• Title/Summary/Keyword: 해체

Search Result 1,676, Processing Time 0.03 seconds

Consideration of Regulatory Systems for Decommissioning of Nuclear Power Plants (원자력발전소 해체 규제제도 개선을 위한 각국의 제도 고찰)

  • Ahn, Sang-Kyu;Jeon, In-Young;Cheong, Jae-Hak;Choi, Kyung-Woo;Jeong, Chan-Woo;Lee, Youn-Keun
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.4
    • /
    • pp.401-409
    • /
    • 2006
  • Regulatory systems for decommissioning of nuclear power plants in several countries, such as Japan, United States of America, Germany, United Kingdom, France, and Republic of Korea, are surveyed. In the survey, regulatory policies, legislations, licensing process, inspection and public involvements for decommissioning are identified and compared. Afterwards, the survey results will be utilized as a reference to establish the improvement directions of domestic regulatory system.

  • PDF

Review of the Acceptance Criteria of Very Low Level Radioactive Waste for the Disposal of Decommissioning Waste (극저준위 해체폐기물 처분을 위한 방사성폐기물 인수기준 분석)

  • Kim, Beomin;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.12 no.2
    • /
    • pp.165-169
    • /
    • 2014
  • In order to use the nuclear energy as the sustainable energy source, the safe and efficient management of radioactive wastes generated from the nuclear fuel cycle including NPP decommissioning is one of the most important factors. The establishment of acceptance criteria for very low level radioactive wastes generated from decommissioning of nuclear power plant in a large quantity is seemed to play a key role for developing a radioactive wastes disposal strategy as well as NPP decommissioning strategy. In this thesis, we want to review the acceptance criteria of low-and-intermediate-level radioactive wastes in this country through the analysis of other country's acceptance criteria.

A Study of Radiation Distribution for Dismantling a Nuclear Facility (해체 구조물의 방사화 분포 연구)

  • Park, Hee-Seong;Hong, Sang-Bum;Lee, Kyne-Woo;Jung, Chong-Hun;Jin, Seong-Il
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2006.11a
    • /
    • pp.299-302
    • /
    • 2006
  • 연구로 및 원자력 시설의 해체 공정 절차 수립과 해체 시나리오 선정에 기초 자료를 제공하고자 컴퓨터 그래픽스를 응용한 방사화 분포 가시화 연구가 수행되었다. 해체 전 시료 채취와 핵종 분석을 통해 방사능 자료가 확보된 연구로 2 호기 조사실(Exposure Room)과 조사실 주변의 콘크리트 차폐체(Concrete Shielding)를 대상으로 방사화 분포 가시화 실험이 이루어졌다. $^{60}Co$에 오염된 조사실의 벽면과 콘크리트 차폐체의 깊이 별로 조사된 방사능 농도 값을 기초로하여 이들 구조물을 3 차원으로 모델링 한 후 Contour mapping을 수행하여 방사화 분포 가시화를 완료하였다. 방사능 정도를 가시화 한 결과와 콘크리트 차폐체 깊이에 따라 지수 함수적으로 감소하고 있었던 결과가 잘 일치하고 있음을 확인할 수 있었다. 연구 결과 자료는 향후 해체 활동 중 방사선에 노출되는 작업자의 피폭선량 평가 모델에 중요한 역할을 수행할 것이다.

  • PDF

Reassessment on the Four Major Rivers Restoration Project and the Weirs Management (4대강 살리기사업의 재평가와 보의 운용방안)

  • Lee, Jong Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.4
    • /
    • pp.225-236
    • /
    • 2021
  • The master plan for the Four Rivers Restoration Project (June 2009) was devised, the procedure of pre-environmental review (June 2009) and environmental impact assessment (Nov. 2009), and post-environmental impact survey were implemented, and 4 times audits also inspected. and finally the Ministry of Environment's Four Rivers Investigation and Evaluation Planning Committee proposed the dismantling or partial dismantling of the five weirs of the Geum River and Yeongsan River. But controversies and conflicts are still ongoing. Therefore, this study intend to reestablish the management plan for the four major rivers by reviewing and analyzing the process so far. The results are as follows. First, a cost-benefit analysis should be performed by comparing the water quality impact of weir operation and weir opening. Therefore, it is inevitably difficult to conduct cost-benefit analysis. Second, according to the results of cost-benefit analysis on the dismantling of the Geum River and the Yeongsan River, the dismantling of the weir and the regular sluice gate opening was decided. However, there is a problem in the validity of the decision to dismantle the weir because the cost-benefit analysis for maintaining the weir is not carried out. Third, looking at the change in water quality of 16 weirs before and after the Four Major Rivers Restoration Project, COD and Chl-a were generally deteriorated, and BOD, SS, T-N, and T-P improved. However, in the cost-benefit analysis related to water quality at the time of weir dismantling, only COD items were targeted. Therefore, the cost of BOD, SS, T-N, and T-P items improved after the project were not reflected in the cost-benefit analysis of dismantling weirs, so the water quality benefits were exaggerated. Fourth, in the case of Gongju weir and Juksan weir, most of them are movable weirs, so opening the weir alone can have the same effect as dismantling when the water quality deteriorates. Since the same effect can be expected, there is little need to dismantle the weirs. Fifth, in order to respond to frequent droughts and floods, it is desirable to secure the agricultural water supply capacity to the drought areas upstream of the four majorrivers by constructing a waterway connected to the weir. At present it is necessary to keep weirs rather than dismantling them.

해외 정보 - 세계 주요국의 폐로 현황

  • 한국원자력산업회의
    • Nuclear industry
    • /
    • v.36 no.5
    • /
    • pp.76-85
    • /
    • 2016
  • 일반적으로 발전용 원자로의 수명은 30년부터 60년 정도로 예상하고 있다. 원자력 평화 이용 개시 초기에 건설된 발전로의 몇 기는 운전을 정지하였고, 또 사고나 경제성의 관점에서 수명이 되기 전에 운전을 정지한 발전로도 몇 기 존재한다. 전 세계에서 운전을 정지하고 폐지 조치되는 발전로는 2015년 8월 시점에서 소형의 Pilot Plant를 포함하여 156 기에 이른다. 이 중에서 현재까지 해체 완료된 발전로는 23기이며, 남은 것은 대부분 해체 중이거나 안전 저장 준비를 위한 공사 중이며 또는 안전 저장 중이다. 미국, 프랑스, 이탈리아 등에서는 운전 정지한 후의 해체 시기를 빠른 방향으로 진행하고 있다.

  • PDF

Gang Form Work System (갱폼 거푸집 시스템)

  • 박병근
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.5
    • /
    • pp.15-20
    • /
    • 2002
  • 갱폼이라 함은 주로 고층 아파트에서와 같이 평면상 상ㆍ하부 동일 단면 구조물에서 외부벽체 거푸집과 거푸집 설치ㆍ해체작업 및 미장ㆍ치장(견출) 작업발판용 케이지(cage)를 일체로 제작하여 사용하는 대형 거푸집을 말한다. 여기서 케이지는 갱폼에서 외부벽체 거푸집 부분을 제외한 부분으로 거푸집 설치ㆍ해체작업, 후속 미장, 치장(견출) 등 작업을 안전하게 수행하는데 필요한 작업발판, 안전난간 등으로 구성되어 갱폼 거푸집에 결합된 부분이며, 상부 케이지는 갱품 케이지의 4단 작업발판 중 거푸집 설치ㆍ해체작업용으로 사용되는 상부 2단 작업발판 구성 부분이고, 하부 케이지는 미장ㆍ치장(견출) 작업용으로 사용되는 하부 2단 작업발판 구성 부분을 말한다.(중략)

친환경적인 자동차 해체라인의 관리시스템 구축

  • 이현용;송준엽;윤주호;홍존희;이원배
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.209-209
    • /
    • 2004
  • 자동차 폐차대수의 증가에 따른 폐차처리가 심각한 환경 유해 요인이 되고 있다. 국내 자동차 보유대수가 2003년 12월 현재 1,458만대에 이르렀고, 2003년 한해에 폐차되는 폐차대수는 55만대에 이르고 있어, 향후 몇 년 안에 매립지 부족, 환경위해 등의 문제가 심각하게 대두될 전망이다. 또한 EU에서는 2015년까지 재활용 95%를 목표로 단계적인 법제화를 실시하고 있으며 이러한 추세는 전 세계적으로 확산될 것으로 보여 이에 대한 대응이 필요하다.(중략)

  • PDF

연구용원자로에서 조사된 캡슐 및 핵연료다발 해체용 갭슐절단기 개발

  • 박대규;주용선;안상복;이기순;강영환
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1998.05b
    • /
    • pp.503-508
    • /
    • 1998
  • 연구용원자로인 하나로(HANARO)에서 중성자 조사된 캡슐 및 핵연료다발을 절단 및 해체하기 위한 장비인 캡슐절단기를 개발하여 조사재시험시설(IMEF)의 M2 핫셀(hot cell)에 설치하였다. 재료 및 핵연료의 개발을 위해 하나로에서 조사되는 캡슐 및 핵연료다발의 절단 및 해체는 핵연료봉 및 캡슐내부에 내장되어 있는 시편에 손상 및 결함이 발생하지 않도록 하는 것이 매우 중요하며, 이러한 장비는 핫셀의 작업구역에서 원격조작기를 사용하여 원격으로 조작이 용이하도록 설계 및 제작되어야 한다. 이에 조사재시험시설에서 개발한 캡슐절단기는 가공물이 회전 및 좌우이송, 절단용 철이 회전 및 전후이송이 각각 되도록 하였고, 핫셀내에 설치하기 전에 가공에 필요한 최적의 조건을 설정하였다. 그리고 핫셀내 설치후 중성자에 조사되지 않은 하나로용 핵연료다발과 조사된 무계장캡슐을 건식상태로 절단 및 해체하여 장비 성능을 확인하였다.

  • PDF

Experience for The Decontamination & Decommissioning of The Core Assembly of KRR-2 Research Reactor (연구용 원자로 2호기의 로심 집합체 제염$\cdot$해체 경험)

  • 정경환;정기정;박진호
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.655-659
    • /
    • 2003
  • The research reactor (TRIGA Mark-III(KRR-2)) was constructed and had been operated in 1972. In 1999 the radioisotope process units had stopped its operation due to normal operation of HANARO. In 2003 the core assembly was decommissioned by D&D program. The contact exposure rate on the core assembly and the rotary specimen rack are from 300mSv/h to 700mSv/h. This report describes the decontaminationing procedures, the health physics programs, and the waste management.

  • PDF

전처리 집합체해체 핵심장치 디지털 목업 검증

  • Kim, Yeong-Hwan;Jo, Yong-Jun;An, Do-Hui
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2015.10a
    • /
    • pp.133-134
    • /
    • 2015
  • 전처리 공정장치 구축에 앞서 정확한 설계와 검증이 선행되어야 한다. 우선 디지털 목업 기술을 통해 설계검증을 철저히 함으로써 공정의 품질을 높이고 공정하자를 최소화 할 수 있다. 전처리 공정 중 집합체해체 핵심장치의 유지보수를 쉽게 하고, 원격 제어 효율을 높이기 위한 모듈화와 그에 대한 사전 검증을 수행하였다. 이를 위해해 전처리 디지털 목업 시스템 검증 대상과 집합체 해체핵심장치 주요모듈을 선정하였으며, 주요 모듈의 모듈화 방안 과 모듈 탈착 시간 검증하였다. 그 결과, 집합체해체 핵심장치에서는 5개의 주요 모듈로 구성되었으며, 모듈 탈착 시간 검증에서 작업시간은 클램프모듈이 약 130초, 언볼팅, 드릴링 모듈이 140초 소요될 것으로 분석되었다. 향후 전처리장치별 모듈 분석과 LAYOUT 운영을 포함해서 MSM 시뮬레이터의 디바이스 및 시뮬레이터 시스템 구축을 수행할 것이다.

  • PDF