness, hydraulic strength, sealing, welding, bending, and compatibility were excellent. The application of the split tee can provide the advantage of eliminating cost and time, and easy field pipeline coatings.

  • PDF

Evaluation of Low Temperature Properties in EH36 Thick Steel Plate Welded Material by Instrumented Indentation Equipment (계장화 압입시험기를 이용한 EH36 후판 용접재의 저온특성 평가)

  • Kim, Gwi-Nam;Lee, Jong-Seok;Hyeon, Jang-Hwan;Jung, Yong-Gil;Huh, Sun-Chul
    • Journal of Power System Engineering
    • /
    • v.18 no.4
    • /
    • pp.104-111
    • /
    • 2014
  • In this study, EH36 is thick steel plate, which welded by auto $CO_2$ gas welding machine, has been applied on offshore filed. The specimen was examined by indentation tester and it was measured for fracture toughness at $18^{\circ}C$, $0^{\circ}C$, $-20^{\circ}C$ and $-45^{\circ}C$ by low temperature chamber, respectively. The absorbed energy was got on same temperature by Charpy impact tester. The weld surface was observed for watch of changed crystalline structure by optical microscope, and fracture surface of impact test specimen were observed by scanning electron microscope(SEM).

A Study on Monitoring of Mitigation of Rail Corrosion using Sacrificial Anode Cathodic Protection Method (희생양극법을 적용한 철도 레일의 방식효과 모니터링 연구)

  • Choi, Jung-Youl;Park, Jong-Yoon;Lee, Kyu-Yong;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.367-371
    • /
    • 2019
  • In this study, we proposed the sacrificial anode cathodic protection method as a countermeasure to reduce the corrosion of railway rails under oceanic climatic conditions and proved the anticorrosive effect experimentally. In addition, the proposed sacrificial anode cathodic protection method were tested on site to examine long-term rail corrosion monitoring and field applicability for more than 26 months and to prove the effectiveness of rail corrosion. As a result of monitoring the corrosion state using the cellophane tape method, the appearance of the applied sections with sacrificial anode cathodic protection method was good at the present time about 26 months after the field test laying, and no abnormalities and other abnormalities of the rail welded section and the rail web were found. Hence, in places where no sacrificial anodes were installed, rust progressed rapidly. In addition, the proper spacing of sacrificial anodes was found to form the most stable corrosion coating at 1.0 ~ 1.5m. After about 26 months of monitoring, the installation of sacrificial anodes could help stabilize the overall rail corrosion level, even if the spacing was somewhat wider.

Experimental Study on Steel Beam with Embossment Web (엠보싱 웨브를 가지는 보 부재의 실험적 연구)

  • Park, Han-Min;Lee, Hee-Du;Shin, Kyung-Jae;Lee, Swoo-Heon;Chae, Il Soo
    • Journal of Korean Society of Steel Construction
    • /
    • v.29 no.6
    • /
    • pp.479-486
    • /
    • 2017
  • Steel beams with corrugated web have been widely used in the steel structures. However, it is challenging to weld the section between the corrugated web and the flange straight, which increases the cost of production. In order to solve this issue, steel beam with intaglio and embossed web (It is called an IEB) was invented. A web with embossment is produced by cold pressing and welded to flange by automatic welding machine. The loading tests were conducted to investigate the load-carrying capacity of IEB, and its test result was compared with that of H-shaped beam having a same size of flange and web. The test results of IEB series showed about 40% higher load capacities than H-shaped series. As a result of comparing the IEB specimen with Eurocodes for steel beams with corrugated web, all of specimens tested in this study did not meet the design value. Therefore, it is difficult to apply existing formula to IEB and new design formula should be presented for field application.