• Title/Summary/Keyword: 해체 경로

Search Result 62, Processing Time 0.018 seconds

An Analysis of the Uncertainty Factors for the Life Cycle Cost of Light Railroad Transit (경량전철 교량 LCC분석을 위한 불확실성 인자 분석)

  • Won, Seo-Kyung;Lee, Du-Heon;Kim, Kyoon-Tai;Kim, Hyun-Bae;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.396-400
    • /
    • 2007
  • Various ways of automated guideway transit construction are being planned recently owing to the policies of the national government and local municipalities as well as increasing investment from the private sector. Particularly, the increase in the private investment is increasing greatly in SOC (Social Overhead Cost). This trend of promoting private sector investment must be conducted on the basis of a thorough analysis of the economic feasibility of the project from the government and construction companies in the private sector. In other words, an accurate cost analysis of initial investment cost (Construction cost), maintenance/repair cost, profit making through the operation of the concerned facilities, cost of dissolution, etc. in terms of the life cycle is very much in need. Nevertheless, the analysis of uncertainty factors and its probabilistic theory are in need of development so that they can be used in the analysis of the economic feasibility of a construction project. First of all, the actual studies on maintenance/repair cost of automated guideway transit are scarce as of yet, prohibiting an accurate computation of the cost and its economic analysis. Accordingly, this study focused on the uncertainty analysis of the economic feasibility for civil engineering structures among automated guideway transit construction projects based on the rapidly increasing investment on such structures from the private sector. For this research purpose, a cost classification system for the automated guideway transit is proposed, first of all, and the data On the cost cycle of the civil structure facilities and their unit cost are collected and analyzed. Then, the uncertainty in the cost is analyzed from the perspective of LCC. In consideration of the current status with almost no. studies on maintenance/repair of such facilities, it is expected that the cost classification system and the uncertainty analysis technique proposed in this study will greatly enhance LCC analysis and economic feasibility studies for automated guideway transit projects in the future.

  • PDF

The Study on Restoration & Repair of the Seated Stone Statue of Buddha in the Samreoung Valley of Mt. Namsan (경주 남산 삼릉계 석불좌상 보존 및 복원 연구)

  • Jeong, Min Ho;Ji, Sung Jin
    • Korean Journal of Heritage: History & Science
    • /
    • v.43 no.3
    • /
    • pp.242-281
    • /
    • 2010
  • There are a large number of Buddhist cultural relics in Mt. Namsan. The cultural relics carry the spirit of people of Shila who dream of Buddhist Elysium and the establishment of Buddhist nation. In the valley and the top of the mountain and on various rock cliff, stone statues of Buddha and stone pagodas stand in harmony with nature. For that reason, Mt. Namsan is called an open-air museum. And it played an important role in establishing 'The UNESCO World Heritage' status for Gyeongdju in December 2000. But sadly, there are many stone relics that have eroded away and damaged from collapsing in the passage of time. The seated stone statue of Buddha in Samreoung valley of Mt. Namsan is one of them. It was created between the 8th and 9th century, and restored without much care nor extensive historical research in 1923. As a result, The face of the Buddha remained with concrete mortar and its nimbus fallen backward and destroyed. Therefore, restoration and repair as well as creation of a statue environment for the statue were urgent. So we immediately started in restoration and repair. First, through the archaeological excavation around the stone Buddha, we carried the stone Buddha on the original position. In order to restore the statues to its original glory created by the Unified Shila Dynasty, we created a restoration plan in corporation with art historians and historians, then restored the jaw and the damage nimbus. Second, we made the weathering & damage map of the stone Buddha. In order to prevent second damage, we cleaned the surface of contaminants with distilled water. Third, we studied restoration method to prevent artificial damage. We recreated parts of his face and halo. Then each parts of the statue were restored to their original position. In the whole process of restoration, we tried to use traditional techniques.